Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20116P109 + (03:06:23, 13 December 2024)
- ML20116P107 + (03:06:24, 13 December 2024)
- ML20116P106 + (03:06:24, 13 December 2024)
- 05000483/LER-1985-020, :on 850208,Fire Door 14031 Opened W/O Providing Required Continuous Fire Watch W/Backup Fire Suppression. Caused by Personnel Error.Interpretation Re Cascading Tech Spec Statements Deleted + (03:06:26, 13 December 2024)
- ML20116P100 + (03:06:27, 13 December 2024)
- RBG-43141, Forwards Rev 8 to Updated SAR & River Bend Station Technical Requirements Manual (Trm) + (03:06:28, 13 December 2024)
- ML20116P096 + (03:06:29, 13 December 2024)
- ML20116P093 + (03:06:30, 13 December 2024)
- ML20116P087 + (03:06:30, 13 December 2024)
- RBG-20819, Final Deficiency Rept DR-275 Re Breakage of Four arc-welded Mounting Studs for Variable Inlet Vane Damper Assembly on Buffalo Forge Co Fan 1GTS*FN1A.Studs Replaced W/Threaded Bolts.Condition Not Reportable Per 10CFR50.55(e) + (03:06:31, 13 December 2024)
- ML20116P082 + (03:06:32, 13 December 2024)
- ML20116P075 + (03:06:32, 13 December 2024)
- 3F1192-09, Forwards Rept Describing Unsatisfactory Chemical Testing Incident,Investigative Findings & Corrective Actions.Lab Correctly Identified Substance as Morphine After Retesting. Clerical Errors Corrected by Lab & Individuals Counseled + (03:06:33, 13 December 2024)
- ML20116P068 + (03:06:36, 13 December 2024)
- RBG-37712, Responds to NRC Request for Addl Info in Insp Rept 50-458/92-31 on 920908-11 Re self-screening Contractor Incident.Caused by Project Manager Extended Illness. Unescorted Access Procedures Revised + (03:06:37, 13 December 2024)
- RBG-20816, Final Deficiency Rept DR-287 Re Fuse Blocks Located Inside Class 1E Uninterruptible Power Supplies Furnished by Elgar Corp.Initially Reported on 850403.Mods Made to Provide Proper block-to-bar Connection to Disposition N&D 10,692 + (03:06:38, 13 December 2024)
- ML20116P049 + (03:06:39, 13 December 2024)
- ML20116P044 + (03:06:40, 13 December 2024)
- ML20116P041 + (03:06:41, 13 December 2024)
- ML20116P038 + (03:06:42, 13 December 2024)
- ML20116P039 + (03:06:42, 13 December 2024)
- ML20116P035 + (03:06:43, 13 December 2024)
- 05000269/LER-1984-007, Advises of Reliability of Auxiliary Oil Pumps Per LER 84-007-00.No Insp of Unit 2 Pump During Outage Warranted. Util Deleting Commitment + (03:06:44, 13 December 2024)
- ML20116P031 + (03:06:44, 13 December 2024)
- 05000413/LER-1985-013, :on 850220,discovered Conduits Penetrating Fire Barriers W/O Ends Sealed for Fire Protection.Caused by Personnel Error & Procedure Deficiency.Training Provided to Personnel & Procedures Revised + (03:06:46, 13 December 2024)
- ML20116P018 + (03:06:47, 13 December 2024)
- 3F1192-12, Forwards Update Re Facility Recent Organizational & Zip Code Change + (03:06:48, 13 December 2024)
- ML20116P010 + (03:06:48, 13 December 2024)
- ML20116P009 + (03:06:49, 13 December 2024)
- ML20116P008 + (03:06:50, 13 December 2024)
- ML20116P005 + (03:06:50, 13 December 2024)
- HL-5229, Forwards FFD Performance Data for six-month Reporting Period Jan-June 1996 Per 10CFR26.71(d) + (03:06:51, 13 December 2024)
- ML20116P000 + (03:06:51, 13 December 2024)
- BVY-92-128, Forwards Required Ref Matls for Senior Reactor Operator Upgrade Exams in Feb 1993.W/o Encl + (03:06:52, 13 December 2024)
- 05000269/LER-1985-004-03, :on 850328,gaseous Waste Disposal Tank Released W/O Redundant Sample Analysis.Caused by Personnel Error. Personnel Counseled & Sample Taken + (03:06:54, 13 December 2024)
- ML20116N984 + (03:06:55, 13 December 2024)
- 05000250/LER-1985-009, :on 850401,evaluation Required for Inoperable Mechanical Shock Arrestor (Snubbers) Not Completed within Allowable Time Limits.Caused by Snubbers Inadequately Evaluated + (03:06:57, 13 December 2024)
- ML20116N978 + (03:06:58, 13 December 2024)
- 05000244/LER-1985-004, :on 850326,safety Injection Actuation Signal Generated Twice.First Event Caused by Deficiency in Maint Procedure M-48.14.Second Event Caused by Momentary Loss of Power + (03:06:59, 13 December 2024)
- ML20116N973 + (03:07:01, 13 December 2024)
- ML20116N966 + (03:07:02, 13 December 2024)
- ML20116N968 + (03:07:02, 13 December 2024)
- BVY-92-129, Responds to Initial SALP Rept 50-271/91-99 Covering 910317-920801,per 921029 Public Meeting.Improvements Made in Area of Security During Reporting Period Which Have Not Been Given Full Consideration in Rept + (03:07:03, 13 December 2024)
- 05000454/LER-1985-039, :on 850402,reactor Trip Occurred Due to Steam Generator 1B LO-2 Level.Caused by Loss of Feedwater Flow from Feedwater Pump 1B.Procedure Used for Power Ascension Revised + (03:07:05, 13 December 2024)
- ML20116N947 + (03:07:06, 13 December 2024)
- ML20116N958 + (03:07:06, 13 December 2024)
- ML20116N944 + (03:07:07, 13 December 2024)
- ML20116N941 + (03:07:09, 13 December 2024)
- ML20116N943 + (03:07:09, 13 December 2024)
- ML20116N937 + (03:07:10, 13 December 2024)
- ML20116N933 + (03:07:11, 13 December 2024)
- ML20116N931 + (03:07:11, 13 December 2024)