Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- 05000315/LER-1984-007, :on 840528,error Discovered in Detector Code Used for Analysis of First 47 Cycle 8 Flux Maps.Caused by Input Error.Code Corrected & line-by-line Review of Coding Changes Made.Requests Extension for Completion + (02:58:19, 13 December 2024)
- ML20117C722 + (02:58:20, 13 December 2024)
- RBG-20817, Final Deficiency Rept DR-175 Re Cracked Diesel Battery Cells in GE-supplied HPCS Replacement Batteries,Damaged Flame Arrestors & Improper Documentation for Replacement Battery Set.Initially Reported on 850403.Replacement Set Installed + (02:58:21, 13 December 2024)
- 05000374/LER-1985-015-03, :on 850401,control Room Conductivity Indication Inoperative for Greater than 31 Days.Caused by out-of-svc Sample Taps & Low Flow on Sys Where Sample Obtained.Recorder Repaired + (02:58:44, 13 December 2024)
- 05000454/LER-1985-043, :on 850410,fire Watches in Auxiliary Bldg Suspended for 3 H Due to Evacuation.Caused by ALARA Concerns Following Rupture of Boric Acid Evaporator Rupture Disk.Area Surveyed by Health Physics Personnel + (02:58:50, 13 December 2024)
- ML20117C682 + (02:58:51, 13 December 2024)
- 05000333/LER-1996-009-01, :on 960722,EDG B Failed to Complete Startup Sequence.Caused by Incorrect Installation of Agastat Relays. Calibr & Placed Devices 93-62-1EDGB01,93-62-1EDGB12 & 93-52A-1EDGB01 in Correct Locations + (02:58:53, 13 December 2024)
- ML20117C666 + (02:58:55, 13 December 2024)
- ML20117C662 + (02:58:56, 13 December 2024)
- ML20117C660 + (02:58:57, 13 December 2024)
- ML20117C653 + (02:58:59, 13 December 2024)
- ML20117C656 + (02:58:59, 13 December 2024)
- 3F0896-10, Forwards FPC Crngp Unit 3 Graded Approach Methodology for Instrument Uncertainty + (02:59:00, 13 December 2024)
- ML20117C643 + (02:59:00, 13 December 2024)
- ML20117C628 + (02:59:02, 13 December 2024)
- ML20117C637 + (02:59:02, 13 December 2024)
- ML20117C620 + (02:59:05, 13 December 2024)
- ML20117C618 + (02:59:06, 13 December 2024)
- ML20117C610 + (02:59:07, 13 December 2024)
- ML20117C614 + (02:59:07, 13 December 2024)
- ML20117C603 + (02:59:08, 13 December 2024)
- ML20117C589 + (02:59:09, 13 December 2024)
- ML20117C590 + (02:59:09, 13 December 2024)
- 05000352/LER-1985-041, :on 850401,reactor Encl HVAC Sys Isolated. Caused by Spurious Low Reactor Encl to Outside Air Differential Pressure Signal.Isolation Logic Reset & Current Loop Connections Cleaned & Inspected + (02:59:11, 13 December 2024)
- ML20117C578 + (02:59:12, 13 December 2024)
- LIC-96-0119, Submits Significant Change/Error in Loca/Eccs Models & Evaluation Used by Westinghouse to Model 1 + (02:59:13, 13 December 2024)
- 3F0896-17, Forwards Affidavits Requesting Fire Endurance & Thermo-Lag Mecatiss Fire Barrier Ampacity Derating Test Repts Be Withheld from Public Disclosure + (02:59:14, 13 December 2024)
- ML20117C571 + (02:59:14, 13 December 2024)
- ML20117C564 + (02:59:16, 13 December 2024)
- ML20117C552 + (02:59:17, 13 December 2024)
- ML20117C559 + (02:59:17, 13 December 2024)
- ML20117C551 + (02:59:19, 13 December 2024)
- 05000335/LER-1985-002, :on 850228,inboard Valves of Containment Isolation Valves Found Inoperable.Caused by Mechanical Connector Problem.Procedures Revised + (02:59:21, 13 December 2024)
- TXX-9643, Provides List of Less Safety Significant Components Not Exercised During Course of Normal Refueling Cycle Per 960315 Request + (02:59:22, 13 December 2024)
- ML20117C526 + (02:59:23, 13 December 2024)
- HL-5231, Responds to NRC Re Violations Noted in Insp Rept 50-321/96-07 & 50-366/96-07.C/A:personnel Met & Workout Group Organized to Perform Detailed Evaluation of Offsite Notification Process + (02:59:59, 13 December 2024)
- 05000483/LER-1985-019, :on 850330,inadvertent Actuation of Safety Injection Occurred During Planned Shutdown.Caused by 10 to 15 Psi Drop in Steam Pressure,Amplified by Rate Compensation.Operating Procedure Amended + (03:00:12, 13 December 2024)
- ML20117C430 + (03:00:14, 13 December 2024)
- ML20117C417 + (03:00:15, 13 December 2024)
- ML20117C415 + (03:00:16, 13 December 2024)
- ML20117C408 + (03:00:18, 13 December 2024)
- ML20117C407 + (03:00:18, 13 December 2024)
- ML20117C399 + (03:00:20, 13 December 2024)
- ML20117C396 + (03:00:20, 13 December 2024)
- ML20117C390 + (03:00:21, 13 December 2024)
- ML20117C392 + (03:00:21, 13 December 2024)
- ML20117C370 + (03:00:23, 13 December 2024)
- ML20117C379 + (03:00:23, 13 December 2024)
- ML20117C368 + (03:00:24, 13 December 2024)
- ML20117C364 + (03:00:25, 13 December 2024)
- ML20117C357 + (03:00:26, 13 December 2024)