Responds to Request for Schedule Re Actions & Completion Dates Associated W/Spent Fuel Pool
ML20117C610
Person / Time
Site: Peach Bottom, Limerick  
Issue date: 08/20/1996
From: Hunger G
PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
NUDOCS 9608270448
Download: ML20117C610 (2)


Text

.

Station Support Drpartment A

v

. PECO ENERGY-escosme,ovcomneev Nuclear Group Headquarters 965 Chesterbrook Boulevard Wayne, PA 19087-5691 August 20,1996 Docket Nos. 50-277 50-278

[

50-352 50-353 License Nos. DPR-44 l

DPR-56 NPF-39 i

NPF85 l

U. S. Nuclear Regulatory Commission Attn: Document Control Desk i-Washington, D.C. 20555 i

i

Subject:

Peach Bottom Atomic Power Station, Units 2 and 3 j~

. Limerick Generating Station, Units 1 and 2 i

ResponsetoRequestfor Actions

)

Associated Wdh the Spent Fuel Pool l

i-Dear Sir.

i This letter is in response to the-letter from J. W. Shea (U. S. Nuclear Regulatory Commission (USNRC)) to G. A. Hunger, Jr. (PECO Energy Company), dated July 15,1996.

The USNRC letter requested that PECO Energy provide a schedule for completing corrective actions to ensure that core offload sequences do not cause analyzed heat loads for the spent fuel to be exceeded Additionally, if corrective actions have been completed, the letter requested that a summary of the actions and completion dates be provided. This issue was the subject of a February 20,1996 USNRC visit, and the results of the visit were discussed in USNRC Integrated Inspection Report 50-352/96-01 and 50-353/96-01 for Limerick Generating Station (LGS), Units 1. and 2, and USNRC Integrated Inspection Report 50-277/96-01 and 50-278/96-01 for Peach Bottom Atomic Power Station (PBAPS),

Units 2 and 3. As discussed below, the following actions have been or will be completed:

Peach Bottom Atomic Power Station, Units 2 and 3 Procedural controls were implemented on May 6,1996 to ensure the projected spent fuel j

pool heat load is evaluated as a part of the refueling outage process. The spent fuel pools O

for PBAPS, Units 2 and 3 are separate; therefore, additional spent fuel heat load is not added during non-outage operations.

/FtV/

1 O" ~^~9608270448 960820 f* DR ADOCK 05000277 p

PDR

- ~. -.

I i

4 i

A'ugust 20,1996 l

m' Page 2 1

The PBAPS, Units 2 and 3 Updated Final Safety Analysis Report (UFSAR) will be revised to clarify limiting parameters and assumptions used in the thermal hydraulic analysis. This revision will be included as a part of Revision 15.

l Umorick Generating Station, Units 1 and 2 i

j Procedural controls will be implemented by December 31,1996 to ensure the protected l

spent fuel pool heat load will be evaluated as a part of the refueling outage process.

l Additionally, procedural controls will be implemented by December 31,1996 to evaluate j

and manage increases in the spent fuel pool heat load during non-outage operations. The i

December date will ensure adequate measures are in place prior to the next LGS refueling outage currently scheduled to begin in January,1997, as well as ensure procedures are in place prior to any nonadage heat load additions of which none are currently scheduled for i

1996.

i l-The LGS, Units 1 and 2 Updated Final Safety Analysis Report (UFSAR) has been revised to clarify limiting parameters and assumptions used in the thermal hydraulic analysis. This l

revision will be included as a part of Revision 6.

j i

i if you have any questions, please contact us.

Very truly yours,

.h fr G. A. Hunger, Jr.

Director-Licensing cc:

H. J. Miller, Administrator, Region I, USNRC W. L. Schmidt, USNRC Senior Resident inspector, PBAPS N. S. Perry, USNRC Senior Resident inspector, LGS

,