Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ET-NRC-92-3751, Forwards List of AP600 Sys for Which Westinghouse Will Be Providing Itaac,Per 920904 Commitment.Remaining 27 Sys ITAAC Will Be Sent on 921023 + (02:20:23, 13 December 2024)
- ET-NRC-92-3748, Provides Comments on Draft Policy Design Certification & Licensing Policy Issues Pertaining to Passive & Evolutionary Advanced LWR Designs + (02:20:24, 13 December 2024)
- ML20118A725 + (02:20:24, 13 December 2024)
- ML20118A720 + (02:20:25, 13 December 2024)
- 05000327/LER-1991-009, :on 910506,LCO 3.7.11.1 Entered When Fire Suppression Sys for Auxiliary Bldg Declared Inoperable. Caused by Inability of HPFP Sys to Pass Periodic Surveillance Test.Wr Initiated + (02:20:27, 13 December 2024)
- ML20118A718 + (02:20:28, 13 December 2024)
- ML20118A716 + (02:20:28, 13 December 2024)
- ML20118A714 + (02:20:29, 13 December 2024)
- ML20118A709 + (02:20:30, 13 December 2024)
- ML20118A713 + (02:20:30, 13 December 2024)
- ML20118A707 + (02:20:31, 13 December 2024)
- 05000254/LER-1991-022, :on 911104,CR Train B Air Filtration Unit Declared Inoperable Due to Failing to Attain 15 F Differential Temp.Caused by Inaccurate Flow Measuring Device.Flow Measuring Device Recalibr + (02:20:33, 13 December 2024)
- ML20118A700 + (02:20:34, 13 December 2024)
- ML20118A702 + (02:20:34, 13 December 2024)
- HL-2376, Forwards Response to NRC 920708 Meeting Request to Provide Addl Info Re Resolution of Human Engineering Discrepancies, Specifically,Differences in Annunicator Arrangements Between Units 1 & 2 & History of Dcrdr Project + (02:20:36, 13 December 2024)
- 05000423/LER-1992-016, :on 920704,both Trains of Auxiliary Bldg Filters Declared Inoperable When Access Door on Common Intake Plenum for Subj Bldg Found Open.Caused by Impoper Design.Door Locked Wired Shut + (02:20:38, 13 December 2024)
- ML20118A691 + (02:20:39, 13 December 2024)
- ML20118A689 + (02:20:40, 13 December 2024)
- ML20118A686 + (02:20:40, 13 December 2024)
- ML20118A684 + (02:20:41, 13 December 2024)
- ML20118A681 + (02:20:42, 13 December 2024)
- ML20118A682 + (02:20:42, 13 December 2024)
- ML20118A680 + (02:20:43, 13 December 2024)
- ML20118A678 + (02:20:44, 13 December 2024)
- ML20118A674 + (02:20:44, 13 December 2024)
- ML20118A673 + (02:20:45, 13 December 2024)
- ML20118A671 + (02:20:46, 13 December 2024)
- ML20118A660 + (02:20:46, 13 December 2024)
- 3F0992-05, Forwards Update to Util 900102 Response to GL 89-10 & Suppls 1 Through 4 Re safety-related MOV Testing & Surveillance. Util Intends to Complete Implementation of MOV Program During Refuel 9,currently Scheduled for Apr 1994 + (02:20:47, 13 December 2024)
- 05000456/LER-1992-010-06, :on 920814,dual Accounting for Samarium to Boron Value Contained in Curvebook Table 1-1 Re Min Required Boron Concentration for Shutdown Margin Occurred.Caused by Procedural Flaw.Procedure Revs Submitted + (02:20:49, 13 December 2024)
- ML20118A655 + (02:20:50, 13 December 2024)
- ML20118A649 + (02:20:51, 13 December 2024)
- ML20118A654 + (02:20:51, 13 December 2024)
- ML20118A648 + (02:20:52, 13 December 2024)
- ML20118A645 + (02:20:53, 13 December 2024)
- ML20118A646 + (02:20:53, 13 December 2024)
- 05000327/LER-1992-016, :on 920819,LCO 3.0.3 Entered for 18 Minutes When Both CREVS Trains Taken Out of Svc to Replace Inlet Damper in Each Train.Caused by Bypass Leakage Through Existing Dampers.Both Dampers Replaced + (02:20:55, 13 December 2024)
- ML20118A641 + (02:20:56, 13 December 2024)
- ELV-04004, Application for Amends to Licenses NPF-68 & NPF-81,revising TS Re Overtemp delta-T & Overpower delta-T Reactor Trip Functions to Provide Addl Operating Margin to Reactor Trip & Turbine Runback Setpoints to Account for Flow Phenomena + (02:20:57, 13 December 2024)
- 05000219/LER-1992-009, :on 920822,reactor Scrammed on Low Water Level Due to Failure of Proportional Amplifier.Failed Proportional Amplifier Replaced & Plant Restarted + (02:20:58, 13 December 2024)
- ML20118A636 + (02:20:59, 13 December 2024)
- ML20118A635 + (02:21:00, 13 December 2024)
- RBG-37494, Updates 891027 Initial Response to GL 88-20 Re IPE, Consisting of Revised Completion Dates for Milestones.Level 1 & 2 IPE Submittals,Per GL 88-20,Suppls 1,2 & 3,will Be Submitted by 930201 + (02:21:01, 13 December 2024)
- ML20118A631 + (02:21:01, 13 December 2024)
- ML20118A629 + (02:21:02, 13 December 2024)
- NRC-92-0101, Monthly Operating Rept for Aug 1992 for Fermi 2 + (02:21:03, 13 December 2024)
- ML20118A625 + (02:21:03, 13 December 2024)
- ML20118A623 + (02:21:07, 13 December 2024)
- ML20118A622 + (02:21:07, 13 December 2024)
- 05000325/LER-1992-019, :on 920821,safety Relief Valves Tested at Wyle Laboratories Exceeded TS Limit Due to Pilot disc-to-seat Bonding.Srv Pilots Will Be Recertified Prior to Startup of Units 1 & 2 + (02:21:09, 13 December 2024)
- ML20118A615 + (02:21:12, 13 December 2024)
- ML20118A613 + (02:21:13, 13 December 2024)