ccH 92-14399 PIIILADELPIIIA ELECTRIC COMPANY PEACH BOTTOh! ATOh11C POWER STATION l #j +
R.D,1, Box 208 Dcita, Penns)hania 17314 JYL f nvu sonw-nw nmig or ncuina- (717) 456 7014 D B. Miller, Jr.
Vce Prescent September 15, 1992 1
, Docket Nos. 50-277 50-27L 8
, U.S. Nuclear Regulatory Commission 4
Document Control Desk Washington, DC 20555
SUBJECT:
Peach Bottom Atamic Power Station Monthly Operating Report l Gentleme-Enclosed are twelve copies of the monthly operating report for Peach Bottom Units
! 2 and 3 for the month of August 1992 'orwarded pursuant to Teclinical Specification 6.9.1.d under the guidance of negulatory Guide 10.1. Revision 4.
i Sincerel p, p j f" f
' YQ llq,. , & (f DBM/AAF/TJN/dRM/MJB: cmc lp#'
g Enclosure i
cc: R.A. Burricelli, Public Service Electric & Gas T.M. Gerusky, Commonwealth of Pennsylvania
. J.J. Lyash, USNRC Senior Resident inspector R.I. McLean, State of Maryland _.
T.T. Martin, Administrator, Region I, USNRC
~
H.C. Schwemm, Atlantic Electric C.D. Schaefer, Delmarva Power
- -INPO Records Center CCV : . NRC 9E- 240169 920831 PDR 4 DOCK 05000277
[b N '
R pop //g
NRC hionthly Operations Summary ..
Peach llottom Atomic Power Station
. August 1992 4
- UNIT 2
[
, Unit 2 began the month at nominal 95% power with power levels restricted to 95% due to possible feedwater
'- flow inaccuracies. Sodium injection testing results were evaluated and power was increased to nomina 199% on -
l / sgust 14. An automatic scram occu'rred on August 17 as a result of problems encountered during the blocking
~
) of breakers in the south switchyard. _ Unit 2 returned to nomiaal 99% power on August 20. Fuel coastdown
[ began on August 22 and ti fifth stage feedwater heaters were removed from senice on August 28. _ Unit 2 ended the month at nominal 98% power with shutdown preparations for the refueli ,y. outage in progress.
t i
! UNir 3 i
Unit 3 began the month at nomina 195% power with power levels restricted to 95% due to possible feedwater -
flow inaccuracies,- Power was reduced on August 22 to correct some problems with some feedwater dump and drain vakes. Following this maintenance, power was increased to nominal 98% based on sodium injection test j results. Unit 3 continued to operate at this level until August 30, when power was reduced to 79% because of a minimum load generation alert from the load dispatcher. Unit 3 was returned to 98% power that same day and ren.ained at tha: level far the rest of the month.
1 I
i f
i -
a 4 -
l
- i. CC0892.NRC l
.1
- s , - - ,,
.~. . - - . . - . .. . .- . . . . .-. .- . -. - - , .-
m ,
Docket No. 50-277 .
, Attachment to Monthly Operating .
Report for August 1992 l UNIT 2 REFUEL.ING INFOISI ATION 1
- 1. Name of facility-Peach Bottom Unit 2
{
J
- j. 2. Scheduled date for next refueling shutdown:
~
Reload 9 scheduled for September 12,1992.
. 3. Scheduled date for restart following refueling:
F i
Restart following refueling forecast for November 30,1992.
4 1
1 e
4.~ Will refueling or resumption of operation therefore require a technical specification change or other j license amendment?
J i - No.
i j If answer is yes, what, in general, will these be?
L
- 5. Scheduled date(s) for submitting proposed licensing action and supporting information:
l
- N/A i ,
I
- 6. Important licensing considerations associated with refueling, e.g., new or different fuel design or supplier, l- unreviewed design or performance analysis methods, significant changes in fuel design, new opc:ating
- procedures
- 1 i.
t N/A- l l
i i i
4 .
l CC0892.N RC 1 1
l l
i 7 '
1
_4 & ae - .- w . ,* y N4 e ' sew d - 4 ge e'++ye' +4er:---e' T T NTt'* TftMYI
- - - . . . _ _ , . . . .. . . . - - - -._ - - . _ _ . . _ . - - =. . _ - . .
l DocLet No. 50-277 ,l I
Attachment to -
l Monthly Operating l
,- Report for August 1992 l Page. 2 l UNIT 2 REFUI: LING INFORM ATION (Continued'
- 7. The number of fuel assemblies (a) in the core nnd (b) in the spent fuel storage pool:
- (a) Core - 764 Fuct Assemblies Fuel Pool- 1896 Fuel Assemblics,58 Fuel P.ods f (b) f 5
l 8. The present licensed spent fuel pool storage capacity and the size of any increase in licensed storage capacity that has been requested or is planned,in number of fuel assemblies:
4 The spent fuel pool storage capacity has been reticensed for 3S19 fuel assemblies.
- 9. The projected date of the last refueling that can be discharged to the spert fuel pool assuming the
- present capacity
! September 2003 without full core offload capab:lity.
! September 1997 with full core offload capability.
a 4
4 W
CC0892.NRO i
i
e
+
Docket No. 50-278 ,
Attachment te Monthly Operating Report for August 1992
)
i
! UNIT 3 REFUl'I.ING INFOR51ATION j
- 1. Name of facility
3 l Peach Bottom Unit 3 a
l .
- 2. Scheduled date for next refueling shutdows l-i-
Reloc.J 9 scheduled for September 4,1993 i
i j 3. Scheduled date for restart following refueling i Restart following refueling scheduled for October 29,1993 i
4 Will refueling or resumption of operation thereafter require a ;cchnical specification change or other j license amendment?
No li answer is yes, what, in general, will these be?
l N/A 4
- f. Scheduled date(s) for sthmitting proposed licensing action and supporting information:
j- N/A i' d. Important licensing considerations associated with refueling, e.g., new or different fuel design or supplict, unreviewed design or performane malysis methods, significant changes in fuel design, new' operating procedures:
?.
N/A t
i CC0892.NRC a
-- , .~r ,-~ .n,., . - , - . w-.--- -e- - ~ < - - - . ~ - .,-- ----m-~.---. - , . - - , . - +4 e.~,4.--.
2
)
,' Docket No. 50-278 i Attachment to !
Monthly Operating j Report for August 1992
. Pape 2 l 4 -
UNIT 3 REFUEL,ING INFORNI ATION (Continued) )
l 4 i ,
- i
- 7. The number of fue! assemblics (a) in the core and (b) in the spent fuel storage pool:
(a) Core - 764 Fi Assemblics -
l (b) Fuel Pool 1945 Fuel Assemblies,6 Fuel Rods
- 8. The present licensed sp.t fed pool storage capacity and the size of any increase in licensed storage l capacity that has bacn requested or is plannc.I, in number of fuel assemblies:
- The spent fuel pool storage capacity has *.cen relicensed for 3819 tuel assemblies, d
' 9. The projected date of the last refueling that can be discharged to the spent fuel pool assuming the i
present capacity-l.
September 2004 without full core offload carability.
] September 1998 with full core ofuoad capability.
l l
i 1
I 1
1 C. 22.NRC
- . . . - - ...;-..,,..-, -.....;-.:.-.~,,-..--,-- -.,'
. .- - -.- . . . ~ . . . . ._ . ... . - _ , - . _ .- - --. -.- .-, .- - - .. .. - . -- - . -
4 i
, AVERACE. DAILY UNIT POWER LEVEL -_
i l
5 DOCKET NO. 50 - 277 ;
............................. l UNIT PLACH LOTTOM UNIT 2
- DATE SEPTEMBER 15, 1992 l COMPANY PHILADELPHIA ELECTRIC COMPANY
- M. J. BARON
'~ SUPERVISOR f REPC2TS CROUP PEACH Boff 0H ATOMIC POWER STATION 1 i TELEPHONE (717) 456-7014 EXI. 3321 l
t
. MONTH AUGUST 1992 1
1
!" OAT AVERACE DAILY PCWER LEVEL DAY AVERAGE DAILY POWER LEVEL 4
, (MWE-NFT) -(MWE NET) 6
[- 1 967 17 299 j 2 98n 18 0 t.
! 3 981 19 370 t
f '
3 4 9 75 20 992 I
i-( 5 984 21 .1014 6 988 22 1018 I 1 7 985 23 1005 i~ 8 986 24 973 i a s
i- 9 996 25 1018 i- 10 939 i$ 1010 i.
. ! 938 27- 1001
\
t 2
_12 980 28 994 a-l 15 984 29 1011 i
! -' 14 - 101v 30 10 * $ -
l 15 1023 31- .1007 16 1015 4
?'
s k
i 4
i n
l i-1 i
._,J+.--- N-- 5 ,, , , ,. , na r L .w An , a-w,.,sr-,.<,. ,--,--e.n-e-m.,va,:,-n,,n.w,+, -+w. ,e N b - w,, v vw w - N em ,-w,,,, a- w ,r y & , ~ .,m t, n, &.
1 AVERACE DAILY UNIT POWER LEVEL 4
- DOCKET ho. 50 - 278 ,
............................. a p
- UN T PEACH BOTTOM UkIT 3 i DATE SEPTEMBER 15, 1992 j I'
COMPANY PHILADELPHIA ELECTRIC COMPAM M. J. BARON SUPERVISOR I REPORTS CROUP PEACH BOTTOM ATOMIC POWER $TATION 1
.{
I TELEFHONE (717) 456 7014 EXT. 3321.
,t MONTH AUGUST 1992 DAY AVERACE DAlli POWER LEVEL DAY AVERAC
- DAILY POWER LEVEL (MWE NET) (MWE-hET) f 1 988 17 988-r 2 992 18 987
- 3 988 19 1004 4 1000 20 971 f
5 983 21 987 1 6 991 22 950 4
- . 7 989 23 1015 a
8 985 24 984 f
9 1000 25 1J40 l
, . _ 10 990 26 1036 i
i 11 987 27 1023 l
12 996 28 1016
- 13- 983 29 1019 14 984 '30 992 l
15 988 31 1020 16 984 i
t e
i 1
I l
4
{.
i f
+
~ . , -e,- 3 g -
,-e ,-,-r v w ,, w,,-, . A w ,., -e e, ,,,,,.,,.,;---,-ww, , S. , w 6 . ,.,wn.,wr , ,,m,, em,,,,--, e a n e+,e.m.e e e- < r-
. ~ _ . . . .~..- . . . . . . . . . - - . - -.- , . - . .
OPEkATING DATA REPORT DOCKET NO. 50
- 277 DATE SEPTEMBER 15, 1992 CDMPLEf tD BY PHIL'DELPHI A r' CCTRIC
. COMPANY
-t M. J. BARON SUPERVISOR L REPORTS GROUP -
PEACH BOTT0H ATOMIC POWER STATION TELEPHONE (717) 456-7014 EXT 3321 OPERATING STATUS
- 1. UNIT NAME: PEACH BOTTOM UNIT 2 TOTES: .
- 2. REPORTING PERIOD: AUGUST, 1992
- 3. LICENSED THE (MAL POWER (MVT): 3293
- 4. NAMEPLATE RATING (GROSS MWE): 1152
- 5. DES *CN ELECTRICAL RATING (NET MWE): 1065
- 6. NAXIMUM DEPENDABLE CAPACITY (GROSS MWE): 1098
- 7. MAXIMUM DEPENDABLE CA?ACITY (NET MWE): 1055
- 8. 1F CHANGES OCCUR IN CAPACITY RATINGS (ITEMS NUMBER 3 THROUGH 7) SINCE LAST REPORT, GIVE REASONS:
- 9. POWER LEVEL TO WHICH RESTRaCTED, IF ANY (NET MWE):
- 10. REASONS FOR RESTRICTIONS, IF ANY:
THIS MONTH YR TO DATE. CUMULATIVE l 11. HOURS IN REPORTING PERIOD 744 5,855 159,191
- 12. NUMBER OF HOURS REACTOR WAS CRITICAL 709.4 5,292.1. 97,546.1 ,
5 ............ ............ ...........- _
- 13. REACTOR RESERVE SHUTOOWN HOU't s 0.0 0.0 0.0
- 14. HOURS GENERATCR ON-LINC- 697.4 5,052.7' 93,890.2
- 15. JNIY RESERVE SHUTOOWN HOURS 0.0 0.0 0.0 j ............ ..........., ...........
- 16. GROSS THERMAL ENERGY GENERATE 6 (MWH) - 2,173,560 15'977,424
, 278,517,153 I 712,200-
- 17. GROSS ELEttalCAL ENERGY GENERATED (MWH). 5,303,900 91,592,400
>l . ............ .,... ...... ............
1 18. NET ELECTRICAL ENERGY GENERATED (MWH; 685,327 5,124,064 87,741,297 i: ............ ............. ,,..........
4: PAGE 1 0F 2 :
f l
d
_1 l
l f
n~,,, ,, - . - , . , ~. ..; v. n. - . , , , . . . ,..~...,,n.a.,;-.,-~i,.-..-,',.w c~... . _ . - .- -
, OPERAT!NG DATA REPORT (COWi!NUED) . DCCKEi NO. 50 277 P
DATE SEPTEMBER 15, 1992 .
THIS MONTH YR To DATE CUMULATIVE
- 19. UNIT SERVICE FACTOR 93.7 86.3 59.0 3
- 20. UNIT A%AILABILITY FACTOR 93.7 86.3 59.0
- 21. UNIT CAPACITY FACTOR FUSING MDC NET) 87.3 83.0 52.2
- 22. LNIT CAPAtlTY 7 ACTOR (USING DER NET) 86.5 82.2 - 51.8 g
- 23. UNIT FORCED OUTAGE R M 6.3 13.7 -14.6
- 24. SHUTDOWNS SCHEDUiED OVER NEXT 6 MONTHS (TYPE, DATE, AND DURATION OF EACO2 Refueling, 9/12/92 start, 78 days 2$. IF SHUTDOJ AT END OF REPORT PERDO, ESTIMATE 9 DATE OF STARTUP N/A
- 26. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION): -FORECAST ACHIEVED INITIAL CRITICAt.1TY 09/16/73 INITIAL ELECTRICIT1 02/18/74 CCMMERCIAL OPERATION 07/05/74 y
PAGE 2 0F 2 a
t.
b b -
- - .. _- --_m__ _._m. ._.______-____._____m.__._______-.m____..m__ _ _ _ _ _ _ _ _ _ _ _ . _ _ _ _ _ . _ _ _ . _ _ _ _ _ _ _ . _ _ _. _-
. -. - . . . . -._- . . - . ~ . . ~ . . .. ,. . . . - . - . _ . . ~ . , . . _ . ~- -
i OPERATING DATA REPORT
, r r ,
i T DOCKET No. 50 278 4, .
DATE SEPTEMBER 15, 1992 1 COMPLETED BT PHIL!.0ELPHIA ELECTRIC COMPANY
{
! M. J. BARON j SUPERVISOR REPORTS GROUP i PEACH BOTTOM ATOMIC POWER STATION
] TELEPHONE (717) 456-7014 EXT 3121 ,
} OPERATING STATUS t_ _
- 1. UNIT NANE: PEACH BOTTOM UNIT 3 NOTES: .
j
- 2. REPORTING PER100: AUGUST, 1992 j ~ 3. IICENSED THERMAL POWER (M'JT): 3293
- 4. NAMEPLATE RATING (GROSS MWE): 1152- .
- 5. JESIGN E. EC 'RICAL RAT!"* (NET MWE); 1065 l 6. MAXIMUM DiPENDABLE CAPACITY.(GROSS MWE): 1098 4
- 7. MAXIMUM DEPEN 3ABLE CAPACITY (NET MWE): 1035 l 8. IT CHANGES OCCUR IN CAPACITY RATINGS (ITEMS NUMBER 3 THROUGH 7) SINCE LAST REPORT, GIVE REASONS:
4 1 9. POWER LEVEL TO WHICH RESTRICTED, IF ANY (NET MWE):
- 10. REASONS FOR RESTRICTIONS, IF ANY:
t THis MON'H TR To-DATE CUMULATIVE
- 11. HOURS IN R" PORTING PER100 744 5,855 155,087-
! 12. 4 UMBER OF HOURS .leACTOR WAS CRITICAL 744.0 5,367.3 95,729.4 '
I
!. 13. REACTOR RESERVE SHUTCOWN HOURS 0.0- 0.0 0.0' I
- 14. NOURS GENERATOR ON-LikE 744.0 5,084.2' 92,389.2 '
p ............ ............ ............
l 15. UNIT RESERVE SHUTOOWN NOURS 0.0 ' 0.0 0.0 l- 16. GROSS THERMAL ENERGY GENERATED (MWH)' 2,332,296 15,348,552
.27*,442,482
( 17. GROSS ELECTRICAL ENERGY GENERATED-(MWH) 768,700. 5,108,300. 89,110,832 I
5
- 18. NET ELECTRICAL ENERGY GENERATED (MWH) 740,595 4,934.097 85,417,114
, PAGE 1 0F 2 4 .
I i.
i
, \
! l t' i
- .. . _ . - . ~..---. _-.4. ,_ -- ....,........-m... ._._..m-.-_w.,--.._...._._.......,_..._._..
- . . - . , -. .- - -. .-. . -. -- - . . ~ - - . ~ . . . - . . - - . . - . . . . . . . . . . - . . .-. , . . .-.. -- .
. .4 i OPERATING DATA REPORT (CONTINUED) DOCKFT NO. 50 - 278 i
i" DATE SEPTEMBER 10, 1992 i ............... .............
i j THl$ MONTH TR 70 DATE ~ CUHt".AT:VE a
. 19. UNIT SERVICE FACTOR 100.0 86.8 59.6 z ............ ........_... ............
- 20. UNIT AVAILABILITY FACTOR 100.0 86.8 59.6 1 ............ ............ ............
- 11. UNIT CAPACITY FACTOR (USING MDC NET) 96.2 61.4 53.?
j 22. UNIT CAPACITY FACTOR (USING DER NET)- 93.5 79.1 51.7
- 23. UNIT FORCED CulACE RATE 0.0 7.7 12.4
- 24. SHUTDOWNS SCHEDULED OVER NEXT 6 MONTE (TYPE, DATE, AND DURATid 0F EACH)
- ,
s 4.
1 25. IF SHUTDOWN AT END OF REPORT PERIDO, ECTIMATED DATE OF $TARTUP: N/A l
4
- 26. UNITS IN TEST STATUS (PRIOR 10 COMMERCIAL OPERATION) FORECAST ACHIEVED i-a i INITIAL CRITICALITY -
-08/07/74
! INITIAL ELECTRICITY 09/01/74 j ......... ........
COMMERCIAL OPERATION 12/23/74 b.
1
(
t l
e i
6 1-
-PAGE 2 OF 2 4-a 1'
i s
1 4..
e.
4 2
=
I
. _ . . . . . . . . . . . . , , _ . , _ . . _ . . . . _ _ . . . . _ _ . . . _ _ . . . . _ . ~ . . , _ _ . .
.-. - - - - -. . . - . . . . - . - . . . - . . . ~ . _ . . . . - - ~ _
o a t
l.
i 5
UNIT SHUfDOWNS AND PCWEP REDUCT10NS DOCKET No. 50 277 UNIT NAME PEACH BOTTOM UNIT 2
{ DATE SEPTEMBER ?L, 1992 REPORT MCNTH AUGUST, 1992 COMPLETED By PHILADELPHIA ELECTR!C COMPANY j ............... .............................
M. J. BARON ,
l SUPERVISOR -
REPORTS GROUP j
PEACH BOTTOM AfDMIC POWER STATICM ,
4 TELEPHONE (717) 456-7014 EXT. 3321
)
' METHOD OF l LICENSEE SYSlEM COMPUNENT CAUSE AND CORRECTIVE j TYPE DURATION REASON SHUTilNQ 00V% EVENT CODE CODE ACTION To j
4 NO. DATE (1) (HOURS)
(2) , REACIOR ;3) REPORT # l (4) (5) PREVENT EECURRENCE
! l ?
I 1
I INVESTIGATION 2-92-322 IN PROGRESS
- 16 920823 S 0.0 B 4 hA CM HTEXCH REMcVE FIFTH STAGE FW HEATER FRON i SERV!CE - REACTOR NOT SHU1 DOWN i
t 46.6 i
4 i
6 (1) (2) (3) (4) i d
F - FORCED REASON ME1H00 - EXHISIT C INSTRUCT!CNS
'! S - SCHEDULE 0 A
- EQUIPMFNT FAI,URE (ExRLAIN) 1a MANUAL FOR PREPARAi!CN OF CATA B - MAINTENANCE OR TEST 2 - MANUAL SCRAM. ENTRf SHEETS FOR LICENSEE i C REFUELING 3 - AUTOMATIC SCRAM. EVENT REPORT (LER) 0 - REGULATORY RESTRICilCN 4 - OTHER (EXPLAIN) FILE ~(NUREG-0161) 1 E CPERA.OR TRAINik0 + LIEENSE EXAMINATION .
F ACMINISTRATIVE (5) -
G OPERATIONAL ERROR (EXPLAIN)-
H . OTHER(EXPLAl:1) EXHtBIT I - SAMT SOURCE t
-i il I
, - , - . - - . . , , _ , . . - - . , , - - . - .. - _ . . . . . . - - ~ . . . _ . - . - . , - . _ - _ . - . _ . . . ~ .
_ _ . - _ . , . ~ _ - -
y E'- .
+
4 4
a f
1 k
UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO. 50 278-
' UNIT 6" r F.;H BOTTOM UMIT 3 u' $EJTE- 1 15, 1992-REPORT MONTH AUGUST, 1992 COMPLETED BY PHILADELPHIA ELECTRIC COMPANY M. J. BARON SUPERVISOR g REPORTS GROUP
- PEACH BOTTOM ATOMIC POWER STATION TELLPHONE (717) 456-7014 EXT. 3321 s
i METHOD OF LICENSEE SYSTEM CONDONENT' j CAUSE AND CORR"CTIVE 1
. TYPE DURAfl0N REASON SHUTTING DOWN EVENT CODE CODE l . ACTION TO NO.j DATE (1) ; (HOURS) (2) REACTOR (3) REPORT # (4) (5) g PREVENT RECURRENCE j
20 920822 Sl 0.0 A l 4 NA t.:' VALVEX MAINTE9" 'E ON FEEDWATER HEATER DUMP 3 ANO DRAIN VALVES TVACTOR NOT SHUTDOWN 21 920830 F 0.0 A 4 NA XX XXXXXX LOAD REDUCTION PER LOAD DISPATCHER f REACTOR NOT SHUT DOWN 1
REACTOR VAS NOT SHUTDOWN 1
r 4 .....
i j.
(1) (2) (3) (4)
F FORCED REASON METHOD EXHIBIT C --INSTRUCTIONS S:- SCHEDULED A EQUIPMENT FAILURE (EXPLAIN) T
- MANUAL FOR PREPARATION OF DATA 8 MAINTENANCE OR TEST 2 - MANUAL SCRAM.. ENTRY SHEETS FOR LICENSEE C REFUELING 3 AUTOMATIC SCRAM. EVENT REPOR.T (LER)
D - REGULATOP' RESTRICTION 4 - OTHEP (EXPLAIN) FILE (NUREJ-0161)
- E - OPERATOR TRAINING + LICENSE EXAMINATION i F
- ADMINISTRATIVE (5)
C OPERATIONAL ERROR (EXPLAIN).
H OTHER(EXPLAIN) JXHIBli ! - SAME SOURCE
,e , , _ w . - . ., . , -- , ~ - - - r 4- , ~ ~ -