WJF1 0100 A4.05 QA Septemtier 22, 1992 U..S. Nuclear llegulatory Commission A'1".I'N : Document Control Desk Washington, D.C. 20555 Subject :
Waterford 3 SES Docket No. 50-382 Ideense No. NPF-38 NRC Inspection Repori 92-01 Schedule Information Gentlemen:
As reflected in NRC Inspection Report 92-10, Waterford 3 and NRC representatives agreed that additional corrective action was necessary to fully address violation D201-01.
To that end, Waterford 3 will revise Administrative Procedala UNT-005-001,
" Temporary Alteration Control," such that the procedure includes appropriate guidance with regard to the administrative aspects of temporary alteration control.
The revision to UNT-005-001 will be i omplete Ly October 28, 1992.
Should you re<1uire any additional information or assistance, plenso contact T.W. Gates at (501) 739-GG97.