' NUCLEAR OPERATING CORPORATION Bart O Withers
$EekNi$e omcer September 18, 1992 WM 92-0151 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Mail Station P1-137 Washington, D. C.
20555 Reference 1) Letter ET 91-0235, dated December 24, 1991, from F. T. Rhodes, WCNOC to NRC 2) letter dated July 10, 1992 from W. D. Reckley, NRC to B. D. Withers WCNOC
Subject:
Docket No. 50-482: Reassessment of Generic Letter 88-20 Supplement 4, "Individt.al Plant Examinations for External Events" Submittal Schedule Gentlemen This letter provides the results of Wolf Creek Nuclear Operating Corporation's (WCNOC) reassessment of the schedule for submitting the Individ'.al Plant Examination for External Events (IPEEE) as requested by Reference 2.
Based on this reassessment the re s ul t.s of WCNOC's IPEEE will be submitted by June 30, 1995.
Reference 1 provided a description and schedule of the program for completing the Wolf Creek Generating Station (WCGS) IPEEE as required by Generic Letter 88-20 Supplement 4.
As identified in Reference 1,
WCNOC personnel are develeping the Individual Plant Examination (IPE), and these same people will also perform the analyses for the IPEEE.
The original schedule was developed to allow WCNOC to maximize the amount of IPEEE work performed by WCNOC personnel.
WCNOC believes that the schedule contained in Reference 1 was consistent with the level of safety significance attributed to this efforc and the resources available to complete the IPEEE.
WCNOC understands that a September 1995 IPEEE submittal date could impact the NRC's schedule for closure of severe accident issues, therefore, it is WCNOC's intent to submit the results of the WCGS IPEEE by June 30, 1995.
Should circumstances arise that warrant extending this schedule beyond June 3995, it would be WCNOC's intent to meet with the NRC staff regarding a schedule extension.
92-9209240251 920918 PDR ADOCK 0500 2
PO Box 411 Burhngton KS 66839 - Phone (316) 364 8831
- - nnew,mcm ip
q -
WM 92-0151 Page 2 of 2 If you have any questions concerning this.catter, please contact me or Mr. Kevin J.
Moles of my staff.
Very truly yours, 9
Bart D.
Withers President and Chief Executive Officer 1
BDW/jra cc:
A.
T. Howell (NRC)
J. L. Milhoan (NRC)
G.
A. Pick (NRC)
W.
D.
Reckley (NRC)
L i
_J
. -