Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20126E666 + (00:18:05, 13 December 2024)
- ML20126E663 + (00:18:08, 13 December 2024)
- ML20126E659 + (00:18:10, 13 December 2024)
- ML20126E658 + (00:18:12, 13 December 2024)
- ML20126E657 + (00:18:15, 13 December 2024)
- ML20126E654 + (00:19:33, 13 December 2024)
- 2CAN129203, Application for Amend to License NPF-6,changing TS to Allow one-time Exemption from SG C-3 Tube Insp Actions Specified in TS Table 4.4-2 to Allow Continued Plant Operation Until 930430 SG Tube Insp Outage + (00:19:37, 13 December 2024)
- ML20126E650 + (00:19:42, 13 December 2024)
- 05000366/LER-1992-025-01, :on 921119,discovered That Analog Transmitter Trip Sys Trip Units for HPCI & RCIC Not Functionally Tested, Per Ts.On 921120,discovered That PCIS Valves Also Affected. Caused by Personnel Error.Personnel Counseled + (00:19:49, 13 December 2024)
- ML20126E645 + (00:19:53, 13 December 2024)
- ML20126E642 + (00:19:55, 13 December 2024)
- ML20126E640 + (00:19:57, 13 December 2024)
- U-602081, Suppls 920706 Response to NRC SE for Station Blackout .Topics Include,Battery Design Margin,Control Room Ventilation & EDG reliability.Heat-up Analysis for Main Control Room Will Be Revised Using Conservative Temp + (00:20:00, 13 December 2024)
- ML20126E634 + (00:20:04, 13 December 2024)
- RBG-37937, Clarifies Statement Contained in Insp Rept 50-458/92-10 Dtd 920423.Engineering Review & Approval,During Mod Request Process,Meets Requirements of Reg Guide 1.64 + (00:20:05, 13 December 2024)
- ML20126E630 + (00:20:07, 13 December 2024)
- ML20126E628 + (00:20:09, 13 December 2024)
- BSEP-92-0053, Responds to NRC Re Violations Noted in Insp Repts 50-324/92-32 & 50-325/92-32.Corrective Actions:Forklift Supervisors Counseled on RWP Requirements for Transporting Radioactive Matl & HP Personnel Will Be Trained + (00:20:11, 13 December 2024)
- ML20126E624 + (00:20:15, 13 December 2024)
- ML20126E620 + (00:20:17, 13 December 2024)
- ML20126E619 + (00:20:19, 13 December 2024)
- ML20126E617 + (00:20:22, 13 December 2024)
- ML20126E616 + (00:20:23, 13 December 2024)
- ML20126E614 + (00:20:26, 13 December 2024)
- ML20126E613 + (00:20:28, 13 December 2024)
- ML20126E611 + (00:20:32, 13 December 2024)
- ML20126E609 + (00:20:35, 13 December 2024)
- ML20126E608 + (00:20:36, 13 December 2024)
- ML20126E603 + (00:20:40, 13 December 2024)
- ML20126E602 + (00:20:42, 13 December 2024)
- ML20126E601 + (00:20:45, 13 December 2024)
- ML20126E600 + (00:20:47, 13 December 2024)
- ML20126E597 + (00:21:53, 13 December 2024)
- ML20126E596 + (00:21:57, 13 December 2024)
- ML20126E593 + (00:22:01, 13 December 2024)
- ML20126E592 + (00:22:04, 13 December 2024)
- ML20126E589 + (00:22:06, 13 December 2024)
- 05000458/LER-1992-004-01, Forwards LER 92-004-01.Rev Submitted to Include Missed Surveillances on Valve 1SWP*AOVF051A Overlooked in Original LER Submittal + (00:23:54, 13 December 2024)
- ML20126E584 + (00:23:58, 13 December 2024)
- ML20126E583 + (00:24:02, 13 December 2024)
- ML20126E582 + (00:24:04, 13 December 2024)
- IR 05000155/1974009 + (00:24:07, 13 December 2024)
- ML20126E578 + (00:24:10, 13 December 2024)
- ML20126E575 + (00:24:13, 13 December 2024)
- ML20126E574 + (00:24:15, 13 December 2024)
- ML20126E573 + (00:24:18, 13 December 2024)
- ML20126E572 + (00:24:21, 13 December 2024)
- ML20126E569 + (00:24:23, 13 December 2024)
- ML20126E568 + (00:24:25, 13 December 2024)
- ML20126E566 + (00:24:26, 13 December 2024)
- ML20126E564 + (00:24:28, 13 December 2024)