go - sn.
vais u wiet + tun DOC NO. N 74 W G E N E R A L h, E LE CTRI C REVISION CONTROL SHEET nev 2
$ PENT FUEL SE RVICES OPERATION j
p]
TEST REsOLT5 FoR SERtAL blo 80%- o' POST-ACCIDENT SAMPLE SYSTEM MANUFACTURING ACCEPTANCE TEST THIS SH6ET PROVIDES A
SUMMARY
OF REVISIONS MADE 70 INDIVIOUAL SHEETS OF THIS D AND 15 REVISED EACH TIME A CHANGE IS MADE TO ANY SHEET REASON FOR REVISION O A ISSUE REV NO.
SHEETS AFFECTED 0
All ERM-80641
%/j> ECN NH 10421 Rev 1 All Rev 2 sheets 8,10, 17 & 20
/pfp [ ECN-NH-10425 8506170162 850530 PDR ADOCK 05000219 P
PDR 2
i paEP Anto av CATE pmOJECT G.E. Taylor 12/3/80 C5474 issuno,y issue OATE Ci.a ssa iCA r.O N M,W.JP 23fC 80 8ORW SPO4212J781
g g g,C5474-TIl
. GENERAL hELECTRIC DOCUMENT SHEET aev -- 2
$ PENT FUEL QPERATION SHEET 2
op 21 POST-ACCIDENT SAMPLE SYSTEM MANUFACTURING 6 ER.
8C)3 6 -o l "RE ACCEPTANCE TEST 1.0 PURPOSE 1.1 This testing procedure provides the detail steps for minimum acceptance testing of the LOCA Sampling System at the manufacturer's fabrication plant. This testing is to be witnessed and/or run by a GE Co. assigned representative.
2.0 REFERENCES
2.1 Drawings o C5474-E-10 2 Generic BWR LOCA Liquid Sampler Mechanical Flow Diagram o C5474-E-101 Generic BWR LOCA Gas Sampler Mechanical Flow Diagram o C5474-SP2 LOCA Sampling System Fabrication Specification 3
3.0 TEST EQUIPMENT NEEDED 3
o Freon detector o Gas vial positioner and syringe o Large Vdlume Cask and Cart positioner
- o Small Volume Cask and small volume cask positioner
- o Miscellaneous items including a spare syringe, septum bottles, needles, and a cup.
4.0 NOTES AND PRECAUTIONS 4.1 Prior to performing the tests called for in this test instruction, assure that the test equipment called for in Section 3.0 is available and that the pre-requisites of Section 5.0 have been completed.
4.2 Personnel scheduled to perform the test should familiarize themselves with the reference documents and the test procedures called for herein prior to performing tests.
- Except for the small volume cask positioner, these items are prototype units.
' FORM 478 30 (11177) e
GEN ER AL h ELECTRIC DOC NO.
2 DOCUMENT SHEET nev SPENT FUEL OPERATION 21 SHEET CF POST-ACCIDENT SAMPLE SYSTEM MANUFACTURING SER. 8036-07 TIRE ACCEPTANCE TEST 5.0 PREREQUISITES FOR TESTING 5.1 Manufacturing is complete for the specific items for a specific customer.
o Control Cabinet & Cables & Graphic Panel o Sample Str. tion including gas vial positioner and syringe; less shielding o Piping station o Small Volume Cast Positioner 5.2 Manufacturer's testing is complete for the specific items including:
o 1200 psi hydrostatic test on liquid system. Remove 0-50 pressure transducer (PI-662) fran the line in the liquid tray for this test.
o 40 psi pneumatic test on gas system o Control Panel, Graphic Panel and cables tested on sample station simulators, o Trap T-717 in the gas tray has been filled with water to the point where the level switch comes on as determined by a continuity check. Drain the water and verify the switch goes off. Record the approximate volume required to actuate the switch.
400 d 5.3 Service systems are provided and connected as follows:
o All electrical cables between the control cabinet and sample station and FET 664 on the piping station o Two sources of 115 Volt power connected to the control cabinet o 100 PSI Nitrogen connected to the control cabinet o Temporary tubing from the control cabinet to the sample station and from the sample station to the piping station.
o Freon connected to the sample station at the demin flush water pipe with the valve number CV-628 Freon connected to the sample station at the Tracer gas inlet pipe o
o Demin water connected to the piping station at inlets to valvesCV-624 and CV-025 o A drain Une from the piping station to a sink o A drain line from the collector discharge to a sink o Gas inlet & discharge lines open to atmosphere o Hot water connected to E-604 and E-605 5.4 Check calibration of conductivity meter, CI-663 5.4.1 Turn all panel switches UP and 0FF.
Turn power source selector switch to "B".
Note source "B" light is on e x. /
FORM 574 35111/771 s
GEN ER AL h ELECTRIC DOCUMENT SHEET ac'3
$ PENT FUEL OPERATION 4
2I SHEET OF POST-ACCIDENTSAMPLESYSTEMMANUFACTURINGACCEPTANCETESTbEIL 3b~
5.4.2 Reference pg. 8 of Beckman Instruction Manual Turn range selector switch to 0.1 multiplier position using lower scale.
Loosen the two front panel thumb screws and slide out the instrument chassis.
Slide switch S203 (see Figure 6 of B'eckman Instruction Manual) to the "zero" i
position. Adjust the mechanical zero on the meter. Move S203 to full scale position and adjust R277 so that the pointer is at the full scale mark.
Return S203 to the " Normal" nnsition.
Set the Scale on tne 0.1 range.
5.5 Check Rad Monitor meter operation.
5.5.1 Reference pg. 26, item 3C of Eberline Instruction Manual.
Remove two screws holding the long narrow vertical cover plate adjacent to the meter.
Depress the alann set switch (S-6) upward.
The high level alann set point will be displayed on the meter.
Adjust the pot directly above the switch for 10% of scale.
Depress the alann set switch downward. The alert set point will be displayed. Adjust the pot directly below the switch to 1% of scale.
Replace cover plate.
5.5.2 Turn, Power Source Switch to 0FF 5.6 Pressure, temperature and flow instrument calibration by their manufacturer are accepted as the instruments are delivered.
6.0 EQUIPMENT LIST 6.1 The equipment to be tested by this test instruction are those items listed in paragraph 5.1.
Other pieces of equipment required for the test listed in Section 3.0 are for support purposes only.
7.0 INSTRUMENTATION 7.1 Instrumentation items are specified in the data sheets of the fabrication specification C5474-SP2 and are indicated on the MFD drawings for the gas and liquid sampling systems C5474-E-101 and C5474-E-102 respectively.
7.2 The functional operation of the instruments will be verified in conjunction with the testing of the entire sampling system as called for in Section 8.0
' PORM SF130 (11/17)
G EN ER AL h ELECTRIC aev-2 DOCUMENT SHEET SPENT FUEL OPERATION SHEET 5
OF 21 POST-ACCIDENT SAMPLE SYSTEM MANUFACTURING ACCEPTANCE TES 7.3 The only instrument needed for testing is the Freon detector, see Section 3.0.
This instrument has a built-in source for testing its operation and settin'g its threshold for sensitivity. An &ccurate calibration is not required.
8.0 TESTING PROCEDURE AND DATA SHEETS 8.1 Turn on N and other utilities, set N regulator for 100 psi.
2 2
8.1.1 Adjust PCV-627 for 3 psi. Verify zero flow. Adjust pointer on valve FCV-627 to show valve closed.
Increase pressure to 15 psi at PCV-627 and observe valve stem on FCV-627 rise and settle with pointer at 100% open.
Reduce pressure and note that valve moves toward closed.
8.1.2 Adjust PRV-714 for 2 psi, may have to bleed line downstream of PRV-714.
8.1.3 Turn on demineralized sample water to inlet for CV-624 and CV-625 8.1.4 Turn all switches to UP and 0FF position.
Turn on Power, select source "A" Note Source "A" light is lit.
C)E Note conductivity and Rad Monitors are energized W-Note No other panel light is lit.
c, y Read TI.560
~Io F Read TI-724 19*F Read RI-507, 665 and 704hwnscats b Nscatu 1),wusc n tc*
8.2 Drain System (Switch HC-715-1) 8.2.1 Turn to Position 2, BLOW COLLECTOR Listen for and feel N coming out of collector drain line 2
Observe the valves CV-714 and CV-716 are energized and open.
Observe that no relays are energized and that switch mode light is lit.
All o.k.?
o ft Record anything unusual?
do
- Rad Monitor Green Nonnal lights will be on at first, but as readings drift to zero the green lights will no out. They will restart automat-ically if radiation appears.
. a s,.m,,m, e
oce no' c w7a-Tx, N
GEN ER AL $ ELECTRIC 2
DOCUMENT SHEET
' uv SPENT FUEL OPERATION 6
2I HEN
_ OF TLE POST-ACCIDENT SAMPLE SYSTEM MANUFACTURING ACCEPTANCE TEST S es Turn all other switches - they should not work. Leave all switches in the UP and 0FF position.
8.2.2 Turn to Position 3, DRAIN COOLER-TRAP.
Observe P-701 starts, CV-722 opens, CV-717 opens, CV-713 opens, CV-701 opens.
All o.k.?
O V_
8.2.3 Prepare to discharge water from collector V-715.
Turn to Position 4 BLOW COLLECTOR Observe water discharged from sump discharge line in sink.
Yes/No?
VE5 Observe things same as at 8.2.1, Position 2.
All o.k.?
ok i
8.2.4 Turn to Position 5, EVACUATE COLLECTOR Observe P-701 starts All o.k.?
OE Observe that no water is discharged from P-701 at secondary containment atmos.
o.k.? olt Pour a measured amount of water into the sump (approximately 200 ml) 8.2.5 Turn to Position 6, SUMP TO COLLECTOR Observe P-701 stops and CV-715 only valve open. o.k.?
olc_
8.2.6 Prepare to collect water discharged from the collector at sump discharge line (at penetration)
Turn to Position 7, BLOW COLLECTOR Observe water discharged.
Yes/No Yes Correct Amount Yes/No br5 _
Observe things same as 8.2.1, Position 2.
All o.k.?
l l
8.2.7 If water was not recovered, repeat 8.2.5. and 8.7.6
(
8.2.8 Turn to Position 8, OFF 1
Observe Mode light for switch is out
'F Om u sps.3s tl y133
'5*~*
CN-GEkEHAL$ ELECTRIC DOCUMENT SHEET nEv 7
7 OF 71 SPENT FUEL OPERATION SHEET POST-ACCIDENT SAMPLE SYSTEM MANUFACTURIN TITLE Relay CR7 is energized. All o.k.?
O l<
Turn to Position UP & OFF Set up for liquid samples and take small volume sample 8.3 B.3.1 Turn liquid or gas selector, HC-700, to LIQUID Observe liquid mode and power "A" lights on but no others CR11 is energized o t<.
CR7 is energized of4 Turn liquid source switch to Position 1. JET PUMP on BYPASS.
O.3.2 Observe mode light on Yes/No YES Observe CV-626 and CV-624 open Yes/No. NES 3
Observe CV-625 is not open Yes/No.
ic5 q
Read FI-664 D 10 c o m I4]PsL6 Adjust PCV-627 so flow is lgpm and Record PCV setting Read PI-661 52 Pst4 Read TI-660
~1D*F Read Cl-663 MeteO,L
_, Sel Sw x OI x 10 for cell constant =
O, 2, u S/cm 8.3.3 Turn to Position 2, JET PUMP Observe Relay CR3 energized Yes/No N e ".2 Yes/No is5 Observe CV-626 closed and CV-624 still open
~
O.16 q om Observe flow is reduced, Read FI-664 Read PI-661 56 PS16 Read TI-660
- 10'F Read CI-663 Meter O. ?.
_, Sel Sw x O.I x 10 for cell constant =
0. '2.
u 5 /cm 0.K.?
oE Observe bottle status lights on liquid side now show status.
Turn ON hot water to Cooler E-605 and E-604 Observe TI-660 increases.
Yes/No I4cE4ASe Y
- _,,_,a;;
coc NO.
G EN ER AL h F!.ECTRIC acv '
DOCUMENT SHEET SPENT FUE L OPERATION SHEET 8
OF 21 TITLE POST-ACCIDENT SAMPLE SYSTEM MANUFACTURING ACCEPTANCE TEST gg q
Turn 0FF hot water to Cooler E-605 and E-604 Put gas vial positioner into dissolved gas position tube and insert su'ffic-8.3.4 iently to place the bottle on the needle and to actuate the limit switch such that panel status light shows bottle to be in position.
All 0.K.?
o It-8.3.5 Hang small volume liquid sample cask on sample station and raise bottle into position on the needles such that limit switch causes status light on panel to show that bottle is in position.
0.X.?
O t.
8.3.6 Turn small volume sample switch HC-616-1 to position 1, TAKE SAMPLE.
Observe mode light is ON,CV624 closed dt.
Observe that CV-616 is energized after about a 10 second delay.
O V-Verify that flow is zero. \\leruman Record FI-664 O.o f ( Jcco FuoW')
~
Put exactly 10cc of water into syringe and inject it into the syringe connection line. Close valves on syringe. Remove syringe. Fill with air.
Reattach syringe and inject air into sample bottle. Turn switch to 0FF.
Remove small volume liquid sample bottle and measure the exact amount of liquid in the sample bottle. Record to cc.
(It should be approxi-mately 10)
Record FI-664 O. 30 g o rn 8.3.7 Special test concerning vo'lume of sample trapped by CV-616 Manually activate micro switch for the small volume sampler.
l Hold a syringe body with valve closed under small volume needles.
Turn HC-616-1 to position 1, TAKE SAMPLE Using the syringe, blow air thru the line and CV-616 to force all liquid into the syringe body. Return switch to 0FF position. Repeat 4 more times. Measure total quantity of water O.65 ml (Should be approximately 0.5 ml)
Repeat above procedure and measure quantity of water O.35 ml.
~
\\
l FORM SF130111177)
I
]
occ no. C5874-Tri GENERAL h ELECTRIC DOCUMENT SHEET nE a som w uon unou SHEET 9
op 21 POST-ACCIDENT SAMPLE SYSTEM MANUFACTURING ACCEPTANCE TEST 6 Ett 8.3.8 Turn switch to Position 3 FLUSH LOOP Observe CV-616 light is not energized CE Observe CV-628 is open o v.
Observe CR4 Relay is energized OE Observe CV-624 is not open et Record Flow FI-664 O. t cl c D m a
Turn switch to 0FF og 8.3.9 Turn switch HC-626 to Position 5 RHR ON BYPASS Observe CV-625 and CV-626 open o lt.
Record Flow FI-664 1.1 L c) DVw (should still be approx 1 gpm) 8.3.10 Turn switch to Position 4, RHR Observe CV-626 closed o k.
Record Flow FI-664
- 0. '2.C) c a rn Record PI-661 59 Psts Record TI-660
%*F Record CI-663 meter O.1
, sel sw x.
O.I
, x10 for S./cm cell constant =
0.2 u
8.4 Take large volume sample 8.4.1 Move large volume sample cask into position and raise bottle on the needles such that the status Ifght shows th.e bottle to be in position All o.k.?
O lt-J h
J
~
e
DOC NO' C5474 TIl GENERAL Q ELECTRICDOCUMENT SHEET arv SPENT FUEL OPERATION SHEET 10 op P1 POST-ACCIDENT SAMPLE SYSTEM MANUFACTURING ACCEPTANCE TEST 5eit. 80% -
8.4.2 Turn switch HC-601 to Position 1, START P-701 and FLOW.
Observe switch mode light is on ott Observe P-701 started and CV-701 open OlG Observe CV-651 and CV-652 open Yes Record PI-662 2.90 Ps t a (should be about 4 PSIA)
Observe both CV-622 valves rotated, lights energized O E.
Record flow FI-664 O.So q om All o.k.?
O ld 8.4.3 Turn switch to Position 2, START P-601 Observe P-601 and P-701 running o g.
Observe CV-651 and CV-652 still open o td Record PI-662 2 8 6 P5tA (still same as above)
Observe both CV-622 valves rotated, lights energized o E.
Record Flow FI-664 c.90goidshould be aoproximately the same as observed in previous step)
All o.k.?
O IL.
- 8. 4. 4 Turn switch to Position 3.
CIRCULATE AND SEPARATE GAS Observe both CV-622 lights de-energized O4 Observe P-601 still running OR Record Flow FI-664 O/2.8com ( should be approximately the same as observed in 8.4.2 )
(Note the sample is now isolated in loop with P-601)
All o.k.?
DIL
- 8. 4. 5 Turn on Freon supply to tracer gas inlet.
Turn switch,to Position 4, INJECT TRACER GAS Observe that valve CV-654 opened, light energized O t' l
With freon detector look for freon gas in the liquid tray being discharged from the check valve near CV-616.
Is there a lot of freon present? Yes/No N5
'ronu ses.as num
)
i
ooc No. C5474 Tll GENER AL h ELECTRIC DOCUMENT SHEET nev SPENT FUEL QPERATION 11 21 POST-ACCIDENT SAMPLE SYSTEM MANUFACTURING ACCEPTANCE TEST btitt 80%
8.4.6 Turn switch to position 5, CIRCULATE TRACER GAS Observe CV-654 light is out.
Od Turn off Freon Observe CV-615 rotated, light energized o K.
Record PI-662 2.8 6 9510 (should still be same as 6.4.3)
All o.k.?
o t.
8.4.7 Turn switch to Position 6, COLLECT DISSOLVED GAS Observe CV-652 and CV-651 closed O(4 Observe CV-653 opened, light energized o k.
Observe Pump P-601 0FF OE Record PI-6G2 (p.[1 PCIA (Reading should be greater than 8.4.G)
All o.k.?
o t.
0.4.8 Turn switch to Position 7, CIRCULATE AGAIN Observe P-601 Running OK CV-653, CV-652 and CV-651 closed ot RECORD PI-662 6. l 4. P51 A (Reading should be same as 6.4.7 above)
All o.k.?
ott 8.4.9 Turn switch to Position S. COLLECT DISSOLVED GAS Observe P-601 stopped o ic Observe CV-653 opened, CV-651 and CV-652 closed old Record PI-662 *1, do P5 t A (Probably higher than 8.4.8)
All o.k ?
ot C.4.10 Turn switch to Position 9, TAKE GAS SAMPLE Observe P-601 stopped, light out o K.
Observe P-701 stopped, CV-701 closed o v_.
8.4.11 Turn spring return to center switch " LOWER PRESCURE/ GAS" to GAS position and hold it until PI-662 is stable.
Record PI-662__3 8 l P5 s A (should be lower than in 8.4.9)
Observe CV-652 is open as long as the switch is held o K.
FOAM 578 30 (11/17)
GE.N ER AL $ ELECTRIC DOCUMENT SHEET aev-SPENT FUEL. OPE RATION 12 y 21 POST-ACCIDENT SAMPLE SYSTEM MANUFACTURING ACCEPTANCE TEST $g[L 80% -Ol After switch is released, remove the gas sample vial from the sample station.
0.K. so far?
O V--
Observe that bottle position light changes to Red _ c (L Turn " Lower Pressure / Gas" switch to GAS again and observe that CV-652 did nut open.
ot (Because bottle removed)
Test sample bottle for a slight vacuum by filling hypodermic needle base with water and then poking needle thru rubber bottle cover. Water will be sucked in if vacuum is present. All o.k.
ClL Have freon probe ready and remove rubber cover from gas vial.
Observe the presence of Tracer (freon) Gas Tinc.crt.(a As Th.ewuT (Very small amount will be present, freon is heavy so tip bottle upside i
down) i Record PI-662 M b PS30 Turn " Lower Pressure / Gas" to LOWER PRESSURE Observe CV-651 now open C V-Record PI-662 11.7 9 PStA Release" LOWER PRESSURE"/ GAS All 0.K.?
ct 8.4.12 Turn switch to Position 10, TAKE. LIQUID SAMPLE Observe CV-650 and both CV-620 valves rotated, o k.
Observe P-701 running and CV-701 open ov Press HC-629-1, PRESS FOR LIQUID SAMPLE, switch and hold for approximately 3
10 seconds.
Observe that CV-629 opens, light is energized, while push button switch is held in olc 8.4.13 Turn HC-601 to Position 11, 0FF Observe P-701 stops, mode light out, all valves closed except CV-625 et Turn switetr to straight up position, 0FF.
8.4.14 Record TI-660.
7I*F Turn ON hot water to Cooler E-604 and E-605 Observe temperature increase at TI-660 l N c.rtas c Turn 0FF hot water to Cooler E-604 and E-605
' FORM SF130 (11/77) e
ooc NO. C5474-TIl G EN ER A L (7p ELECTRIC DOCUMENT SHEET SPENT FUEL. OPERATlON I3 21 POST-ACCIDENT SAMPLE SYSTEM MANUFACTURING ACCEPTANCE TEST b t!fik D 8.5 Flush the Liquid System (Switch HC-628-1) 8.5.1 Check that freon is connected to the flush line OK Turn switch to position 2, START' FLUSH Observe that CV-628 opens 04 Observe that CV-624 & CV-625 are closed og Record FI-664 (variable heading toward zero) Towan.o 2 ee.o Record PI-661 (probably going down)
G o i u6 'Do w e Record TI-660 (probably going up
~7 R
- F Observe that discharge water slows & burps and freon gas is discharged or.
8.5.2 Turn switch HC-628-1 back to the OFF position Disconnect freon from the flush line and connect the derain water to the flush line 0 4'--
i 8.5.3 Turn switch HC-628-1 to position 2, START FLUSH.
Observe CV-628 opens & CV-624 & CV-625 are closed c14 Record PI-661 d3 PS!6 (whenstabilized)
Record TI-660 "18
- F Record CI-663 0. S; O Record FI-664 o. '2.~1 q p m a
8.5.4 Turn switch to position 3, FLUSH V-610 LOOP Observe CV-622 now rotated, lights energized, all other valves same as 8.5.3 c a.
Record PI-661 44. PstG Record TI-660 14*F Record FI-664 o. ~2.0 m om l
8.5.5 Turn switch to position FLUSH P-LOOP Observe all valves same as 8.5.4 og Observe P-610 operating now ele.
Record PI-661 (when stabilized 44 PitG Record TI-660 "13 a F Record FI-664
- c. 2.o c e m (Flow FI-664 should be larger than in 8.5.[on 8.5.4) 0.K.?
old-i l
'F QMU SFl 30 (11/77) 9
G EN ER AL h El.ECTRIC C5474 -T11 DOCUMENT SHEET nEv 1._
SPENT FUEL OPERATION SHEET I4 OF 21 POST-ACCIDENiSAMPLE SYSTEM #ANUFACTURING ACCEPTANCE TEST 5 8.5.6 Turn switch to position 5. FLUSH CV-615 Observe CV-615 now rotated, light energized, other valves same as 8.5.5 e it Observe P-601 still running NES Record PI-661 4 3 F6 t G, Record TI-660 7 7.
- F Record FI-664 0.10 A p N 8.5.7 Turn switch to position 6 FLUSH PIPING STATION Observe P-6010FF clL Both CV-622 rotated, lights 0FF ot CV-615 rotated, light 0FF OL CV-626 now open, CV-624 & CV-625 still closed at Record PI-661
% PS tG '
Record TI-66.0
- 17.
- F I
Record CI-663 Meter O. l
. Sel Sw x 0.l x 10 for cell constant =
o,I !
y S./:m.
Record FI-664 O. 85 7. Gym (should be much larger than 0.b.( )
8.5.8 lurn switch to position 7, FLUSH CV-622 LOOP Observe CV-626 now closed OZ Record PI-661 4.4 PstG Record TI-660 7 l 8' F Record CI-663 Meter o.I
, Set Sw X o.1 x 10 for cell constant =
0.I AS./ cm Record FI-664 o, I d ci pm (should be close 'to 3.5.3 ok 6k. )
Turn off RWR Sample Turn : witch to straight UP & OFF Remove largt volume sample and measure volume L O c. c-8.6 Set up for Gas Sample (Switch HC-700) 8.6.1 Turn liquid or gas selector switch to GAS Observe mode light for gas now on clL.
With HC-723 in position 1, observe gas sample source mode shows DRYWELL ATMOS.
Dr Observe P-702 running DE.
Observe CV-702 open, light energized
- ronu sn.as mme p_K.__
j
LD4/4-Iii GENERAL h ELECTRIC d
DOCUMENT SHEET nEv >
SPENT FUE L OPERATION 21 SHEET 15 op POST-ACCIDENT SAMPLE SYSTEM MANUFACTURING ACCEPTANCE TESTM[L Observe CV-723 rotated, light energized OK Observe CR-7 energized o rc Observe CR-9 energized nv 8.6.2 If gas filter drawer with filter cartridge holder is not already in, put it in.
Observe that CR13 is energized oll Observe that filter status green light is on o t.
Remove gas filter drawer and observe filter status red light on o v.
Put gas filter drawer back into position OK Observe that green status light is lit o v_
8.6.3 With gas sample bottle not yet in, Observe sample bottle red status light is lit OK Put gas sample bottle into sample station Observe bottle status green light now lit at 8.7 Take gas sample 8.7.1 Turn 10 ML gas sample switch HC-705 to position 2, CIRCULATE GAS Observe mode light come ON 6K Observe P-702 still running and CV-702 & CV-723 are still energized O k.
Observe CV-711 opens o k.
Observe CV-718 and CV-719 opens Ok Observe CV-712 de-energized CV-720 & CV-721 remain closed OE Observe suction on DRYWELL ATMOS penetration inlet line c E.
Record PI-726 O
Record PI-727 O
Record FI-725 1') scfk
- 8. 7. 2 Inject some Freon into Drywell Atmosphere inlet line and then move on to next step fairly quickly.
Turn to position 3, EVACUATE BOTTLE Observe CV-711 and CV-718 close olc Observe CV-721 opens o k.
Observe CV-719 renains open ok k
Read PI-708 3.~1 4 P s: A Read FI-725 O
(should be zero now)
'PORM SF140111/77) 1
=
CL474 -111 GENER AL h ELECTRIC DOCUMENT SHEET aev 7
SPENT FUEL. OPE RATION.
16 21 y
POST-ACCIDENT SAMPLE SYSTEM MANUFACTURING ACCEPTANCE TEST b 6 U b O 8.7.3 Turn to position 4, TAKE SAMPLE Observe CV-711 and CV-718 open OE Observe CV-719 and CV-721 close O V-Observe CV-720 still closed Ot Read PI-708 3.96 PSIA (no change fran 8.7.2 above) 8.7.4 Press HC-720, PRESS FOR SAMPLE, and Hold for about 5 sec until PI-708 stops changing.
Observe CV-720 opens oN Record PI-708 when stable I d..(o 1 P s l A (notePSIAhigherthan8.7.3)
Remove Sample Bottle fran station and test for vacuum in bottle lest for some freon in the sample bottle, o.k 7 c l(.
- 8. 7. 5 Turn to position 5, FLUSH SYSTEM and note time.
i Observe CV-713, CV-718 and CV-719 open OL Run until no freon detected at secondary containment outlet line.
Record time till no freon detected at outlet. 2 0 SEECOMD5 8.7. 6 Turn to position 6 and 7 and straight up to 0FF 8.8 Test Sample Selector System Position 1 of sample selector switch HC723 was just tested in 0.7.1 above.
- 8. 8.1 Turn switch to position 2, SUP'N POOL ATMOS '
Observe mode light changed properly CL Observe P-702 running and CV-702 open and CV-723 rotated orc
- 8. 8.2 Turn 10tL Gas Sample Switch HC-705 to positicn 2, CIRCULATE GAS Observe suction on suppression pool atmosphere inlet line ok-Record PI-726 o
Record PI-727 o
Record TI-724 104* P Record FI-725
'l.B ScCh Observe that CV-723 rotated, light lit oL
\\
I TOMM 87130 (11/773 l
l t
acao. cs474 m 3
G EN ER AL h ELECTRIC DOCUMENT SHEET nov a SPENT FUE,L OPERATION SHEET 17 OF 2I TLE POST-ACCIDENT SAMPLE SYSTEM MANUFACTURING ACCEPTANCE TEST $ sit. 60 8.8.3 Turn sample selector switch HC-723 to position 3, 2ND CONT'MT ATM Observe CV-723 not energized OIL Observe P-701 is running o tt Observe CV-701 open o t/_
Observe suction at secondary containment atmosphere inlet line O ld 8.8.4 Turn sample selector switch HC-723 to position 4, SPARE Observe CV-723 not energized Observe P-701 is running & CV-701 open ol6 Observe suction at spare inlet line Ott Record TI-724 (o4"F Record F1-725 So sc6 Record PI-726 O
Hecord PI-727 O
Turn HC-705 to UP and 0FF 8.9 Take iodine sample. Not timed. Turn TIMED SAMPLE SWITCH TO NO.
8.9.1 Turn switch HC-712, IODINE CARTRIDGE SMPL SW to position 2, CIRCULATE GAS Observe pump P-701 is running (HC-723 still on SPARE) 04 Observe CV-701 is open cic Observe CV-711, CV-718 and CV-719 are open OK Record TI-724 to 5 F Record FI-725
'5 0 5 c G Record PI-726 O
Record PI-727 O
Place cap on " SPARE" sample inlet line to stop flow.
Measure Vacuum PI-726 20 in. l-l4, Record Flow O
(should be zero)
Remove Cap,.
8.9.2 Turn switch to position 3. GAS THRU CARTRIDGE.
Observe CV-712 rotated, light lit Ok (Timed Sample Switch in N0 POSI IU"I i
Observe other valves are same as in 8.9.1 c (4 Record PI-726 o
(should be near 0 on gage) i Record PI-727 15 tn. IM (should be approx 20" Hg. Vac)
I Record FI-725
% sclh' (should be lower than in 8.9.1)
' FORM $F139 (11/17)
C5 0 4 Ill
)
G EN E R A L @ El.ECTRic DOCNO.
DOCUMENT SHEET REV-SPENT FUEL OPERATION
)g p)
POST-ACCIDENT SAMPLE SYSTEM MANUFACTURING ACCEPTANCE 'IESl:S 8.9.3 Turn switch to position 4, EVACUATE CARTRIDGE Observe CV-711 closed, light off O V_
Observe CV-712 rotated, light lit o E.
Observe CV-718 & CV-719 open oic Record PI-727 19 tn. llc, (should be around 20" Hg Vac)
Record PI-726 ').l in. (4 d, (3hould be around 20" Hg Vac)
Record FI-725 o
(should be zero) 8.9.4 Turn switch to position 5, FLUSH CARTRIDGE Observe CV-713 opens, light lit C IC Observe CV-712, rotated, light lit OK Observe CV-719 and CV-718 open o k.
Record PI-727 15 in.144 Record PI-726 O
Record FI-725 (4 sc.f h Record TI-724 lD6 I~
8.9.5 Turn switch HC-712 to UP and 0FF 8.10 Take timed Iodine Sample from suppression pool 8.10.1 Turn HC-723 to position 2, SUP'N POOL ATMOS OK Turn TIMED SAMPLE SWITCH TO YES o k.
Set timer KC-712 for a 30 second sample Ol6 Turn switch HC-712, IODINE CARTRIDGE SMPL SW to position 2, CIRCULATE GAS Observe pump P-702 is running C E.
Observe valve CV-702 is open ot Observe valve CV-723 rotated, light light OV Observe valves CV-711, CV-718 and CV-719 are open n k.
Record TI-724 L D 6, E
I Record FI-725 'L9 Sef h Record PI-726 O
Record PI-727 0
\\
. - -. ~ _ _ -
'FOR M SFI 3e (H f77)
GENERAL h ELECTRIC DOCUMENT SHEET nev SPENT FUEL OPERATION I9 21 TLE PUST-ACCIDENT SAMPLE SYSTEM MANUFACTURING ACCEPTANCE Tt 8.10.2 Be ready to take readings quickly, within 30 seconds.
Turn switch HC-712 to position 3, GAS THRU CARTRIDGE Record PI-727 i5 in. Lig Record PI-726 O
Record FI-725 l d. s c-fh Observe that CV-712 rotated, light lit for interval set on timer KC-712 o nc.
Allow timer to time out & observe that CV-712 was de-energized o.k.?
oR 8.10.3 Turn HC-712 to position 6, 0FF All o.k.?
'6E Turn switch to UP and UFF 8.10.4 Remove cartridge drawer from sample enclosure.
Observe status red light for filter cartridge indicates cartridge is not IN c ic 8.10.5 Remove the cartridge holder from the drawer O A.
Insert the drawer into the sample enclosure.
Observe that the status light still shows red indicating that the filter cartridge is not in place ce Turn switch HC-712 to position 3, 4 or 5.
Observe that valve CV-712 does not rotate, light stays off, when the filter cartridge is not in place oe 8.10.6 Record any coments or questions concerning tne operation of the sample system equipment or logic _(separate sheet may.be used) 8.11 Test interlocks. There are many interlocks to assist the operator in avoiding errors.
8.11.1 With HC-712 still in position 3, 4 or 5 and pump P-702 running, turn sump selector switch HC-715-1 to position 2, BLOW COLLECTOR.
1 Observe that P-702 stops oE Drain system mode light on oE Iodine cartridge sample mode light off oE
^-
em...
- nim,
DOC NO. C5474-Tll GEN ER AL h ELECTRIC 2
DOCUMENT SHEET n't SPENT FUEL OPERATION 20 op 21 SHEET TITLE POST-ACCIDENT SAMPLE SYSTEM MANUFACTURING ACCEPTANCE TES Run HC-715-1 sump system thru all switch positions to clear'the trap and sump of water. Was any water discharged?
Mo Leave HC-715-1 in the UP and 0FF position 8.11.2 Turn liquid sample switch HC-601, HC-628-1 and HC-616-1 to any position.
Did mode light for HC-712 stay ON?
Y E <>
(itshould)
Did any other mode light turn ON?
M6 (it should not) 8.11.3 Turn Liquid / Gas Switch to 0FF Did mode light for HC-712 go off?
h5 (itshould)
Turn Liquid / Gas Switch to LIQUID Turn HC-626 to Position 4 (RHR)
Turn HC-601 to any position Turn HC-628-1 to any position Did mode light for HC-601 stay lit?
Ro (it should not)
Did mode light for HC-628-1 turn on? YES (it should )
Turn both HC-601 and HC-628-1 to 0FF Now first turn HC-628-1 to any position and then turn HC-601 to any position.
Did mode light for HC-628-1 stay on?
YES (itshould)
Did mode light for HC-601 turn on?
tdo (it should not) 9
, -..... n m,,
e
. GEN'ER AL $ ELECTRIC DOCUMENT SHEET 2
uv 1
srtNT FUEL OPERATJON g
I lgg 8 o 3 6 - 0'I POST-ACCIDENT SAMPLE SYSTEM MANUFACTURING ACCEPTANCE TEST
$cc. C7 B.12 Was test successful in all respects?
f($
If no, list the items that were wrong.
(Separate sheet may be used.)
- For bono To Reent.i e,e n Te to rren.5, cAuau non a n pegm o l *&*l - 8 (.
" DATA
- Nc.Lu po su QA VATA P Ac.eA6 E.
p3ly) l6sb (les m E %bn I
Mit Te~st E neer int & Sign)
/
/
/ Dato' B.13 Vendor's Representative Witnessing this test.
r
/ h]
~l 3
Y S'aN (A' e-a PrintName
\\--S[g na ture Da'te
\\
8.14 GE Co. QA Representative Witnessing and approving this test.
Mate-
/dMW b eh. M A stco ut s Signatu[
Date Print Name i
i O
-(
1 i
co; no. Cypam j
GEHER At Q ELEMRK B000MERI SllEET
$ PENT FUEL QPERATION 20 g __30 TLE LOCA Sampling Station - Fabrication Specification
- scfs, Scig-o7 10.3 Final Acceptance Check List Vendor'sname(Printed) jfW ' /NB05 70 /E5 Vendor's Representative perfonning inspection Z WN/T5urnD GE-QA Representative performing inspection _ (t/,C. Wagrincul Yes or No Initials 1.
Sub-assemblies conform to arrangement and Yes
_C //f@ p/zy/s/
dimensional requirements of drawings.
2.
Tubing and materials confonn to Section 7.7
/F5 h' COL'/2 f/'/
and reference drawing requirements.
3.
Welding complies with requirenents of YE5 h/(k ' 14/
Section 7.6.
t 4.
Electricc1 wiring complete per Section 8.0.
Ye5 d'Nl '/4' b
/2 7I '/3'/4' i
5.
Electrical Testing complete per Section 9.4 Ye5 6.
flameplates and identification tags complete per YE5
'd?N' Sections 7.11, 8.4 and specification data sheet 7.
Hydro and pneumatic testing complete per G5 C
'4f/V Section 9.0.
8.
Painting complies with requirements of Yn
[d /' IJY&
Section 7.9.
9.
Acceptance testing complete per Section 3.7.
Ye'5
'4 W 10.
Vendor data complete per Section 11.0.
YFs O6O V2f///
Remarks 3 o iT/
Vendor'Repf esehtative Signature Date '
AMs er (,
Ml Dt <~ t Cb i18 l GE-QA Approval Signature Date
- l s
_,,,,,/
'Fonu 87848 (11/77)
'.%. W.hk 1,.,
l W'
$.'~ '
'Rk.z'.h:{;)~. Unit
'tial tt, QU(-d Q'f. -
- '[,.f
-l LOCA PACKAGING CHECKLIST Box 51:
Box $6:
(1) Control Cabinet Assy (1) Refregeration Unit (3) Detectors-Serial 6,Mg,7 Serial #3hf[d,$$-d h[
Serial S M Box $7 Serial 9 //[f (1) Container with:
'f(
(11) Cables JP (1) crimper, CR104G50A KP (4) rod. filters, GY130 LP (1) orifice, XX50-000-30 g MP (1) syringe', 2132
/d/
NP-1 (6) o-ring, 2-34 fIf NP-3 (1) o-ring, 2-31 VP (2) o-ring, 2-28 RE507 (1) screen, 72970 RE665 (1) disc, 72971 RE704 (4) filter, Type A FET664 (2) stopcock, 3152 Box 42:
(f ) 7JAe Afurtcut 4f-Ig (1) Sample Cave w/ lead Restraints
()
swp6 goer Box #3 (1) Lead Glass (2) heedle Insertion Tool WJ (21) Lead Bricks (1) Lead Drawer (1) Cartridge Drawer yd D x 64:
(1) Cartridge Holder (1) Piping Station (1) Vial Positioner gj D x 15:
(1) Small Volume cask M
- 1) Gas Tray
[
()
(1) Liquid Tray M
Box 48 (optional)
(1) Test Stand
./p), '[',01-004 i
, PAGS 2 or */
WELDOG3 INSPECTICH BDORT es4 1/-F-soi x/,bo ra Iw, au SHEImi
/
S oF 1 INSPECIOR b
,,v.
<s <
,PN, sae,,
cuST PoN M e> T - k'(4 0 S @
2 b '-
?
J d} A NELDCR'S agi m
[
WCLD INSPECTICH PER ABCNE SPECIFICATIONS SIALL BE VISUALLY CHXXED t
AS BEllM PRIOR 10 WELD INSPECTION. WC[I6 MUST BE CLEAN. N N ARY PREPARATION IS REQUIRED.
b0 FUSION PDEIRATION hed CnAaS de os Scar.
A,u SPIRITER 6tM's
- >m, um WuD INSPECTICN
/00
- 1004, 804,
- 60s, 504 DISPOSITION APPRCVAL REJECTION STNIUS
- N-
' l'
.h/
.., n/so rINAL mTE s
9 e
e W
.. ee,i s, '., '.
. ;.;.. p,i) *t r.*.
(
t QI - 013 Rev. 0
,, Paga 5 of 5 Fo 3(. - o7,
Gas Tray.
ICCA SYSHM PRESSURE Turf BDGUS
- HmuVONic 2.0 IIYDnoErrATIC TESP NA
//
3.0
. PNWMNTIC TEST l-%3-If Q.A. Verification / bate
/,7 2 - P I
/
Custmer Witress/Date sAot
/-2 2 -F /
e
)
(
-)
OI - 013 Rev. 0
. Paga 5 of 5 8036- 0 7 Piping statiort JPW INDUSIRINS, INC.
ICCA SYSTEM
- 3. e c N TESr iDGUS h ua g e
'.0 IWDnosrATIC TESP 2
'3. l-$ l 3.0 PNW MATIC TCSr "J. l - 6 l Q.A. Verificatical/Date
~lpf);
/
/
Custmar Witness / Data Ih!fh/
(
e i
j 9
(.
t-(
OI - 013 Rev. O Paga 5 of 5 8036- 0 1 Liquid Tray
- msmES, uc.
m.w -
PRESSURE M 3.,,..
SDm2 iunuvtATE
.d
/M/f-33,-6l 2.0 HYDROSTATIC T m f 3.0 PNEIJmTIC TESP D
[l-22.- 6 l l
- Q.A. Verification /Date A$f JQkt/
/
Custater Witness /Dato cebs
/-7 2-3 /
F j
i l
i 9
(
}
~
Or - 013 Rev. O 8036- 0 7 Page 5 of 5 Samplo cave JPW INDUSIRIIS, INC.
IOCA SYSID4 3, c..
HIESSURE TESP N
TmIuT/DATE 2.0 HYDROSTATIC TEST h
h~ f-a l _ (( l 3.0 PNEUMATIC TESr hh
- f. g /. g l v
Q.A. VerificaticrVDate AW
/-)/Jf 0$ enc (crx - /.2(-8/
9 s
9 ee g
e
Agenda For NRC Visit Tuesday. April 23, 1985 Room 2152 9:00 a.m.
M. Laggart/J. R. Thorpe o Procedures to Implement Tech Spec Changes e Licensee Late Submittals/How to Reduce
.e Status of Licensing Action Items 10:00 a.m.
J. S. Chardos - Long Range Plan e Prioritization/ Integrated Schedule Impact on Resources e Plant Improvements & NRC Requirements 11:00 a.m.
R. W. Keaten - Appendix "R" C. R. Tracy - EQ + New Organization 12:00 p.m.
Lunch 1:15-1:30 R. F. Wilson The NRC will want to leave the office at 3:00 p.m. for Newark.
m
--s "a
= -
"h 18*a
!n
~_
e 1%
r SO Y
~
Eg t
3 l1
~
g e.f..
off t
se
_m m
It1 lit:!
8 o
e
(*)
l
~
l *$
d' 1
I
(
2l
.
4c ia, r. i DAYS e
OBJECTIVES FOR NEXT OYSTER CREEK OUTAGE e REFUEL e COMPLETE MOST ALL PAST/ CURRENT REGULATORY DRIVEN WORK e IMPROVE EFFICIENCY / PRODUCTIVITY OF WORK IN THE PLANT -
DERIVE BENEFIT THEREFROM e COMPLETE MAJOR PLANT INSPECTION PROGRAM - REGULATORY AND COMPANY DRIVEN e MAJOR EFFORT TO PROTECT PLANT FROM FUTURE PIPE /Rx STRESS CORROSION CRACKING e SUBSTANTIAL PLANT EQUIPMENTIMAINTENANCE UPGRADING
=
OYSTER CREEK NEXT OUTAGE PLANNING LEGAL & REGULATORY CONSIDERATIONS e NO SCHEDULED SHUTDOWN NOVEMBER 30, 1985 TO MARCH 31, 1986 (STATE N.J. ENVIRONMENTAL PROTECTION) e COMPLETE APPENDIX R FIRE PROTECTION WORK NEXT REFUELING OUTAGE (NRC)
- COMPLETE EQUIPMENT QUALIFICATION (E0) NOVEMBER 30, 1985 (NRC) e NRC ORDERED INSPECTION - CORE SPRAY, RX FEEDWATER N0ZZLES, RECIRC PIPING. ISOLATION CONDENSER PIPING e NRC ORDER COMPLETE ALL REMAINING NUREG 0737 ITEMS e NRC ORDER TO COMPLETE MARK 1 CONTAINMENT MODIFICATIONS -
ATTACHED PIPING
OYSTER CREEK WORK SCOPE e
SUMMARY
ALL WORr(
1 APPR0XIMATE #
I I
NO. JOBS / ITEMS REGULATORY DRIVEN I
I CAPITAL PROJECTS I
I I
28 t
50%
I I
I I
I SPECIFIC OSH PROJECTS 1
I 60 1
101 1
i SPECIFIC IDENTIFIED INSPECTIONS / TESTS 40 10%
I l
l HAJOR SPECIFIC MAINTENANCE ITEMS 1
30 APPROXIMATE CORRECTIVE MAINTENANCE W.0.'S 3000 I
1 l
l I
nn
MAJOR 11R ACTIVITIES e IHSI 0F RECIRC LOOP WELDS e RECIRC LOOPS DECON e DRYWELL SURFACE DECON e APPENDIX "R" MODS um h hoTuMA.
e ESSF TIE-INS IN CONTROL ROOM b
e RCS WELD INSPECTION e FW N0ZZLE INSPECTION e RBCCW Hx REPLACEMENT
~
~
i l
~
11R OUTAGE
SUMMARY
1.
IHSI WITil CHEMICAL DECON OF RECIRC LOOPS (REQUIRES FUEL UNLOADING & VESSEL DRAI WITH MINI-0UTAGE
SUMMARY
TABLE I
I PEAK I
CAPITAL /0&M I
I I
I I
l I
i l CONTRACTOR I
CONSTRUCTION IESTIMATED LENGTH I
PEAK I
I I
I I
l OPTION LEVEL l
MAN-HOURS (MONTHS)
CRAFT LEVEL
!ALARA MAN-REM i
750 160,000/150,000 6
500 1000 I
I I
I I
i
g a
s M
a s
e lf e
S y
i a
OR a*
E I
s E
u W
Y O
s' j
!l P
b M r DL L
}
UP S
es s
LM i
CE C
N l
C IM E
L TT E
OS NY N
i
/
I S
S L
EU I.
OP N
DG U
T 4)
E N
T A
~
O L
N P
}
~E A.
I c.I A
R M
- ~
I I
I P F.
L AC
.Y tC W
[
[
M M
L-CG e
N UI S
4W Y
I f
A '
A
- L E
D
- P R
N A
L I
H U ^LN L
PAR L
I G
S E
F G
R N
F N
'U O
O N
B
(
L T
O L
T I
C0 S
N A5 R
A R7 E
I L
T P
P N
OX 1
CO F
N A
R A
J LP R
[
AP C0 TA 0
iI O
R5 T
O T.
C CX M
OA C
P I
sW
. 4 f
C i
H SY K
A A
D E
I.
f.
s.
/
P O
u S
R i
m s
S
)
g U ou n?
m
(
p
,3 m
M a
G X
s s
P P
2 i
AI l
Is w
5 1E w
l' t
s d
e wF M
s e
s a
8 4
u 7
0 s
s 8
d dl N
v 4
3, N
e
^
s M
a a
/
m
=
=
i
~
= ""
0YSTER CREEK OUTAGE WORK SCOPE PROPOSED DEFERMENTS & CANCELLATIONS 1
NRC DEFERMENT /
ITEM / PROJECT COMMITMENT CANCELLATION FEEDWATER N0ZZLE INTERNAL INSPECTION YES CANCELLATION CONTAINMENT VENT & PURGE YES CANCELLATION
[AkTYPARAMETERDISPLAYSYSTEM(S0FTWARE)
YES DEF ERMENT SC03E RECIRC VALVE INTERLOCK MODIFICATION YES CHANGE RADIATION SIGNALS VENT & PURGE VALVES YES CA9CE 1A" ION 3ULK-DE ;E 11 EN'~
TORUS TEl1PERATURE INDICATION MOD VAPOR-YES CANCELLATION CONTROL ROOM CONSOLIDATED DISPLAY YES DEFERMENT To 125V DC PANEL REPLACEMENT YES CANCELLATION TORUS ATTACHED PIPING SUPPORTS-EXTERNALS YES DEFERMENT ISOLATION CONDENSER HIGH POINT VENTS YES CANCELLATION
' BLOCK WALLS YES DEFERMENT 7tTM
~NRW VAULT C0ATING YES CANCELLATION ADS LOGIC YES DEFERMENT RECIRC VALVE I9TER9AL INSPECTION NO DEFERMENT
- 2 DIESEL GENERATOR ROTOR AND STATOR REFURBISHMENT NO DEFERMENT ALTERNATE DECAY HEAT REMOVAL SYSTEM NO CANCELLATION CONTAINMENT SPRAY SAMPLING SYSTEM NO CANCELLATION l REMOTE ISO COND. VALVE FEEDER CABLES I
N0 U DEFERMENT I
k Wf MW*
m q m w vs.t % a mE
~
b5 QclG. \\ \\.
o Overall Proposed Oyster Creek 1985-86 Outage Planning
- o.
c E
3 (t-s$
E O
Em2j g
-.2 2
0 55$
Ek$E 2
E#88 lYlll)
/
Scheduned Outage
/Ylllllllllllllllllllllllllllllllll) l Mini-Outage Refueling Outage Peak Craft 180 500 Craft Man-days
- 2,500
- 40,000 ALARA - Man-rem -
40 1,000 1I I
I I
I I
I I
I I
I I
I I
q l
' Sept ' Oct Nov ' Dec ' Jan Feb ' Mar ' April ' May ' June ' July ' Aug ' Sept Oct 1985 1986
,