Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20126G133 + (23:49:31, 12 December 2024)
- 05000348/LER-1992-007-01, :on 921128,230 Kv Switchyard Breakers 800 & 904 tripped,de-energizing 1A Startup Transformer Causing LOSP Esfa.Caused by Inoperable U-bend Heaters Due to Blown Fuses. Switchyard Breakers Have Been Replaced + (23:49:33, 12 December 2024)
- ML20126G128 + (23:49:34, 12 December 2024)
- ML20126G130 + (23:49:34, 12 December 2024)
- 05000334/LER-1981-022-03, /03L-0:on 810211,control Room Chlorine Detector 101B Was Tripped Upon Discovering That Electrolyte Was Not Dripping.Cause Not Stated.Flow Orifice Cleaned & Wick Replaced.Investigation Underway + (23:49:36, 12 December 2024)
- ML20126G126 + (23:49:38, 12 December 2024)
- 05000334/LER-1981-021-03, /03L-0:on 810210,safety Injection Accumulator 1B, (SI-TK-1B) Low Level Alarm Sounded.Caused by Chemist Leaving Valve Open Following Sampling & Tank Draining Down. Valve Shut + (23:49:40, 12 December 2024)
- ML20126G123 + (23:49:41, 12 December 2024)
- ML20126G121 + (23:49:42, 12 December 2024)
- ML20126G120 + (23:49:44, 12 December 2024)
- ML20126G119 + (23:49:45, 12 December 2024)
- ML20126G116 + (23:49:46, 12 December 2024)
- ML20126G118 + (23:49:46, 12 December 2024)
- ML20126G115 + (23:49:47, 12 December 2024)
- ML20126G113 + (23:49:48, 12 December 2024)
- ML20126G114 + (23:49:48, 12 December 2024)
- 05000348/LER-1992-008-01, :on 921213,reactor Tripped on Feedwater Flow Less than Steam Flow Coincident W/Low SG Water Level on C Sg.Caused by Cracked Fuse.Sampling Fuse Insp Will Be Performed on 7300 Relays Cards + (23:49:50, 12 December 2024)
- ML20126G111 + (23:49:51, 12 December 2024)
- ML20126G109 + (23:49:52, 12 December 2024)
- ML20126G107 + (23:49:53, 12 December 2024)
- ML20126G108 + (23:49:53, 12 December 2024)
- ML20126G106 + (23:49:54, 12 December 2024)
- ML20126G105 + (23:49:55, 12 December 2024)
- ML20126G102 + (23:49:55, 12 December 2024)
- ML20126G101 + (23:49:56, 12 December 2024)
- ML20126G098 + (23:49:57, 12 December 2024)
- ML20126G095 + (23:50:12, 12 December 2024)
- ML20126G094 + (23:50:12, 12 December 2024)
- ML20126G093 + (23:50:13, 12 December 2024)
- ML20126G090 + (23:50:14, 12 December 2024)
- ML20126G091 + (23:50:14, 12 December 2024)
- ML20126G089 + (23:50:15, 12 December 2024)
- ML20126G088 + (23:50:16, 12 December 2024)
- ML20126G085 + (23:50:17, 12 December 2024)
- ML20126G087 + (23:50:17, 12 December 2024)
- ML20126G081 + (23:50:18, 12 December 2024)
- ML20126G082 + (23:50:18, 12 December 2024)
- ML20126G079 + (23:50:19, 12 December 2024)
- ML20126G074 + (23:50:20, 12 December 2024)
- ML20126G077 + (23:50:20, 12 December 2024)
- ML20126G072 + (23:50:21, 12 December 2024)
- ML20126G071 + (23:50:22, 12 December 2024)
- ML20126G070 + (23:50:23, 12 December 2024)
- ML20126G068 + (23:50:23, 12 December 2024)
- TXX-9264, Responds to NRC Re Violations Noted in Insp Repts 50-445/92-33 & 50-446/92-33.Corrective Actions:Licensee Will Address Concern at Quality Accountability & Form Committee Meetings + (23:50:24, 12 December 2024)
- ML20126G062 + (23:50:25, 12 December 2024)
- ML20126G064 + (23:50:25, 12 December 2024)
- ML20126G060 + (23:50:26, 12 December 2024)
- ML20126G059 + (23:50:27, 12 December 2024)
- ML20126G058 + (23:50:28, 12 December 2024)
- ML20126G056 + (23:50:29, 12 December 2024)