ML20126G107
| ML20126G107 | |
| Person / Time | |
|---|---|
| Site: | 05200002 |
| Issue date: | 12/22/1992 |
| From: | Mike Franovich Office of Nuclear Reactor Regulation |
| To: | Pierson R Office of Nuclear Reactor Regulation |
| References | |
| NUDOCS 9301040066 | |
| Download: ML20126G107 (5) | |
Text
,
p ateu
+
UNITED STATES
[
o,h.
NUCLEAR REGULATORY COMMISSION g
j WASHtWGTON, D. C. 20665
- s., **.../
December 22, 1992-Docket No.52-002 MEMORANDUM FOR:- Robert C. Pierson, Director Standardization Project-Directorate Associate Directorate ~.for Advanced Reactors and License Renewal Office of Nuclear Reactor Regulation 1
FROM:
Michael X. Franovich, Project Manager Standardization Project Directorate.
Associate Directorate for Advanced Reactors and License Renewal Office of-Nuclear _ Reactor Regulation-
SUBJECT:
NOTICE OF MEETING WITH ABB-COMBUSTION ENGINEERING-(ABB-CE) FOR SYSTEM 80+ (PROBABILISTIC' RISK ASSESSMENT)
DATE AND TIME:
January 4 and 5 1993_(8<a.m. - 5 p.m.)-
LOCATION:
ABB-Combustion Engineering, Inc.
1000 Prospect-Hill Road.
Windsor,' Connecticut--
PURPOSE:
To discuss the System 80+ probabilistic-risk.. assessment issues. : A proposed agenda is enclosed.
w O CDQ(JMSdiOttumaVYl'"% OG TipRf i
M:
gQQ30 O h h!-
h 9301040066 921222-
.'I PDR ADOCK 0S200002 l
A -.
.PDR. g 1
'. December 22, 1992 PARTICIPANTS *:
NRC ASjff A. El-Bassioni S. Lee S. Ritterbusch G. Bagchi M. Franovich D. Finnicum R. Palla N. Saltos R. Schneider J. Kudrick A. Drozd R. Youngblood (BNL)
C. Lin (BNL)
(Original signed by)
Michael X. Fraravich, Project Manager Standardization Project Directorate Associate Directorate for Advanced Reactors and License Renewal Office of Nuclear Reactor Regulation
Enclosure:
Proposed Agenda cc w/ enclosure:
See next page
- Meetings between the NRC technical staff and applicants or licensees are open for interested members of the public, petitioners, intervenors, or other parties to attend as observers pursuant to "Open Meeting Statement of NRC Staff Policy," 43 Federal Reaister 28058, 6/28/78.
Members of the public who wish to attend should contact me at (301) 504-1121.
ELSTRIBUTION:
Docket File PDST R/F TMurley/FMiraglia WRussell PDR DCrutchfield WTravers JNWilson RPierson TVWambach RBorchardt TBoyce AEl-Bassioni MXFranovich PShea JMoo.'e, 15818 EJordan, MNBB 3701 GGrant, ED0 ACRS (10)
OPA NRR Mailroom, 12G18 P0' Dell, PMAS NSaltos, 10E4 JKudrick, 8D1 SJLee, 7H15 GBagchi, 7H15 RPall a, 10E4 ADrozd, 801 0FC:
LA:PDST:ADAR PM:PDST:ADAR SC: POST:ADAR ll NAME: PShea:tz yy MFrajdfich RBophardt 12/y/I 12/U/92 12/ph/92 DATE:
0FFICIAL DOCUMENT COPY:
CMTG0104.MXF
e ABB-Combustion Engineering, Inc.
Docket No.52-002 cc:
Mr. C. B. Brinkman, Acting Director Nuclear Systems Licensing Combustion Engineering, Inc.
1000 Prospect Hill Road Windsor, Connecticut 06095-0500 Mr. C. B. Brinkman, Manager Washington Nuclear Operations Combustion Engineering, Inc.
12300 Twinbrook Parkway, Suite 330 Rockville, Maryland 20852 Mr. Stan Ritterbusch Nuclear Systems Licensing Combustion Engineering, Inc.
1000 Prospect Hill Road Post Office Box 500 Windsor, Connecticut 06095-0500 Mr. Daniel F. Giessing U. S. Department of Energy NE-42 Washington, D.C.
20585 Mr. Steve Goldberg Budget Examiner 725 17th Street, N.W.
Washington, D.C.
20503 Mr. Raymond Ng 1776 Eye Street, N.W.
Suite 300 Washington, D.C.
20006
1.
r> =
PROPOSED AGENDA NRC AND ABB-CE PRA MEETING Windsor, CT (January 4 and 5,1993) 1 l
.fanuary 4.1993 i
Morning Session (8:30 a.m. - 12 p.m.)
1 1
4 (1)
Overview of DSER Level 1 PRA Open Items:
- ABB-CE Presentation j
- Review of ABB-CE Responses and Cross-reference with Updated j
PRA Submittal 4
- Discussion (2)
New and/or Updated Level 1 Analyses:
- ABB-CE Presentation
- Discussion i
- Schedule (3)
Fire and Flood Assessments:
i
- ABB-CE Presentation j
- Discussion
- Schedule (4)
PRA Based Insights / Input to ITAAC/DAC, RAP, and Related DSER Open Items i
Afternoon Session (1 p.m. - 5 p.m.)
l~
(5)
Overview of DSER Seismic Open Items and PRA Based Margins Assessment:
-: ABB-CE Presentation F
Discussion Schedule l'
(6)
Containment Fragility Curve Enclosure h,-,--
-4 s
,o i
jj
. 1 i.
j
.fanuary 5.1993 i
Morning Session (8 a.m. - 12 p.m.)
I f
(7)
Overview of DSER Level 2 and 3 Open Items and Related Issues:
j
- ABB-CE Presentation 1
- Discussion I
- Schedule
- 4 3,
(8)
Summary of Action Items and Commitments i
4 i
F Afternoon Session (1 p.m.
4 p.m.)
(9)
MAAP Code /Results and Level 2 PRA (Palla, Kudrick, Drozd) t t.
4 i
d M
4 d
5 I
4 4
-.,,,...,,. ~,,
w.
.,.c.,
e -m. ~.
s _
,,.,,.... -