Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20128F000 + (19:09:23, 12 December 2024)
- ML20128E999 + (19:09:25, 12 December 2024)
- ML20128E998 + (19:09:25, 12 December 2024)
- ML20128E997 + (19:09:26, 12 December 2024)
- 05000341/LER-1993-001, :on 930104,HPCI Turbine Exhaust/Exhaust Drain Valve Did Not Fully Open.Caused by Coil in HPCI Turbine Exhaust Valve Open Relay Deenergized.Relay Replaced & Retested to Ensure Proper Function + (19:09:28, 12 December 2024)
- SNRC-1184, Forwards Clarified Responses to Generic Ltr 83-28,Items 2.1.1,2.2.2,4.5.1,4.5.2 & 4.5.3,in Response to NRC .Encl Responses Address Reactor Trip sys,safety-related Equipment,Functional Testing & Testing Intervals + (19:09:29, 12 December 2024)
- ML20128E994 + (19:09:29, 12 December 2024)
- ML20128E989 + (19:09:31, 12 December 2024)
- ML20128E988 + (19:09:31, 12 December 2024)
- PLA-3913, Advises That Ds Hays (Operator License OP-10759) Tentatively Accepted & Currently Performing Duties Associated W/Another Position within Util Which Does Not Require Reactor Operator License.Hays Will Not Maintain License + (19:09:32, 12 December 2024)
- ML20128E983 + (19:09:34, 12 December 2024)
- ML20128E981 + (19:09:34, 12 December 2024)
- ML20128E974 + (19:09:35, 12 December 2024)
- ML20128E972 + (19:09:36, 12 December 2024)
- 0CAN038505, Forwards 1985 Exercise Scenario for Review.Exercise Will Begin on 850424 & Terminate on 850425.Schedule for pre-exercise Briefings & post-exercise Critiques Provided + (19:09:37, 12 December 2024)
- 05000271/LER-1993-002, :on 930114,discovered That TS Required Monthly Surveillance Test on Steam Jet Air Ejector Not Completed within 38 Days.Caused by Inadequate Training.Surveillance Testing Control Procedure Will Be Revised + (19:09:39, 12 December 2024)
- ML20128E966 + (19:09:40, 12 December 2024)
- ML20128E963 + (19:09:41, 12 December 2024)
- ML20128E960 + (19:09:42, 12 December 2024)
- ML20128E957 + (19:09:43, 12 December 2024)
- B14355, Forwards Draft Exercise Controllers Manual for 1993 Onsite Emergency Preparedness Exercise Scheduled for 930327.W/o Encl + (19:09:44, 12 December 2024)
- ML20128E956 + (19:09:44, 12 December 2024)
- ML20128E954 + (19:09:45, 12 December 2024)
- ML20128E953 + (19:09:46, 12 December 2024)
- ML20128E950 + (19:09:46, 12 December 2024)
- ML20128E949 + (19:09:47, 12 December 2024)
- LD-93-011, Forwards Responses to 22 Issues Re Closure of Sys 80+ Draft SER Issues + (19:09:49, 12 December 2024)
- PY-CEI-NRR-1599, Provides Notification of Completion of ERDS Implementation Program Plan for Compliance w/10CFR50,App E,Section VI Per + (19:09:50, 12 December 2024)
- ML20128E945 + (19:09:50, 12 December 2024)
- ML20128E941 + (19:09:51, 12 December 2024)
- ML20128E939 + (19:09:55, 12 December 2024)
- ML20128E940 + (19:09:55, 12 December 2024)
- ML20128E938 + (19:09:56, 12 December 2024)
- ML20128E935 + (19:09:57, 12 December 2024)
- 3F0585-15, Responds to NRC 850417 Request for Addl Info Re Util 850425 Reload Rept.Cycle 6 Thermal Hydraulic Analysis Used Lynxt, LYNX1 & LYNX2 Codes.Transient Analysis Performed W/Radar Code.Cycle 5 & 6 Thermal Hydraulic Design Parameters Encl + (19:09:58, 12 December 2024)
- 0CAN068505, Provides Addl Info on New Low Level Radwaste Storage Bldg Under Const at Facility Site.Bldg Complies W/Generic Ltr 81-38.Newspaper Articles Encl + (19:09:58, 12 December 2024)
- ML20128E931 + (19:09:59, 12 December 2024)
- RBG-21019, Responds to NRC Concerns & SER Outstanding Issue 4 Re Status of Inservice Test Program Submitted on 841105 & Supplemented on 850121.Insp of Piping Welds Submitted as Preservice Insp Program + (19:10:00, 12 December 2024)
- ML20128E930 + (19:10:00, 12 December 2024)
- ML20128E925 + (19:10:02, 12 December 2024)
- ML20128E924 + (19:10:02, 12 December 2024)
- ML20128E922 + (19:10:03, 12 December 2024)
- ML20128E921 + (19:10:04, 12 December 2024)
- ML20128E918 + (19:10:11, 12 December 2024)
- ML20128E916 + (19:10:11, 12 December 2024)
- ML20128E915 + (19:10:13, 12 December 2024)
- ML20128E914 + (19:10:13, 12 December 2024)
- ML20128E913 + (19:10:14, 12 December 2024)
- AECM-85-0148, Documents Discussions W/Nrc Re Environ Qualification of Drywell Purge & post-LOCA Vacuum Breaker Position Switches. Submits Description of Vacuum Breaker Position Switch Design,Per OL Condition 2.C.(35) + (19:10:15, 12 December 2024)
- 0CAN128402, Outlines Significant Events Leading Up to 850424 Emergency Plan Exercise.Schedule Date Is within Specified Time Interval + (19:10:15, 12 December 2024)
- ML20128E910 + (19:10:16, 12 December 2024)