Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20128K337 + (18:31:45, 12 December 2024)
- ML20128K333 + (18:31:46, 12 December 2024)
- ML20128K332 + (18:31:48, 12 December 2024)
- ML20128K331 + (18:31:51, 12 December 2024)
- 1CAN078504, Forwards Change Notice 1 to Primary Reactor Containment Integrated Leak Rate Test,Final Rept. Errors Caused by Use of Different Computer Sys for Generation of Rept + (18:31:53, 12 December 2024)
- ML20128K323 + (18:31:59, 12 December 2024)
- ML20128K322 + (18:32:01, 12 December 2024)
- ML20128K321 + (18:32:03, 12 December 2024)
- JSP-064-93, Application for Amend to License NPF-62,revising TS 6.9.1.7, Semiannual Radioactive Effluent Release Rept to Bring TS in Compliance W/Amended 10CFR50.36a Requirements Which Change Submittal Frequency of Rept to Annually + (18:32:05, 12 December 2024)
- ML20128K318 + (18:32:07, 12 December 2024)
- NG-96-1687, Advises That Current Repair & Replacement Program Will Be Used for All Activities in RFO 14 to Avoid Confusion,Since DAEC Begins Third 10-yr Insp Interval on 961101 + (18:32:08, 12 December 2024)
- ML20128K312 + (18:32:13, 12 December 2024)
- ML20128K311 + (18:32:15, 12 December 2024)
- ML20128K310 + (18:32:16, 12 December 2024)
- ML20128K309 + (18:32:17, 12 December 2024)
- ML20128K305 + (18:32:20, 12 December 2024)
- ML20128K304 + (18:32:21, 12 December 2024)
- 05000295/LER-1993-002-01, :on 931114,discovered That Various Readings for SG & Pressurizer Pressure Channel Checks Not Completed on Previous Day.Caused by Personnel Error.Rounds Completed on 930114 + (18:32:25, 12 December 2024)
- ML20128K302 + (18:32:28, 12 December 2024)
- ML20128K298 + (18:32:30, 12 December 2024)
- ML20128K297 + (18:32:32, 12 December 2024)
- ML20128K295 + (18:32:34, 12 December 2024)
- ML20128K294 + (18:32:36, 12 December 2024)
- ML20128K293 + (18:32:38, 12 December 2024)
- ML20128K292 + (18:32:40, 12 December 2024)
- ML20128K291 + (18:32:42, 12 December 2024)
- BSEP-85-1070, Responds to Violations Noted in Insp Repts 50-324/85-05 & 50-325/85-05.Corrective Actions:Surveillance Activity Turnover Guidelines Established to Ensure Improved Transition of Work Between Individuals + (18:32:44, 12 December 2024)
- ML20128K284 + (18:32:48, 12 December 2024)
- ML20128K283 + (18:32:54, 12 December 2024)
- ML20128K282 + (18:32:56, 12 December 2024)
- ML20128K281 + (18:32:57, 12 December 2024)
- ML20128K280 + (18:32:59, 12 December 2024)
- ML20128K279 + (18:33:01, 12 December 2024)
- ML20128K277 + (18:33:03, 12 December 2024)
- ML20128K276 + (18:33:04, 12 December 2024)
- ML20128K275 + (18:33:05, 12 December 2024)
- ML20128K272 + (18:33:08, 12 December 2024)
- PNO-III-85-060, on 850712,facility Shut Down for Maint on RHR Sys Train a Shutdown Cooling Injection Valve & Train B Suppression Pool Spray Valve.Valves Failed Local Leak Rate Testing.Outage Expected to Last Until 850722 + (18:33:11, 12 December 2024)
- ML20128K267 + (18:33:12, 12 December 2024)
- ML20128K266 + (18:33:14, 12 December 2024)
- ML20128K265 + (18:33:16, 12 December 2024)
- ML20128K264 + (18:33:17, 12 December 2024)
- ML20128K263 + (18:33:18, 12 December 2024)
- U-602101, Monthly Operating Rept for Jan 1993 for Clinton Power Station,Unit 1 + (18:33:20, 12 December 2024)
- ML20128K260 + (18:33:22, 12 December 2024)
- ML20128K255 + (18:33:28, 12 December 2024)
- ML20128K253 + (18:33:29, 12 December 2024)
- ML20128K251 + (18:33:31, 12 December 2024)
- ML20128K252 + (18:33:31, 12 December 2024)
- ML20128K249 + (18:33:34, 12 December 2024)
- 05000482/LER-1985-031, :on 850611,ESF Actuation Signal Initiated Due to hi-hi Water Level in Steam Generator C,Initiating Feedwater Isolation,Main Turbine Trip & Main Feedwater Pump Trip Signals + (18:33:39, 12 December 2024)