Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20128M970 + (18:07:07, 12 December 2024)
- ML20128M965 + (18:07:08, 12 December 2024)
- ML20128M968 + (18:07:08, 12 December 2024)
- ML20128M964 + (18:07:09, 12 December 2024)
- ML20128M960 + (18:07:10, 12 December 2024)
- ML20128M962 + (18:07:10, 12 December 2024)
- RBG-20934, Responds to NRC Re Violations Noted in Insp Rept 50-458/85-12.Corrective Actions:Five Calculations Not Signed Off by Reviewer Reviewed & Approved,All Seg Structural Calculations Reviewed & Requirements Reemphasized + (18:07:11, 12 December 2024)
- JSP-073-92, Submits Supplemental Info to 911022 Application for Amend to License NPF-62,clarifying SR 4.8.3.1.4, Onsite Power Distribution Sys Covering Performance of Channel Functional Test,Per Discussion W/Nrc + (18:07:12, 12 December 2024)
- ML20128M958 + (18:07:12, 12 December 2024)
- ML20128M952 + (18:07:13, 12 December 2024)
- ML20128M953 + (18:07:13, 12 December 2024)
- ML20128M951 + (18:07:14, 12 December 2024)
- ML20128M948 + (18:07:15, 12 December 2024)
- ML20128M950 + (18:07:15, 12 December 2024)
- ML20128M946 + (18:07:16, 12 December 2024)
- ML20128M947 + (18:07:16, 12 December 2024)
- ML20128M945 + (18:07:17, 12 December 2024)
- ML20128M944 + (18:07:18, 12 December 2024)
- 05000482/LER-1985-038, :on 850604,auxiliary Feedwater Actuation Signal & Steam Generator Blowdown & Sample Isolation Signal Initiated.Caused by Auxiliary Boiler Trip.Pumps Secured + (18:07:20, 12 December 2024)
- ML20128M939 + (18:07:21, 12 December 2024)
- ML20128M940 + (18:07:21, 12 December 2024)
- ML20128M937 + (18:07:22, 12 December 2024)
- ML20128M936 + (18:07:34, 12 December 2024)
- ML20128M934 + (18:07:35, 12 December 2024)
- ML20128M935 + (18:07:35, 12 December 2024)
- ML20128M933 + (18:07:36, 12 December 2024)
- 2CAN029302, Monthly Operating Rept for Jan 1993 for Arkansas Nuclear One - Unit 2 + (18:07:37, 12 December 2024)
- 2CAN058507, Forwards Response to Re post-LOCA Status of Reactor Coolant Pumps,Trip Vs No Trip,Per NUREG-0737,Item II.K.3.5 + (18:07:38, 12 December 2024)
- ML20128M930 + (18:07:38, 12 December 2024)
- RBG-38151, Monthly Operating Rept for Jan 1993 for Rbs,Unit 1 + (18:07:39, 12 December 2024)
- ML20128M924 + (18:07:40, 12 December 2024)
- ML20128M923 + (18:07:41, 12 December 2024)
- ML20128M922 + (18:07:41, 12 December 2024)
- ML20128M921 + (18:07:42, 12 December 2024)
- ML20128M920 + (18:07:42, 12 December 2024)
- ML20128M919 + (18:07:43, 12 December 2024)
- ML20128M918 + (18:07:44, 12 December 2024)
- ML20128M917 + (18:07:44, 12 December 2024)
- ML20128M916 + (18:07:48, 12 December 2024)
- ML20128M915 + (18:07:49, 12 December 2024)
- 05000309/LER-1993-002, :on 930121,control Room Ventilation Trains Declared Inoperable Due to Preventive Maint.Consequences of Event Which Will Occurred Quarterly,Minimal Since Loss of Trains Short Duration (Less than 1 H) + (18:07:51, 12 December 2024)
- ML20128M913 + (18:07:52, 12 December 2024)
- ML20128M909 + (18:07:53, 12 December 2024)
- ML20128M911 + (18:07:53, 12 December 2024)
- ML20128M908 + (18:07:54, 12 December 2024)
- ML20128M905 + (18:07:55, 12 December 2024)
- ML20128M907 + (18:07:55, 12 December 2024)
- ML20128M903 + (18:07:56, 12 December 2024)
- LIC-93-0019, Responds to NRC Re Violations Noted in Insp Rept 50-285/92-33 on 921122-930102.Corrective Actions:P&Ids Will Be Revised to Indicate Required (Closed) Position for SG Blowdown Processing Sys Interface Valves + (18:07:57, 12 December 2024)
- ML20128M899 + (18:07:58, 12 December 2024)
- ML20128M896 + (18:07:59, 12 December 2024)