Commonwealth Edison C.
Byron Nuclean Station t
G 4450 North German Church Road
+
Byron, tilinois 61010 1
rebruary 11, 1993 1
LTR4 BYRON 93-0087 FILE:
2.7.200 Director, Office of Management Information and Program Control United States Nuclear Regulatory Commission Washington, D.C.
20555 5
ATTN:
Document Con _rol Desk a
Gentlemen:
Enclosed for your information is the Monthly Performance Report covering Byron Nuclear Power Station for the period January 1 through January 31, 1993.
Sincerely, ll. [/, [fiL
,O t-y%
G.
K.
Schwartz Station Manager Dyron Nuclear Power Station RP/RC/cf cc:
A.B.
Davis, NRC, Region III NRC Resident Inspector Byron Ill. Dept. of Nuclear Safety M.
J. Wallace/E.
- b. Eenigenburg Nuclear Licensing Manager Nuclear Fuel Services, I%.R Plant Suppor t D.
R. Eggett, Station Nuclear Engineerjng INPO Rccords Center J. B. Hickman USNRC F.
Yost - Utility Data Institute, Inc.
)
9302220407 930131
~
{k PDR ADDCK 05000454 R
P:DR
-a:;: -, -
~
f
( t -?
- ^
gi
^
.. y. ;,'
=
+. __
,-1.-
Y
,4 BYRON NUCLEAR POWER-STATION:
UNIT 1 AND UNIT 2:
ry7 MONTHLY PERFORMANCE REPORT cot 040NWEALTH EDISON COMPANY-NRC DOCKET NO. 050-454
.NRC DOCKET NO. 050-455 LICENSC NO. NPF-37 LICENSE NO. NPF-66 P
h (3927M/VS/020993/1)'
?.h;* '
~
^
w.m.......
. s.
+
~
i.".
. 4
.1.
7 I.
Montitly_29PDrt for Byron UNIT _1 for tbs _ month ol_ January 1993
.3
- 1 i,
Sum ary__of Operatino~Exp3rience-for Unit'-l-
,t i.
The Unit l began;this reporting period in. Mode 1 (Power Operations)._:?The -
power 2evel varied due-to.-load.-following requirements.
t +
9
)
6 9
l
. e l."
, )
j; (3927M/VS/020993/2)..
i --
i :-
',1 x
e; r
+
+-.
' L_.Di'IRATIllGJATA_RIEORT
_ 050-454'
-DOCKET NO.'s -
-UNITt -Byron One DATE:
02/11/93 COMPILED BY:
R. Colglazier-
- TELEPHONE: -(815)234'5441 x2262 OPERJ. TING STATUS -
l 1.
Reporting Period:
January, 1993.
Gross Hours:
744~
2.
Currently Authorized Power Level: 3411 (MWt)
.MWe-gross)
Design Electrical Rating: 1175
(
Design Electrical Rating: 1120 (MWa-net)
Max Dependable Capacitys 1105 (MWe-net) 3.
Power Level to Which Restricted (If Any): None
-]
4.
Reasons for Restriction (If Any): N/A
-l THIS MONTH YR TO DATE CUMULATIVE
- 5.
Report Period Hrs.
744-744 64,681-6.
Hx Critical Hours 744.
~ 744
-54,402.3 7.
Rx Reserve Shutdown Hours 0
0.
38.
B.
Hours Generator on Line 744 744 53,771 9.
Unit Heserve Shutdown Hours 0
0 0
a C10. Gross Thermal Energy (MWH) 2,382,891 23,828,891-162,839,182
- 11. Gross Elec. Energy (MWH) 802,121 8(2,121 54,903,709L
- 12. Net Elec. Energy (MWH) 779,558 719,558 51,985,424
- 13. Reactor Service Factor 100 100 84.11
- 14. Reactor Availability Fector 100
-100
-84'.17
- 15. Unit Service Factor 100 100
-82.94
- 16. Unit Availability Factor
.100 100
-83.13'
- 17. Uilt. Capacity Factor (MDC net) 94.82 94.82 72.73 18._ Unit Capacity Factor (DER net) 93.55 93.55 71.76 14 Unit Forced Outage Hrs.
0-O.
1,403.4
- 20. Unit Forced Outage Rate
,' O.
O.
2.54' 4
4
- 21. Shutdovns Scheduled Over Next 6 Months:
Refueling Outagn DIR05 2/5/93
- 22. If Shutdown at End of Report Period, Estinnated Date of Startup:
4/10/93
- 23. Units in Test Status (Prior to.Commercini Operation): None O Note - The cumulative numbers do not reflect power generated prior to commercial service.
'1 (3927M/VS/020993/3)-
. _ u p,..
- v. u.
.a
.a
--wu..
a r i
m 4
w 1
~
^
- C.
AVERAGE DAILY UNIT POWER LKEEL.
10501454' DOCKET NO s.
-UNIT --cByron One
~
'DATE:
02/11/93 COMPILED BY:-* R.:Colglasler TELEPHONEJ- (815)234-5441L x2282 MONT118 - January, 1993 s,
lm DAY AVERAGE DAILY POWER LEVEL (MWe-Net)
.?
1.
785 MW 16.-
1101_MW'-
2.
780 MW 17.
-1111 MW
~
3.
.4.
1077j}{H 19.
11D_4 MW 5.
1111 MW 20, 1091 MW1 6.
1111 MW
-21.
1075'MW I.
7.
113 0 Mit 22, 1069-MW 8,
1110 MW 23.
-1045 MW-9.
1103 MW
- 24. _
1046 MW--
5 10.
1105 MW 25.
1041 MW 11.
11Q4 MW 26.
1021 MW 12.
1102 MW 27.
1Q16 MW' 13.
110H_lDf 28.
1007 MW s
14.
1111 MW 2 9..
1000 MW
^
-15.
1107 MW 30.
982-MW i
31.
.26.2 MW-INSTRUCTIONS p
On this form list the average daily unit power let'el in MWe-Net for each day.
in the reporting month._ Compute to the nearest whole megawatt. _ These': figures will be used to plot a-graph for each reporting month. Note that when maximum =
~
dependable capacity is used'for the net electrical rating of the unit there may be occasions when-the daily average power level exceeds the-100%Eline
- (or-the restricted power level li m.)
In such casos t.he average daily! unit power output sheet. should be-footnoted = to explain the apparent-anomaly.--
M (3927M/VS/020993/4):
y 1(
y,--
yv J.'
3...
. s
Report Period January, 1993 UNIT' SHUTDOWNS / REDUCTIONS BYRON (UNIT 1)
Iygg_hoursReasonMethod LER' Number System Component Cause & Corrective Action to Prevent Recurrence No.
., Date
.1 1/19/93 S
H 9
Unit began its Coastdown to BIR05 Unit began its Coastdown:to BIR05:
Summary IIEE Reason Bethod System &' component F-Forced A-Equip Failure F-Admin-1-Manual Exhibit F.& H S-Sched.
'B-Maint or Test G-Oper Error 2-Manual Scram Instructiocs for C-Refue'. ng H-Other' 3-Auto Scram Preparation of D-Regulatory Restriction,'
4-Continued Data, Entry Sheet E-Operator Training 5-Reduced' Load Licensee Event Report
&' License Examination 9-Othe r (LER). File (NUREG-0161) c :-
~
tM
.(3927M/VS/020993/5) 4 d
M W
V f
f 1
1
,+
. e.,
.~
t.
+;
, i.
i E[_1310UE_REEORIIELEIOUIREMEUIS_IUNIT1) for the month of_JAnunty j i l.
Safety / Relief valve operations for Unit-One.-.
21 VALVES-NO & TYPE
-PLANT-DESCRIPTION DATE
', ACTUATED-ACTUAllON CONDITION :
OF EVENT F
None.
1
~
2.
Licensee generated changes to ODCM.
3.
Indications of failed fuel.;
Fuel Reliability Indicator:-
Yes FRI:
5.9E-4 pC1/cc-4.
10CFR50.46 Reporting _Requirementst -Peak Clad tamperature (PCT) changes resulting Irom change or-errors to.the ECCS evaluation model.
Cur rent.lleensing basis PCT plus. margin allocation ~ (*F)
IarJgte_. Ate.ak_LOCA EmalLALeak._LOCA -
~
2051.3 1681.6 Explain differences from previous report:
The small break LOCA value changed to account for incorrect' safety injection data for the centrifugal. charging. pump-(166.5')'and uncertal'nty of the pressurizer pressure initial' condition.during EGC operation'(5')
per December ::2, 1992 letter from Marcia_ A. Jackson to,Dr. Thomas'E.
Murley.
.. ( 3927M/VS / 020993 / 6 )
u zm, t
._. f
.1 i LICIHSIE_,IYENT REPORTS (UNIT 1)
The following is a-tabular summary _of all Licensee F, vent Reports for-l-
= Byron Nuclear Power. Station, Unit One, -submitted during _ the reporting ' period,:
January 1, 1993'through January 31, 1993.'_This'information is provided pursuant to the reportable. occurrence reporting requirements'as' set forth in 10CFR 50,73.':
Occurrence-LisRAGER_EYEAOCport Number Data '
Title _QLRcrurrence NONE i-I t
l l
r l
l1 (3927M/VS/020993/7) l-
., y-II. Koni.hlyJepart lar_JyysrLUBIT 2 for_ the_ month olhunIy_l123
- A.
f*ummary_0LSPflatingDDRflance - for' Unit 2 The Unit began this>r porting period =in Mode:1 (Power Operations).-
The power 1evel varied'due to load following requirements.
k f
(3927M/VS/020993/8)
$g y
v-F-
1 4
Da_DEIRAIDIG_ RATA REPORI
-DOCKET NO, 3 -050-455.-
UNIT: Dyron Two DATE : 02/11/93 COMPILED BY:
R.-Colglazier TELEPHONES- (815)234-5441 x2282' OPERATING-STATUS 1.
~ Reporting Period: January, 1993.
GrossLHours: 744 2.
Currently Authorized Power Level 3411-(MWt)
Design Electrical Rating: 1175 -(MWe-gross)
Design Elsetrical Rating: 1120 (MWe-not)
Max Dependable Capacity -3105 (MWe-aet)--
3.
Power Level to Which Restricted (If Any):
N/A-4.
Reasons for Hestriction (If Any):
THIS MONTH YR TO DATE.
CUMULATIVE
- 5.
Report Period Hrs.
744 744 47,785 6.
Rx Critical Hours 744 744 41,079.6 7.
Rx Reserve ~ Shutdown Hours 0
01 0
8.
Hours Generator on Line 744 744-40,549.3' 9.
Unit Reserve Shutdown Hours 0
0 0'
- 10. Gross Thermal Energy (MWH) 2,377,986 2,377,986 115,128,443.
- 11. Gross Elec. Energy (MWH) 815,162 815,162 39 031,100-
- 12. Net Elet. Energy (MWH) 792,307 792,307 36,953,v66
- 13. Reactor Service Factor 100 100 85.97
- 14. Reactor Availability Factor 100 100 35.97
- 15. Unit Service Factor 100 100'
'84.86-
- 16. Unit Availability Factor 100 100
'84.86
- 17. Unit. Capacity Factor (MDC. net) 96.37 96.37 69.98
- 18. Unit Capacity Factor (DZR net) 95.08 95.08 69.05
- 19. Unit Forced Outage Hrs.
0 0
1244
- 20. Unit Forced Outage-Rate 0
'O
- 2.98
- 21. Shutdowns Scheduled Over Next 6 Months:
1 82R04 n08/28/93
- 22. If Shutdown at Ead~of Report Period, Estimated Date of Startup: NONE
- 23. Units in Test Status (Prior to Commercial Operation): None R
- Note - The cumulative numbars do not reflect power j
generated pticr to commercial service.
l' I.
_(3927M/VS/020993/9)
. g
~
,..xn..
'i' m
',.. _C2_ RERAGE_DAILLUNIX.20fER_.LTJEU -
- DOCKET NO.
- 050-455<
UNIT -- Byron-Toro DATES- 02/11/93-COMPILED.bl. :R.'Colglazier-TELEPHONE:-.(815)234-54411 f
x2202L MONTH: January, 1993 s r DA7' AVEFAG51 DAILY POWER LEVEL
'(MWe-Net) 1.
1052 MW 16.
_1007..MW 2.
.. 10Sl_NW 17.
-1105 MW 3,
1015 MW 18.
1124 MW 4.
1055_MW 19.
112B_MW 5,
1000 W
- 20..
1128 MW.
6, 835 MN
- 21. -
1;?(_NW 7,
1071 MW 22.
1114 MW-8.
1135 MW 23.
1033 MW~
1128 MW 2 4. -.
991 MW-9.
10, 1117 MN 25, 1125.MW 11.
312fLNW 26.
1111 MW f
12. _ _._
112d MW 2'7.
1101 MW 13.
1127 MW 28.
1039 MW 3.1 14.
1132 MW 29.
1126 MW-15.
112R_MW 30.
1121:MW 31.
575 MW INSTRUCTIONS On this form list the average daily unit power level in HWc-Net for each day.
in the reporting month.- ' Compute to the nearest whole megawatt. These figures.
will be used to plot a graph for each reporting month.
Note that.when maximum dependable-capacity is used for the net electrical rating of the unit-;there may be occasions when the daily average power level exceeds the 100% line; (or the restricted power level line.)
In such cases.the average daily unit power out.put sheet should be footnoted to explain the. appcrent anomaly.
a
- )
(3927M/VS/020993/10)
.K
' u.
i,.
4
~.
t Report Period Jannary, 1993 UNIT SHUTDOWNS / REDUCTIONS BYRON (UNIT 2) a
_No _
D C 'Iygg Hours. Reason Method LER Number SyEleJ Cc:r gonent Cause & Corrective Action to Prevent Recurrence' l'
01/30/93 A
5 FW Pump Reduced load to repair leak on 2FWO90D.
Sumary. *
-eeee***********.
TYPE _
_ Eggspn Method S stem & Compg int i
F-Forced A-Eguip Failure F-Admin 1-14anual Exhibit F & H
.S-Sched-B-Maint.or Test' G-Oper Error 2-Manual Scram Instructions for C-Refueling H-Other 3-Auto Geram Preparation of D-Regulatory Restriction 4-Continued Data' Entry Sheet E-Operator Training 5-Reduced Load Licer
+ Event' Report
& License E. amination 9-Other
( LER'; - ile (hTJREG-0161) '
-(3927M/VS/020993/11)
~
-_= :
=_
.m.,
W.*\\
.: A
- Ex._.3fil10VLEEf0RIING_REOUIRE14ENTS l(UNIT 2)i. fat _the montlLQLdanu y.-1993 1.1 Safety / Relief. valve' operations.for Unit-Two.-
VALVES NO & TYPE'
'PLANTc DESCRIPTION s
DATE ACTUATED ACTUAT101{ -
COND1TIQti' OF EVFti2; None 2.
Licensee generated changes to ODCH.
c 3.
Indications of failed fuel.
Ho.
Fuel Reliabillty Indicator FRI = 7.BE-5 pCl'!C 4.
10CFR50.46 Reporting R'equirements: ' Peak Clad temperature (PCT) changes:
resulting from changes or errors-to the ECCS evaluations model..
Current lit.ensing basic PCT plus major allocations -('F)-
i Large_ Break LOCA Sjnall Break LOCA 2064.1 1681.6 Explain differences from previous toport:
Tne small-break LOCA value changed to account for.: incorrect safety Injection =
data for~the centrifugal charging pump (166.5') and uncertainty of the pressurizor pressure initial condition during EGC operation'(5') per December; 22, 1992 letter from Marcia~A. Jackson to Dr. Thomas E. Murley.
k b
(3927M/VS/020993/12)
- a. :.
s~..-.
r
+
,t s
a
~
- E, LICENSEE EVENT' REP _QRTS (UNIT.21 The.f2110 wing: 1s a-tabular summary of'all Licensee Event Reportsefor--
Dyron Nuclear Power Station,' Unit Two,-submitted during the.-reporting ~ period,
-January'1, 1993 through:_ January,314f1993. This information is provided pursuanti to the_ reportable occurrence reporting' requirements an-set forth in 10CTR-50.73.
L.i.C. RAG 29_1YRRt lePDIA lhil!!h21 QCcurrenCD DA.te1
'T1t1e o CQccurrenCA,:
None l
d' 4
e s
+
d 1
.~
(3927H/VS/020993/13)-
2
,