Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20129F153 + (16:28:36, 12 December 2024)
- ML20129F150 + (16:28:37, 12 December 2024)
- ML20129F147 + (16:28:38, 12 December 2024)
- ML20129F142 + (16:28:39, 12 December 2024)
- ML20129F146 + (16:28:39, 12 December 2024)
- ML20129F141 + (16:28:40, 12 December 2024)
- ML20129F139 + (16:28:41, 12 December 2024)
- ML20129F138 + (16:28:48, 12 December 2024)
- ML20129F137 + (16:28:49, 12 December 2024)
- ML20129F134 + (16:28:50, 12 December 2024)
- ML20129F132 + (16:28:50, 12 December 2024)
- ML20129F130 + (16:28:51, 12 December 2024)
- ML20129F129 + (16:28:52, 12 December 2024)
- 05000352/LER-1985-022, :on 841129,during Fire Damper Insp,Two Reactor Enclosure Fire Penetrations Discovered Unsealed.Caused by Failure to Reinstall Seal After Const Activities.Fire Watch Established.Conduit Penetration Seals Replaced + (16:28:54, 12 December 2024)
- 05000388/LER-1985-016-01, :on 850427,water Hammer Caused Reactor Water Level Transient.Caused by Rapid Filling of Partially Drained RHR Piping from Reactor Vessel.Operating Procedure for RHR Being Revised + (16:28:56, 12 December 2024)
- U-602643, Forwards Revised Special Assessment:Confirmatory Action Ltr Dtd 960911, Involving 960905-06 Reactor Recirculation Pump Seal Failure & Associated Shutdown at Plant + (16:28:57, 12 December 2024)
- BVY-96-111, Documents Info Provided During Re License Change Requested That We Revise P. 278 Reference to Include Word Legible in Section 6.13.A.3 + (16:28:59, 12 December 2024)
- ML20129F116 + (16:28:59, 12 December 2024)
- 05000249/LER-1985-011, :on 850416,high Radiation Signal from Refueling Floor Radiation Monitors Caused Reactor Bldg Ventilation Sys Trip & Isolation W/Standby Gas Treatment Sys B Automatically Starting + (16:29:01, 12 December 2024)
- ML20129F113 + (16:29:02, 12 December 2024)
- ML20129F112 + (16:29:03, 12 December 2024)
- PNO-IV-96-053, on 961003,personnel at Refinery Attempted to Disconnect Source Guide Tube Following Exposure. Investigation Was Conducted & State of Ok Was Informed + (16:29:03, 12 December 2024)
- ML20129F109 + (16:29:04, 12 December 2024)
- ML20129F107 + (16:29:05, 12 December 2024)
- DCL-85-222, Forwards Public Version of Revised Emergency Plan Implementing Procedures,Including Rev 7 to EP G-2 Re Onsite Emergency Organization & EP G-251 Re Notification of Onsite Emergency organization.W/850708 Release Memo + (16:29:06, 12 December 2024)
- ML20129F103 + (16:29:07, 12 December 2024)
- ML20129F098 + (16:29:11, 12 December 2024)
- ML20129F099 + (16:29:11, 12 December 2024)
- ML20129F097 + (16:29:12, 12 December 2024)
- ML20129F096 + (16:29:13, 12 December 2024)
- ML20129F095 + (16:29:14, 12 December 2024)
- RBG-21454, Forwards Revised Drywell Break Base Case Analysis. Peak Containment Pressure Calculated for Revised CLASIX-3 Drywell Break Analysis During Hydrogen Release Was 12.7 Psig & Occurred in Wetwell Vol + (16:29:15, 12 December 2024)
- ML20129F090 + (16:29:16, 12 December 2024)
- ML20129F089 + (16:29:17, 12 December 2024)
- ML20129F086 + (16:29:18, 12 December 2024)
- ML20129F078 + (16:29:19, 12 December 2024)
- ML20129F077 + (16:29:20, 12 December 2024)
- ML20129F076 + (16:29:21, 12 December 2024)
- ML20129F074 + (16:29:22, 12 December 2024)
- ST-HL-AE-1257, First Interim Deficiency Rept Re Pipe Support eye-rod Interferences.Initially Reported on 850425.Installation Spec Changed & eye-rod Repair Initiated.Next Rept Will Be Submitted by 850816 + (16:29:23, 12 December 2024)
- NRC-96-0085, Proposed Tech Specs 3/4.8.4 Re Electrical Equipment Protective Devices + (16:29:24, 12 December 2024)
- ML20129F065 + (16:29:26, 12 December 2024)
- ML20129F068 + (16:29:26, 12 December 2024)
- 05000334/LER-1985-010, :on 850506,reactor Tripped Due to lo-lo Level in Steam Generator B.Caused by Combination of Inadequate Communication Between Reactor & Turbine Operators.Event Discussed W/Appropriate Personnel + (16:29:29, 12 December 2024)
- ML20129F063 + (16:29:30, 12 December 2024)
- ML20129F061 + (16:29:31, 12 December 2024)
- ML20129F059 + (16:29:32, 12 December 2024)
- BVY-96-107, Responds to NRC Re Violations Noted in Insp Rept 50-271/96-07.Corrective Actions:Completed Addl Training of Design Engineering Staff,Completed Review of Current Design Change & Performed Engineering Evaluation + (16:29:33, 12 December 2024)
- ML20129F055 + (16:29:34, 12 December 2024)
- ML20129F054 + (16:29:35, 12 December 2024)
- ML20129F052 + (16:29:36, 12 December 2024)