Mr. Patrick M. Donnelly, Plant Manager Big Rock Point Plant October 2, 1996 Consumer.s Power Company l
10269 U.S. 31 North Charlevoix, MI 49720
SUBJECT:
ACKNOWLEDGEMENT OF THE INITIAL PRESSURE REGULATOR BELLOWS REPLACEMENT LETTER
Dear Mr.'Donnelly,
17, 1996, 'n which you informed We have reviewed your letter dated September i
the Commission of the replacement of the initial pressure regulator (IPR) bellows.
Specif ~ ally, an IPR bellows with one operating cycle (about 12 months) will be installed in lieu of a new bellows.
In addition, you stated that the recently installed bellows will be used until the 1997 refueling outage, and continued use beyond that will require additional review based on the root-cause evaluation results.
The staff concludes that replacement of the IPR bellows with one operating cycle is acceptable for operation until the 1997 refueling outage.
With regards to the continued use of the recently replaced bellows beyond the 1997 refueling outage, additional justification needs to be provided to the staff for review.
This is consistent with your letter of November 17, 1993, in which you committed to replace the bellows every refueling outage with a new, certified, radiographed bellows.
If you have any questions regarding this matter, please do not hesitate to contact me at (301) 415-1361.
Sincerely, Original signed by:
Linh N. Tran, Project Manager Project Directorate 111-1 Division of Reactor Projects - III/IV Office of Nuclear Reactor Regulation Docket No.
50-155 cc:
See next page Distribution:
Docket file, EI'i feg, MiB RLE CENIB CSPY RLeemon - BRP SRI, WKropp - Region III Drg DOCUMENT NAME: G:\\WPDOCS\\BIGROCK\\BRPIRP.LTR To receive a copy of this document, indicate in the box:
"C" - Copy without l
attachment / enclosure "E" = Copy with attachment /enclospre "N"_= No copy l
OFFICE LA:PD31 i
E PM:PD31 E
D:PD31 f/
- p$ 1 C e
}
D l
NAME CJamerson Q/
LTran: rf JHannon V DTereY l
DATE 9 /f 7/96
//
ct / 30/96
//// / /96 v
0FFICIAL RECORD'COPT 9610040063 961002 PDR ADOCK 05000155 P
l Mr. Patrick M. Donnelly, Plant Manager Big Rock Point Nuclear Plant cc:
Mr. Thomas A. McNish Michigan Department of Attorney Vice President & Secretary General Consumers Power Company Special Litigation Division 212 West Michigan Avenue 630 Law Building Jackson, Michigan 49201 P.O. Box 30212 Lansing, Michigan 48909 Judd L. Bacon, Esquire Consumers Power Company 212 West Michigan Avenue Jackson, Michigan 49201 Jane E. Brannon, County Clerk County Building Annex 203 Antrim Street Charlevoix, Michigan 49720 Offica of the Governor Room 1 - Capitol Building Lansing, Michigan 48913 Regional Administrator, Region III U.S. Nuclear Regulatory Commission 801 Warrenville Road Lisle, Illinois 60532-4351 Drinking Water and Radiological Protection Division Michigan Department of Environmental Quality 3423 N. Martin Luther King Jr Blvd P. O. Box 30630 CPH Mailroom Lansing, Michigan 48909-8130 U.S. Nuclear Regulatory Commission Resident Inspector's Office Big Rock Point Plant 10253 U.S. 31 North Charlevoix, Michigan 49720 Mr. Robert A. Fenech Vice President-Nuclear Operations i
Palisades Plant 27780 Blue Star Memorial Hwy.
Covert, Michigan 49043 June 1996