Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- TAC:56475 + (15:13:36, 12 December 2024)
- ML20132C402 + (15:13:36, 12 December 2024)
- ML20132C399 + (15:13:37, 12 December 2024)
- ML20132C398 + (15:13:38, 12 December 2024)
- B11731, Forwards Addl Info Re Draft Tech Specs,Per 850906 Meeting. Encls Include Responses to Specific Tech Spec & SER Items + (15:13:39, 12 December 2024)
- ML20132C394 + (15:13:39, 12 December 2024)
- ML20132C393 + (15:13:40, 12 December 2024)
- ML20132C389 + (15:13:41, 12 December 2024)
- ML20132C390 + (15:13:41, 12 December 2024)
- 3F1296-03, Monthly Operating Rept for Nov 1996 for Crystal River Unit 3 + (15:13:42, 12 December 2024)
- ML20132C386 + (15:13:43, 12 December 2024)
- ML20132C387 + (15:13:43, 12 December 2024)
- ML20132C385 + (15:13:44, 12 December 2024)
- ML20132C383 + (15:13:45, 12 December 2024)
- ML20132C384 + (15:13:45, 12 December 2024)
- IR 05000619/2007005 + (15:13:46, 12 December 2024)
- ML20132C379 + (15:13:47, 12 December 2024)
- RBG-21-605, Discusses Editorial Clarifications to Physical Security Plan Re Use of Nuclear Security Officer Instead of Security Officer.Use of Security Officer Concurs w/10CFR73 & in No Way Decreases Response Force Capability + (15:13:47, 12 December 2024)
- ML20132C377 + (15:13:48, 12 December 2024)
- ML20132C376 + (15:13:49, 12 December 2024)
- ML20132C375 + (15:13:49, 12 December 2024)
- ML20132C374 + (15:13:50, 12 December 2024)
- ML20132C373 + (15:13:50, 12 December 2024)
- RBG-22-126, Forwards Response to Sser 3,Section 13.5.2.3 & Addl Info Requested During 850912 Meeting Re Containment Venting. Containment Venting Path Meets BWR Emergency Procedure Guidelines + (15:13:51, 12 December 2024)
- ML20132C370 + (15:13:52, 12 December 2024)
- ML20132C369 + (15:13:54, 12 December 2024)
- ML20132C368 + (15:13:55, 12 December 2024)
- B11728, Forwards Revised Response to SER Open Items 2.2 Re Diesel Generator Load Acceptance Test After Operation at No Load, Per 850905,10 & 12 Requests + (15:13:56, 12 December 2024)
- ML20132C365 + (15:13:56, 12 December 2024)
- ML20132C363 + (15:13:57, 12 December 2024)
- ML20132C364 + (15:13:57, 12 December 2024)
- ML20132C362 + (15:13:58, 12 December 2024)
- ML20132C359 + (15:13:59, 12 December 2024)
- ML20132C361 + (15:13:59, 12 December 2024)
- RBG-21-496, Interim Deficiency Rept DR-306 Re Nf Anchor Bolt Nuts Supplied by Itt Phillips & Mfg by United Screw.Investigation Incomplete.Next Rept Will Be Submitted by 850719 + (15:14:00, 12 December 2024)
- 05000263/LER-1985-011, :on 850624,EFT Sys Transferred to Toxic Chemical Emergency Mode as Result of Failed Sample Pump in Hydrogen Sulfide Monitor & Failed Optics Lamp in Chlorine Monitor.Sample Pump & Lamp Replaced + (15:14:02, 12 December 2024)
- PNO-III-85-085, on 850921,unidentified,apparently Intoxicated Man Called in Bomb Threat to Util Ofc.Plant Officials & Security Notified.No Bomb Found + (15:14:03, 12 December 2024)
- ML20132C351 + (15:14:03, 12 December 2024)
- ML20132C350 + (15:14:04, 12 December 2024)
- ML20132C349 + (15:14:05, 12 December 2024)
- ML20132C348 + (15:14:05, 12 December 2024)
- ML20132C347 + (15:14:06, 12 December 2024)
- ML20132C345 + (15:14:07, 12 December 2024)
- ML20132C346 + (15:14:07, 12 December 2024)
- ML20132C344 + (15:14:08, 12 December 2024)
- ML20132C341 + (15:14:09, 12 December 2024)
- IR 05000133/1985002 + (15:14:10, 12 December 2024)
- 05000266/LER-1996-010, :on 961112,EDG Governor Failure Was Noted. Caused by Dislodging of Spring Clip in Synchronizer Indicator Assembly.Spring Clip Was Replaced W/Spare & EDG & Governor Were Tested,Per RMP-110B & TS-81 + (15:14:12, 12 December 2024)
- ML20132C338 + (15:14:13, 12 December 2024)
- ML20132C334 + (15:14:14, 12 December 2024)
- ML20132C333 + (15:14:16, 12 December 2024)