Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20132G121 + (14:30:40, 12 December 2024)
- ML20132G116 + (14:30:41, 12 December 2024)
- ML20132G118 + (14:30:41, 12 December 2024)
- ML20132G114 + (14:30:42, 12 December 2024)
- ML20132G110 + (14:30:43, 12 December 2024)
- U-600222, Final Deficiency Rept 55-85-03 Re Firewalls Constructed w/8-inch Hollow Core Concrete Masonry Units That May Not Meet 3 H Fire Resistance Rating.Initially Reported on 850404.Item Not Reportable Per 10CFR50.55(e) + (14:30:46, 12 December 2024)
- ML20132G104 + (14:30:47, 12 December 2024)
- ML20132G097 + (14:30:48, 12 December 2024)
- ML20132G095 + (14:30:49, 12 December 2024)
- PY-CEI-NRR-0349, Responds to 850529 Comments Re Proposed Resolution of TMI Action Plan Item III.D.1.1.Reactor Water Cleanup Sys Provided W/Connections to post-accident Sampling Sys for Monitoring Cleanup Operations + (14:30:50, 12 December 2024)
- ML20132G092 + (14:30:50, 12 December 2024)
- ML20132G091 + (14:30:51, 12 December 2024)
- ML20132G088 + (14:30:52, 12 December 2024)
- ML20132G086 + (14:30:52, 12 December 2024)
- ML20132G080 + (14:30:53, 12 December 2024)
- ST-HL-AE-1353, Forwards Miller & Lents 820831 Rept, Assessment of Potential Likelihood of Economically Producible Hydrocarbons Located Beneath South Texas Project Site & Main Cooling Reservoir Documents,Including Test Repts + (14:30:54, 12 December 2024)
- ML20132G077 + (14:30:55, 12 December 2024)
- ML20132G076 + (14:30:58, 12 December 2024)
- ML20132G073 + (14:30:58, 12 December 2024)
- 05000416/LER-1996-006-03, :on 961127,manual Reactor Scram Occurred Due to Loss of CRD Pump.Faulty Transmitter Was Replaced & Calibration Performed in Accordance with 07-S-53-P11-6,CST Level Calibration + (14:31:00, 12 December 2024)
- ML20132G067 + (14:31:01, 12 December 2024)
- U-600185, Interim Deficiency Rept 55-85-03 Re Firewall Structures Fabricated Using Unqualified Matl.Approx 30 Addl Days Necessary to Complete Testing of Concrete Masonry Units + (14:31:02, 12 December 2024)
- ML20132G063 + (14:31:03, 12 December 2024)
- IR 05000267/1996005 + (14:31:04, 12 December 2024)
- ML20132G060 + (14:31:06, 12 December 2024)
- ML20132G059 + (14:31:08, 12 December 2024)
- ML20132G055 + (14:31:12, 12 December 2024)
- ML20132G053 + (14:31:14, 12 December 2024)
- ML20132G052 + (14:31:14, 12 December 2024)
- ML20132G049 + (14:31:15, 12 December 2024)
- ML20132G051 + (14:31:15, 12 December 2024)
- IR 05000382/1984020 + (14:31:39, 12 December 2024)
- ML20132G044 + (14:31:40, 12 December 2024)
- ML20132G042 + (14:31:41, 12 December 2024)
- ML20132G040 + (14:31:42, 12 December 2024)
- ML20132G039 + (14:31:42, 12 December 2024)
- ML20132G037 + (14:31:44, 12 December 2024)
- ML20132G033 + (14:31:45, 12 December 2024)
- ML20132G034 + (14:31:45, 12 December 2024)
- ML20132G031 + (14:31:46, 12 December 2024)
- ML20132G027 + (14:31:47, 12 December 2024)
- ML20132G022 + (14:31:48, 12 December 2024)
- ML20132G020 + (14:31:49, 12 December 2024)
- 05000348/LER-1996-004, :on 960620,SR Not Met for Manual SI Input Into RT Sys.Cause of Missed Surveillance Was Cognitive Personnel Error & Failure to Ensure Surveillance Test Procedure. Revised Procedures + (14:31:52, 12 December 2024)
- ML20132G015 + (14:31:53, 12 December 2024)
- ML20132G014 + (14:31:54, 12 December 2024)
- 05000423/LER-1996-007-02, Forwards LER 96-007-02 Which Supplements Rept Submitted on 960502,per 10CFR50.73(a)(2)(ii)(B),10CFR50.73(a)(2)(v)(B&D), 10CFR50.73(a)(2)(vii)(B&D).Commitments in Response to Event, Encl + (14:31:58, 12 December 2024)
- ML20132G011 + (14:32:00, 12 December 2024)
- ML20132G010 + (14:32:01, 12 December 2024)
- ML20132G008 + (14:32:05, 12 December 2024)
- ML20132G004 + (14:32:06, 12 December 2024)