Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20133A464 + (14:16:05, 12 December 2024)
- ML20133A463 + (14:16:06, 12 December 2024)
- 05000327/LER-1985-036-01, :on 850825,26,28 & 0913,hourly Fire Watch Not Performed within 1 H.Caused by Improper Shift Relief or Inaccessibility to Areas.Fire Watches Reestablished as Soon as Practical + (14:16:08, 12 December 2024)
- ML20133A458 + (14:16:09, 12 December 2024)
- ML20133A459 + (14:16:09, 12 December 2024)
- ML20133A449 + (14:16:11, 12 December 2024)
- ML20133A448 + (14:16:11, 12 December 2024)
- ML20133A447 + (14:16:12, 12 December 2024)
- ML20133A445 + (14:16:13, 12 December 2024)
- ML20133A441 + (14:16:15, 12 December 2024)
- ML20133A440 + (14:16:16, 12 December 2024)
- ML20133A436 + (14:16:16, 12 December 2024)
- ML20133A435 + (14:16:17, 12 December 2024)
- ML20133A434 + (14:16:18, 12 December 2024)
- 05000361/LER-1985-044, :on 850910,Train a Containment Purge Isolation Sys Spuriously Actuated Due to Electrical Noise Spike on Containment Area Radiation Monitor.Investigation Underway. Containment Purge Isolation Sys Reset + (14:16:20, 12 December 2024)
- ML20133A429 + (14:16:21, 12 December 2024)
- ML20133A428 + (14:16:21, 12 December 2024)
- ML20133A427 + (14:16:22, 12 December 2024)
- ML20133A425 + (14:16:23, 12 December 2024)
- ML20133A423 + (14:16:24, 12 December 2024)
- ML20133A421 + (14:16:25, 12 December 2024)
- ML20133A419 + (14:16:25, 12 December 2024)
- 05000293/LER-1985-023, :on 850827,HPCI Turbine Control Valve Failed to Operate Properly.Caused by Leaking Nipple Due to Personnel Inadvertently Stepping on Oil Supply Line to HPCI Hydraulic Control Valve.Nipple Repaired + (14:16:27, 12 December 2024)
- 05000293/LER-1985-024, :on 850602,surveillance Test of Station 250-volt Batteries Missed.Caused by Procedural Deficiency. Procedure Revised & Batteries Retested + (14:16:30, 12 December 2024)
- ML20133A414 + (14:16:31, 12 December 2024)
- ML20133A413 + (14:16:33, 12 December 2024)
- ML20133A412 + (14:16:35, 12 December 2024)
- ML20133A410 + (14:16:36, 12 December 2024)
- ML20133A407 + (14:16:37, 12 December 2024)
- ML20133A405 + (14:16:38, 12 December 2024)
- ML20133A403 + (14:16:39, 12 December 2024)
- ML20133A401 + (14:16:40, 12 December 2024)
- ML20133A402 + (14:16:40, 12 December 2024)
- ML20133A399 + (14:16:41, 12 December 2024)
- ML20133A398 + (14:16:42, 12 December 2024)
- BVY-96-161, Responds to NRC Re Violations Noted in Insp Rept 50-271/96-09.Corrective actions:125 Vdc Voltage Drop Study, VYC-1349,was Evaluated in Light of Changes to Main Station Battery Sizing calculation,VYC-298 & Inspector Comments + (14:16:43, 12 December 2024)
- ML20133A393 + (14:16:43, 12 December 2024)
- 05000341/LER-1985-054, :on 850827,HPCI Sys Isolated.Caused by Personnel Selecting Wrong Module Inside Panel.Diagrams Showing Locations & Identification of Switch Modules from Rear or Panel Added to Surveillance Procedures + (14:16:46, 12 December 2024)
- ML20133A389 + (14:16:47, 12 December 2024)
- ML20133A387 + (14:16:49, 12 December 2024)
- ML20133A384 + (14:16:50, 12 December 2024)
- 05000266/LER-1996-011, :on 961121,Delta T Trip Setpoint Were Not Reduced in Accordance with Ts.Caused by Less than Adequate Plant Ts.Tscr Has Been Submitted to Correct This Discrepancy + (14:16:54, 12 December 2024)
- ML20133A381 + (14:16:55, 12 December 2024)
- ML20133A378 + (14:16:56, 12 December 2024)
- ML20133A375 + (14:16:57, 12 December 2024)
- ML20133A374 + (14:16:57, 12 December 2024)
- HL-5294, Submits Updated Info Re License Amend Application for Southern Nuclear to Become Licensed Operator + (14:16:58, 12 December 2024)
- ML20133A372 + (14:16:58, 12 December 2024)
- ML20133A369 + (14:17:03, 12 December 2024)
- ML20133A367 + (14:17:04, 12 December 2024)
- ML20133A368 + (14:17:04, 12 December 2024)