Similar Documents at Salem |
---|
Category:CORRESPONDENCE-LETTERS
MONTHYEARML20217M2101999-10-19019 October 1999 Forwards NRC Rept Number 17, Requal Tracking Rept from Operator Licensing Tracking Sys.Rept Was Used by NRC to Schedule Requalification Exam for Operators & Record Requal Pass Dates ML18107A5601999-10-18018 October 1999 Submits 30-day Fuel Clad Temp Rept,Iaw 10CFR50.46.Rept Describes Changes to Calculated Peak Clad Temp (PCT) for Salem Generating Station Large & Small Break LOCA Analyses ML18107A5531999-10-0808 October 1999 Forwards Summary Rept of Plant Startup & Power Ascension Testing for Sgs,Unit 2 Cycle 11,per Requirements of TS 6.9.1.1 ML18107A5561999-10-0707 October 1999 Requests Relief Associated with Containment Examinations at Hope Creek & Salem Generating Stations.Attachment 1 Includes Proposed Alternatives & Supporting Justification for Relief Requests ML18107A5591999-10-0505 October 1999 Informs That Nj Dept of Environ Protection Has No Comments on License Change Request S99-07 for Sgs,Units 1 & 2 ML18107A5501999-10-0505 October 1999 Provides Current Status of Pse&G Actions Re GL 98-01, Y2K Readiness of Computer Sys at Npps, for Salem Nuclear Generating Station,Units 1 & 2 & Hope Creek Nuclear Generating Station ML18107A5521999-10-0505 October 1999 Encourages NRC to Support Abb Combustion Engineering Nuclear Power Request for Priority Review of Generic TR Re Crossflow Ultrasonic Flow Measurement Sys IR 05000272/19990071999-09-28028 September 1999 Forwards Insp Repts 50-272/99-07 & 50-306/99-07 on 990721- 0831.One Potentially Safety Significant Issue Identified Dealing with Control Room Special Ventilation System.Four Addl Issues of Low Safety Significance Identified ML18107A5341999-09-22022 September 1999 Provides Data Re Operator Licensing Exam for Salem & Hope Creek Station,In Response to NRC Form 536 (7-1999) ML18107A5421999-09-22022 September 1999 Forwards Discharge Monitoring Rept for Salem Generating Station for Aug 1999.Rept Is Required by & Prepared Specifically for EPA & Nj Dept of Environ Protection ML20212B3631999-09-14014 September 1999 Forwards Rev 13 to Salem - Hope Creek Security Plan,Iaw 10CFR50.54(p).Summary of Proposed Changes to Plan,Encl. Encl Withheld ML18107A5321999-09-13013 September 1999 Forwards Revised 10CFR50.92 Evaluation to Clarify Util Response to Question Number 1 Re Amend to Modify TS 3/4 8.1, AC Power Sources. ML18107A5351999-09-13013 September 1999 Informs That NRC Has Reviewed Pse&G Request Proposing to Modify TS Which Allow EDG to Be Operated for 24 Surveillance Test During Any Mode,Iaw 10CFR50.91(b) & Has No Comments ML18107A5331999-09-13013 September 1999 Provides Notification That PSEG Intends to Utilize ASME Code Case N-481 During Second ISI Interval at Sgs Units 1 & 2 ML18107A5221999-09-0808 September 1999 Requests Approval to Use ASME Code Case N546,which Provides Alternative Qualification Requirements That Allow Personnel Most Familiar with Walkdown of Plant Sys,Like License Operators to Perform VT-2 Examinations ML18107A5231999-09-0808 September 1999 Forwards Salem Generating Station Semiannual Radioactive Effluent Release Rept for Jan-June 1999. Rept Summarizes Liquid & Gaseous Releases & Solid Waste Shipments from Salem Generating Station for Period of Jan-June 1999 ML18107A4981999-08-26026 August 1999 Forwards Response to NOV That Resulted from Predecisional Enforcement Conference Conducted on 990624.Corrective Actions:Communications to Supervisors Reinforced Employee Right & Duty to Raise Nuclear Safety Issues ML18107A5181999-08-26026 August 1999 Forwards Ninety Day Rept for ISI Activities Conducted at Sgs,Unit 2 During Ninth Extended Outage & Tenth Refueling Outage.List of Encl,Provided ML18107A5061999-08-26026 August 1999 Provides First Feedback from Observation of NRC Insp Under Pilot Nuclear Power Plant Insp Program.Attached Are Completed Insp Feedback Forms for Procedure 71111, Attachment 21 & Procedure 71151 ML18107A5051999-08-24024 August 1999 Informs That Nj Dept of Environ Protection Bureau of Nuclear Engineering Has Reviewed Request IAW Requirements of 10CFR50.91(b) & Has No Comments Re Amend to FOL Change Request S99-02 to Modify TS Re Penetration Valves ML18107A4921999-08-23023 August 1999 Provides Suppl Info Re 971024 Amend Request to Modify TS 3/4 7.7, Auxiliary Bldg Exhaust Air Filtration Sys. Util Withdraws from Request All Proposed Changes Associated with Filter Testing,Per Issuance of GL 99-02 ML18107A4911999-08-20020 August 1999 Forwards Revised Plant Attribute Libraries for Salem & Hope Creek Generating Stations,Iaw 10CFR50,App E,Vi, Emergency Response Data Sys, 3.b.Changes Are Identified by Rev Bars ML18107A4861999-08-19019 August 1999 Forwards NPDES Discharge Monitoring Rept, for Salem Generating Station for Month of Jul 1999.Rept Required by & Prepared Specifically for EPA & Nj Dept of Environ Protection ML18107A4831999-08-18018 August 1999 Submits Licensee Comments on NRC 990730 Ltr Which Provided Notification of Close Out of TAC Numbers MA0567 & MA0568 Re GL 92-01,Rev 1,Suppl 1 ML18107A4801999-08-13013 August 1999 Requests That Pse&Gs Contact in NUREG-0383, Directory of Compliance for Radioactive Matl Packages, Be Changed ML18107A4751999-08-0505 August 1999 Forwards Fitness for Duty Performance Data Rept for Six Month Period Ending 990630 ML20210M7571999-08-0404 August 1999 Forwards Response to Requesting Addl Info Re Status of Decommissioning Funding for Lgs,Pbaps & Sngs. Attachment Provides Restatement of Questions Followed by Response ML18107A4531999-07-20020 July 1999 Forwards Discharge Monitoring Rept for Salem Generating Station, for June 1999.Rept Is Required by & Prepared for EPA & Nj Dept of Environ Protection ML18107A4431999-07-0606 July 1999 Informs That Nj Dept of Environ Protection Bureau of Nuclear Engineering Has Reviewed Pse&G License Change Request S98-17 Re Permissible Enrichment Values for New Fuel Storage & Has No Comments ML20196J6301999-07-0101 July 1999 Requests Addl Info Re Status of Decommissioning Funding for Limerick Generating Station,Units 1 & 2,Peach Bottom Atomic Power Station,Units 1,2 & 3 & Salem Nuclear Generating Station,Units 1 & 2 ML18107A4181999-06-30030 June 1999 Submits Response to NRC Request for Info Re Y2K Readiness at Npps,Per GL 98-01,suppl 1.Disclosure Encl ML20209B6751999-06-29029 June 1999 Ack Receipt of from Dr Powell in Response to NRC Re Fitness for Duty.Attachment 2 of Will Be Withheld from Public Disclosure,Per 10CFR2.790 ML18107A4131999-06-25025 June 1999 Provides Further Clarification of Licensing & Design Basis for 125 Vdc Battery Margins for Sgs & HCGS for Meeting Station SBO & Loca/Loop Loading Requirements,Per Util 990426 Ltr & Discussion with NRC ML18107A4091999-06-22022 June 1999 Forwards Discharge Monitoring Rept for May 1999,containing Info as Required by Permit NJ0005622.Rept Prepared Specifically for EPA & Nj Dept of Environ Protection ML18107A4061999-06-21021 June 1999 Provides Supplemental Info to Proposed License Amend, Modifying TS 3/4 7.7, Auxiliary Bldg Exhaust Air Filtration Sys. Info Re Acceptance Criterion Discussed ML18107A3691999-06-11011 June 1999 Forwards Corrected Monthly Operating Rept for Apr 1999 for Salem Generating Station,Unit 1.Original Submittal Contained Typo for year-to-date Value for Numbers of Hours Generator Was on Line (Service Hours) ML18107A3641999-06-0404 June 1999 Requests Enforcement Discretion for TS 3/4.6.2.3 Re Containment Cooling Sys for Salem Generating Station,Unit 1 ML18107A3561999-06-0303 June 1999 Informs That Nj Dept of Environ Protection Bureau of Nuclear Engineering Has Reviewed Pse&G License Change Request S99-05 & Has No Comments ML18107A3611999-05-27027 May 1999 Forwards Responses to NRC 990301 & 990323 RAIs for Salem & Hope Creek Generating Stations Relating to GL 96-05 ML18107A3301999-05-24024 May 1999 Forwards Suppl Info Re GL 95-07, Pressure Locking & Thermal Binding of Safety Related Power Operated Gate Valves. Encl Contains Methodology Used in Determination of Pressure Locking Susceptibility of PORVs Block Valves ML18107A3371999-05-21021 May 1999 Forwards NPDES Discharge Monitoring for Salem Generating Station for Apr 1999, Containing Info as Required by Permit NJ0005622 ML18107A3291999-05-20020 May 1999 Forwards Redacted Response to NRC 990322 RAI Re Notification of Licensed Operator That Tested Positive for Alcohol. Attachment 2 Withheld,Per 10CFR2.790(a)(6) ML18107A3031999-05-18018 May 1999 Provides Summary of Changes to NRC Commitments That Have Been Made But Not Reported by Other Means,Iaw with NEI Process for Managing NRC Commitments ML18107A2891999-05-13013 May 1999 Forwards Rev 36 to Pse&G Nuclear Business Unit Emergency Plan. Rev 36 Incorporates Changes to Section 1-3,6 & 7 & 9-17.Attached Copy Includes All Sections of EP for Completeness ML18107A2951999-05-12012 May 1999 Submits SG Tube Plugging Rept,Per Plant TS 4.4.6.5.a.Total of 47 Tubes Were Plugged During SG Tube Insps,Which Were Completed During Plant Tenth RFO ML18107A2861999-05-11011 May 1999 Forwards Rev 0 to NFS-0174, COLR for Salem Unit 2 Cycle 11. COLR Rept Was Received by Util as Part of Reload SE ML18107A2481999-04-29029 April 1999 Forwards 1998 Annual Radiological Environ Operating Rept for Salem & Hope Creek Generating Stations. Rept Summarizes Results of Radiological Environ Surveillance Program for 1998 ML18107A2511999-04-27027 April 1999 Submits 30-day Fuel Clad Temp Rept for Salem Generating Station,Units 1 & 2.Rept Describes Changes to Calculated Peak Clad Temp (PCT) for Plant Large & Small LOCA & Small Break LOCA Analyses ML18107A2631999-04-26026 April 1999 Provides Clarification on Licensing & Design Basis for 125 Vdc Battery Margins for Sgs & HCGS for Meeting SBO & Loca/ LOOP Loading Requirements ML18107A2371999-04-26026 April 1999 Forwards Corrected Response to NRC RAI Re Licensee Request for Change to TS Permissible Enrichment Values for New Fuel Storage.Incorrect Attachment Was Provided with Util 990412 Ltr to Nrc.Encl Supersedes 990412 Submittal 1999-09-08
[Table view] Category:OUTGOING CORRESPONDENCE
MONTHYEARML20217M2101999-10-19019 October 1999 Forwards NRC Rept Number 17, Requal Tracking Rept from Operator Licensing Tracking Sys.Rept Was Used by NRC to Schedule Requalification Exam for Operators & Record Requal Pass Dates IR 05000272/19990071999-09-28028 September 1999 Forwards Insp Repts 50-272/99-07 & 50-306/99-07 on 990721- 0831.One Potentially Safety Significant Issue Identified Dealing with Control Room Special Ventilation System.Four Addl Issues of Low Safety Significance Identified ML20196J6301999-07-0101 July 1999 Requests Addl Info Re Status of Decommissioning Funding for Limerick Generating Station,Units 1 & 2,Peach Bottom Atomic Power Station,Units 1,2 & 3 & Salem Nuclear Generating Station,Units 1 & 2 ML20209B6751999-06-29029 June 1999 Ack Receipt of from Dr Powell in Response to NRC Re Fitness for Duty.Attachment 2 of Will Be Withheld from Public Disclosure,Per 10CFR2.790 ML20198H1851998-12-15015 December 1998 Responds to to President Clinton Re Rept by Gao, Issued 970530 on NRC Oversight of Nuclear Power Industry ML20198B7611998-12-0303 December 1998 Informs That on 981007,generic Fundamentals Exam Was Administered to 148 Candidates at 21 Facilities.Summary of Statistical Results of Exam Listed.Contents of Exam Along with Associated Input Data Needed for Updating Catalog Encl ML20155J7191998-11-0505 November 1998 Fourth Final Response to FOIA Request for Documents.Records Listed in App G Being Released in Entirety.Documents Listed in App H Being Withheld in Part (Ref FOIA Exemption 5) IA-98-323, First Final Response to FOIA Request for Records.Records in App a Available in Pdr.Records in App B Partially Withheld (Ref FOIA Exemption 3)1998-10-0909 October 1998 First Final Response to FOIA Request for Records.Records in App a Available in Pdr.Records in App B Partially Withheld (Ref FOIA Exemption 3) ML20154P4011998-10-0909 October 1998 First Final Response to FOIA Request for Records.Records in App a Available in Pdr.Records in App B Partially Withheld (Ref FOIA Exemption 3) ML20154B3781998-09-25025 September 1998 Informs That Facility Scheduled to Administer NRC Generic Fundamentals Exam on 981007.Sonalysts,Inc Authorized Under Contract to Support NRC in Administration of Activities. Ltr & Encls Provide Instructions & Guidelines ML20151V8401998-09-10010 September 1998 Informs That Util Authorized to Administer Initial Written Exams to Listed Applicants on 980917.NRC Region I Operator Licensing Staff Will Administer Operating Tests on 980914- 16 ML20151W9711998-09-10010 September 1998 Informs That as Part of NRC PRA Implementation Plan, Commission Has Assigned Two Senior Reactor Analysts (Sras) to Each Regional Ofc.T Shedlosky & J Trapp Have Been Assigned as SRAs in Region I ML20238F1581998-08-31031 August 1998 Informs That as Result of Review of Records,Duplication of Costs Charged for Insp Conducted at Salem Unit 2 Was Found. Amount Overcollected Will Be Transferred to Licensee within 10 Days from Date of Ltr ML20249C7661998-06-26026 June 1998 Second Partial Response to FOIA Request for Documents. Documents Listed in App D,Being Released in Entirety ML20247B4141998-05-0606 May 1998 Final Response to FOIA Request for Documents.Forwards Documents Listed in App a Being Made Available in PDR IA-98-179, Final Response to FOIA Request for Documents.Forwards Documents Listed in App a Being Made Available in PDR1998-05-0606 May 1998 Final Response to FOIA Request for Documents.Forwards Documents Listed in App a Being Made Available in PDR ML20217P4601998-05-0101 May 1998 Forwards ERDS Implementation Documents Including Data Point Library Updates for Robinson (Number 248),Peach Bottom (Number 249),Surry (Number 250),Crystal River (Number 251), McGuire (Numbers 252 & 254) & Salem (Number 253).W/o Encl ML20217N5851998-04-24024 April 1998 Partially Deleted Ltr Ref 10CFR2.790 Re NRC Investigation Repts 1-96-024 & 1-96-031 Conducted at Pse&G Plants Documenting That Crowe as Cas/Sas Operator,Falsified Records of Safeguards Event Log in May 1996 ML20217N8881998-04-24024 April 1998 Partially Deleted Ltr Referring to Investigation Rept 1-96-024 Conducted at Pse&G Plant,Documenting That as Wackenhut Systems Operator Supervisor,Recipient Falsified Records of Safeguards Event Log in May 1996 ML20217N5891998-04-24024 April 1998 Refers to NRC Investigations 1-96-024 & 1-96-031 Conducted by OI Re Allegations of Deliberate Posting of Inaccurate Info in Safeguards Event Logbook & Discrimination by Wackenhut Staff.Decided to Await Issuance of DOL Decision ML20217N5491998-04-24024 April 1998 Refers to NRC Investigations 1-96-024 & 1-96-031 Conducted by OI Re Activities Performed by Wackenhut Staff Working as Contract Security Force Personnel at Salem & Hope Creek. Decided to Await Issuance of DOL Decision Re Discrimination ML20217B6341998-03-20020 March 1998 Discusses NRC OI Rept 1-96-031 & DOL Case 97-ERA-52 on 971001.Contract Security Officer Employed by Wackenhut at Salem/Hope Creek Discrimiated Against for Raising Safety Concerns ML20203F2311998-02-20020 February 1998 Ltr Contract:Task Order 136 Entitled, Salem Restart Readiness Review, Under Contract NRC-03-93-026.Statement of Work Encl IA-97-325, Seventh Final Response to FOIA Request for Documents. Documents Listed in App I Being Released in Entirety. Documents Listed in App J Being Withheld in Entirety (Ref FOIA Exemption 4,6 & 7C)1997-12-10010 December 1997 Seventh Final Response to FOIA Request for Documents. Documents Listed in App I Being Released in Entirety. Documents Listed in App J Being Withheld in Entirety (Ref FOIA Exemption 4,6 & 7C) ML20203G5611997-12-10010 December 1997 Seventh Final Response to FOIA Request for Documents. Documents Listed in App I Being Released in Entirety. Documents Listed in App J Being Withheld in Entirety (Ref FOIA Exemption 4,6 & 7C) ML20202J3211997-12-0808 December 1997 Sixth Partial Response to FOIA Request for Documents.Record Subj to Request Encl & Identified in App H ML20202B0251997-11-26026 November 1997 Fourth Partial Response to FOIA Request for Documents. Records Subj to Request Encl & Identified in App D ML20199J1611997-11-24024 November 1997 Third Partial Response to FOIA Request for Documents. Documents Listed in App C Being Released in Entirety & Encl ML20199J1161997-11-21021 November 1997 Second Partial Response to FOIA Request for Documents. Records in App B Encl & Withheld in Part (Ref FOIA Exemption 7) ML20202D0541997-11-19019 November 1997 First Partial Response to FOIA Request for Documents.Records Subj to Request Encl & Identified in App a ML20202B6531997-06-0606 June 1997 Discusses Investigation Conducted by NRC OI to Review Whether Pse&G Intentionally Operated Outside Design Basis & Failed to Make Timely Notification of Unanalyzed Condition Re Pops.Concluded That Pse&G Made Changes to Facility ML20140E1091997-06-0505 June 1997 Ltr Contract:Task Order 112, Salem Restart Readiness Review, Under Contract NRC-03-93-026 ML20148K0551997-06-0404 June 1997 Forwards Amends 194 & 177 to Licenses DPR-70 & DPR-75, Respectively.Amends Change TSs 3.4.3 & 3.4.5, Relief Valves, to Ensure Automatic Capability of PORVs to Relieve Pressure Is Maintained When Valves Are Isolated ML20148C3561997-05-12012 May 1997 Thirty-fifth Partial Response to FOIA Request for Documents. Forwards Documents Listed in App Rrr Being Made Available in Pdr.App SSS Records Being Withheld in Part (Ref FOIA Exemption 6) ML20148C2281997-05-0808 May 1997 Ltr Contract:Task Order 126, Evaluation of Salem Restart Test Program, Under Contract NRC-03-93-026,awarded to Parameter,Inc ML20137X4881997-04-11011 April 1997 Final Response to FOIA Request for Documents.Forwards App Ee Records Being Withheld in Part (Ref Exemptions 5 & 6) ML20137N1591997-03-31031 March 1997 Informs That Licensee Facility Scheduled to Administer NRC GFE on 970409.Sonalsts,Inc Authorized Under Contract to Support NRC Administration of GFE Activities ML20147F8381997-03-25025 March 1997 Responds to to Chairman Jackson Expressing Concerns Re NRC Confirmatory Order Suspending Authority for & Limiting Power Operation & Containment Pressure & Demand for Info, ML20137H4051997-03-24024 March 1997 Twelveth Partial Response to FOIA Request for Documents. App DD Records Being Withheld in Part (Ref Exemptions 5 & 6) ML20137A6311997-03-14014 March 1997 Third Final Response to FOIA Request for Documents.Records in App E Encl & Will Be Available in Pdr.App F Records Withheld in Part (Ref FOIA Exemption 3) ML20137A8601997-03-11011 March 1997 Second Partial Response to FOIA Request.Records Listed in App D Encl & Will Be Available in Pdr.App C Records Withheld in Entirety (Ref FOIA Exemption 5) ML20147F8591997-02-27027 February 1997 Responds to to Hj Miller Re Millstone,Salem & Myap Npps.Provides Answers to Questions Raised in to HR Meyer ML20135C0211997-02-26026 February 1997 First Partial Response to FOIA Request for Documents.Records in App a Encl & Will Be Available in Pdr.App B Records Withheld in Entirety (Ref FOIA Exemption 5) ML20135B7551997-02-26026 February 1997 Eleventh Partial Response to FOIA Request for Documents. App AA Document Forwarded.App Bb Documents Partially Withheld (Ref FOIA Exemption 5).App CC Documents Withheld (Ref FOIA Exemption 5) ML20134P2801997-02-22022 February 1997 Ack Receipt of & Electronic Transfer of $100,000 in Payment for Civil Penalty Proposed by NRC in ML20135B9511997-02-20020 February 1997 Responds to 970113 & 30 Ltrs Requesting That Full Commission Vote to Determine Whether Plant Should Be Permitted to Resume Operations ML20134K1311997-02-11011 February 1997 Tenth Partial Response to FOIA Request for Documents. Forwards App X & Y Documents.Documents Available in Pdr.App X Documents Withheld in Part (Ref FOIA Exemptions 3 & 5).App Z Documents Withheld in Entirety (Ref FOIA Exemption 5) IR 05000272/19970011997-02-11011 February 1997 Forwards Initial Exam Repts 50-272/97-01OL & 50-311/97-01OL Administered on 970106-10 ML20134J8571997-02-0707 February 1997 Nineth Partial Response to FOIA Request for Documents. Records in App U Encl & Being Made Available in Pdr.App V Records Being Withheld in Part (Ref Exemptions 6) & App W Records Being Withheld in Entirety (Ref Exemption 5) ML20134H2521997-02-0606 February 1997 Final Response to FOIA Request for Documents.Records in App a Encl & Will Be Available in PDR 1999-09-28
[Table view] |
Text
\
w g uco
, [b
% ;j g NUCLEAR REGULATORY COMMISSION REGloN 1 o, g 475 ALLENDALE ROAD KING oF PRUSslA, PENNSYLVANIA 19406-1415
% . . . + ,d December 11, 1996 EA 96-177 Mr. Leon R. Eliason Chief Nuclear Officer and President Nuclear Business Unit Public Service Electric and Gas Company Post Office Box 236 Hancocks Bridge, New Jersey 08038
SUBJECT:
NOTICE OF VIOLATION AND PROPOSED IMPOSITION OF CIVIL PENALTIES -
$80,000 (Office of Investigations (01) REPORTS 1-94-006R and 1-94-053)
This refers to the two investigations, Ol Reports 1-96-006R and 1-94-053, conducted from February 18,199^ to April 30,1996 and from November 21,1994 to April 25,1996, respectively, at the Salem Generating Station. These investigations found that an Onsite Safety Review Engineer (OSRE) and a Safety Review Engineer (SRE) were harassed, intimidated and discriminated against by a former manager of the Nuclear Safety Review (NSR)
Group as a result of raising safety concerns. Specifically, as noted in the synopses of the two subject reports, forwarded to you with our letter, dated July 1,1996,01 found that this former Manager, NSR, had (1) discriminated against the OSRE by virtue of negative comments in the OSRE's performance appraisals due to the individual's involvement in events associated with a December 3,1992, incident involving two of his subordinates (both of whom were Safety Review Engineers) (01 Report 1-94-006R, hereafter 01 Report No. 1); and (2) discriminated against an SRE by virtue of his transfer to the Hope Creek Safety Review Group (SRG) from the Salem SRG (OI Report 1-94-053, hereafter Ol Report No. 2). On September 11,1996, the NRC conducted a predecisional enforcement conference with you and members of your staff in King of Prussia, Pennsylvania, to discuss the findings of the two subject Olinvestigations.
With respect to 01 report No.1 (sent to you on July 1,1996), Ol found that the former Manager, NSR, provided negative comments in an interim performance assessment of the OSRE in November 1993, and in a subsequent final appraisal in May 1994. One of the negative comments criticized an April 7,1993, memoranda that the OSRE had written to each of the two SRE subordinates who were involved in a December 1992 discrimination inci, dent that the NRC dispositioned on April 11,1995 by the issuance of a Severity Level 11 violation and an $80,000 civil penalty (EA 94-239). In the April 1993 memoranda, the OSRE was supportive of the two subordinates with respect to their roles in the December 1992 incident.
Another negative comment in the former Manager, NSR's appraisals of the OSRE criticized an October 12,1993, memorandum that the OSRE had sent to the former Manager, NSR, di: cussing a concern with the former Manager, NSR, on October 4,1993, regarding SORC members anticipating criticism for acting in support of safety after a system engineer presented a temporary modification to the SORC. The OSRE had entitled the memorandum, 4
" Atmosphere of intimidation". The former Manager, NSR, included both of these examples in the OSR6's appraisals as examples of poor judgement by the OSRE. With respect to 01 9612310088 961211 i PDR ADOCK 05000272 G PDR
_ ~ - - _ _ - . - . - _ . - - . - . . . - - . _ - . - . - - . _ .
/ o ;
I !
p .
4 i Public Service Electric and 2 ,
l Gas Company -
i l Report No. 2, Ol found that the SRE, by virtue of his transfer to the Hope Creek Safety Review i j Group (SRG) from the Salem SRG, against his wishes, was harassed and discriminated against 1 by the former Manager, NSR, as a result of raising a safety issue.
l 1
Atthe predecisional enforcement conference, your staff contended thattheseindividuals were ;
not discriminated against, noting that the former Manager, NSR's actions were motivated by valid, non-discriminatory reasons. However, the NRC does not agree with your contentions j- and believes that discrimination had occurred. For example, the April 1993 memoranda for ,
l which the OSRE was criticized in his assessment, was sent by the OSRE to his two SRE l i subordinates at a time when the former Manager, NSR, was not yet the OSRE's supervisor, l and at a time which was outside the performance assessment period. In addition, the former
- Manager, NSR, criticized the OSRE for terminology used in the October 12, 1993, j memorandum which was written by the OSRE after the Manager, NSR, specifically asked the OSRE to put his views in writing for the benefit of senior management, following a discussion l
l
- regarding the SORC issue. The former Manager, NSR did not directly communicate his l criticism of the terminology of the October memorandum until the November,1993 interim i performance assessment. Lastly, with respect to the SRE, the Manager, NSR, included this individual in a termination list prepared at the request of the then Vice President, Nuclear, a
- few days after the former Manager, NSR, approved the SRE's involuntary transfer to the Hope
! Creek SRG. The then Vice President, Nuclear, promptly removed the individual's name from l the termination list on the basis that it would send the wrong message to the organization.
4 The SRE was subsequently transferred back to the Salem SRG by the new Director-QA/NSR after the new Director assumed his position. '
1 i
As stated to you in the April 11,1995, letter, transmitting a civil penalty for the discrimination of two SREs who attempted to process a safety issue in accordance with station procedures l l by submitting an incident report at the Salem Station (EA 94-239), your organization has the ;
- responsibility to ensure that a work environment exists such that employees feel free to raise j safety concerns. The actions of the former Manager, NSR,in late 1993 and early 1994, did j not adhere to these standards, and did not provide an appropriate examp!e for management, !
! supervisors, or staff within their line organization, nor for the other PSE&G organizations with which they interfaced. Given the management status of the former manager, NSR, these actions constitute violations of NRC requirements classified in the aggregate in accordance i
with the NRC Enforcement Policy, " General Statement of Policy and Procedures for NRC -
Enforcement Actions," NUREG-1600 (Enforcement Policy), as a Severity Level ll problem.
3
- In accordance with the Enforcement Policy, a base civil penalty in the amount of $80,000 is j considered for a Severity Level ll problem. For Severity Level ll violations, the NRC considers
- j. whether credit is warranted for identification and Corrective Actio.n in accordance with the c. ...
j penalty assessment process in Section VI.B.2 of the Enforcement Policy. Credit was not given for identification since the NRC identified the violation. However, the NRC recognizes that subsequent to the identification of the violation by the NRC, actions were taken to correct the
- violation and prevent recurrence. The corrective actions were described at the enforcement conference, as well as in your July 21,1995, responso to a chilling effect letter sent to you 1 on June 21,1995, concerning the DOL Area Director finding of discrimination in the case filed j with DOL by the OSRE. These corrective actions included, but were not limited to (1) the
- President and Chief Nuclear Officer personally expressing his expectations to all employees 1
i a
. \
, Public Service Electric and 3 Gas Company i
that they should feel free to resolve their concerns through line management ar'd existing !
procedures; (2) creation of the Employee Concerns Program ca r, art of the February 1995 reorganization of the QA/NSR Department, and a subsequent revision to the program after conducting a benchmark survey at other plants; and (3) institution of a more comprehensive !
employee training program which includes explaining some of the more subtle forms of discrimination which can hinder or frustrate the process of employees bringing concerns to be dealt with. Based on these actions, credit is warranted for your comprehensive corrective {
action in this case, in addition, the NRC recognizes that the adverse actions in this case occurred in the 1993 and i 1994 time period and happened under a different management team. The NRC also recognizes that a settlement agreement was entered between you and the OSRE in the DOL proceeding, and that the SRE was transferred back to the Salem SRG. Nonetheless, to l emphasize the significance that the NRC attaches to any finding of discrimination, as well as the importance of current management ensuring a safety-conscience environment where !
employees feel free to raise safety concerns, I have been authorized, after consultation with the Director, Office of Enforcement, and the Deputy Executive Director for Nuclear Reactor Regut tion, Regional Operations, and Research, to issue the enclosed Notice of Violation and Proposed imposition of Civil Penalty in the base amount of $80,000 for a Severity Level ll problem stemming from violations of 10 CFR 50.7.
You are required to respond to this letter and should follow the instructions specified in the enc!osed Notice when preparing your response. In your response you should include, for the i docket, your corrective actions to improve and monitor the overall program for raising safety )
concerns at the Salem and Hope Creek f acilities. The NRC will use your response, in part, to determine whether further enforcement action is necessary to ensure compliance with regulatory requirements.
In accordance with 10 CFR 2.790 of the NRC's " Rules of Practice," a copy of this letter, and your response will be placed in the NRC Public Document Room (PDR).
Sincerely,
/rpOL Hubert J. Miller Regional Administrator Decket Nos. 50-272; 50-311 License Nos. DPR-70; DPR-75
Enclosure:
Notice of Violation and Proposed imposition of Civil Penalty 1
1 1
1
/ .
Public Service Electric and 4 Gas Company cc w/ encl:
L. Storz, Senior Vice President - Nuclear Operations E. Simpson, Senior Vice President - Nuclear Engineering E. Salowitz, Director - Nuclear Business Support C. Schaefer, External Operations - Nuclear, Delmarva Power & Light Co.
D. Garchow, General Manager - Salem Operations J. Benjamin, Director - Quality Assurance & Nuclear Safety Review D. Powell, Manager, Licensing and Regulation R. Kankus, Joint Owner Affairs A. Tapert, Program Administrator R. Fryling, Jr., Esquire M. Wetterhahn, Esquire P. MacFarland Goelz, Manager, Joint Generation Atlantic Electric Consumer Advocate, Office of Consumer Advocate W. Conklin, Public Safety Consultant, Lower Alloways Creek Township Public Service Commission of Maryland State of New Jersey .
State of Delaware o f t
l 4
I l
l i
l l
j Public S:rvica El:ctric cnd G:s -
Company i
DISTRIBUTION: i PUBLIC
, SECY ,
CA JTaylor, EDO JMilhoan, DEDR JLieberman, OE HMiller, RI FDavis, OGC FMiraglia, NRR RZimmerman, NRR 1 Enforcement Coordinators :
RI, Ril, Rlli, RIV '
BBeecher, GPA/PA GCaputo, 01 :
DBangart, OSP i HBell, OlG EJordan, AEOD OE:Chron i OE:EA DCS DScrenci, PAO-RI (2) l NUDOCS ;
Nuclear Safety information Center (NSIC) i LTremper, OC l
n r.e.iv. e copy of thle document, indi9ete in the bos: 'C' = Co%ygthout ettechment/ enclosure 'E' = Copy attachment e e o ure OFFICE RI:E0 4)# RI:DRPffffEJ RI:RC JO RIAM Jg l OE t"U NAME DHolody/mfc RCoop6f'" KSmith fQ )m HiijVmf JLieberman /l DATE 10/14 /96 10//f /96 10/165)I'" 1 10/ W /96 09/ /0$3- 42/d /t (
a l0FFICE '
DJOR ) l l l l l lNAME JMilhoan lDATE \ 10/ /96/
Y( l F OFFICIAL RECORD COPY p a: PROP-SAL.REV (k [-
310025 l
!