ML20133A378

From kanterella
Jump to navigation Jump to search

Submits Updated Info Re License Amend Application for Southern Nuclear to Become Licensed Operator
ML20133A378
Person / Time
Site: Vogtle  Southern Nuclear icon.png
Issue date: 12/23/1996
From: Mccoy C
GEORGIA POWER CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
LCV-0606-F, LCV-606-F, TAC-M84531, TAC-M84532, NUDOCS 9612310069
Download: ML20133A378 (2)


Text

  • Georgit Powir Comp ny 40 Inv rness C;ntir Parkway d

Post Off:ce Box 1295 Birmingham, Alabama 35201 Telephone 205 992-7122 m

Georgia Power C.K.McCoy the soutten electnc systern Vice President. Nuclear Vogtle Project Decemher 23,1996 Docket Nos. 50-424 LCV-0606-F 50-425 TAC Nos.

M84531 M84532 U. S. Nuclear Regulatory Commission ATTR Document Control Desk Washington, DC 20555 VOGTLE ELECTRIC GENERATING PLANT UPDATED INFORMATION FOR LICENSE AMENDMENTS APPLICATION SOUTHERN NUCLEAR TO BECOME THE LICENSED OPERATOR Gentlemen:

On September 18,1992, Georgia Power Company (GPC) submitted an application to amend Facility Operating License (FOL) Nos. DPR-57 and NPF-5 which would authorize Southern Nuclear Operating Company, Inc. (Southern Nuclear) to become the licensed operator and have exclusive responsibility and control over the physical construction, operation, and maintenance of Vogtle Electric Generating Plant, Unit I and Unit 2 (VEGP). By letters to the NRC dated October 7,1992, October 15,1992, September 11,1996, December 12,1996, and December 19, 1996, GPC supplemented or provided information related to this application.

In response to telephone conversations during the ast week, GPC is informing the NRC that r

GPC and Southern Nuclear will fulfill the commitments made in Mr. C. Kenneth McCoy's February 1,1995 letter to Mr. James Lieberman of the NRC (Docket Nos. 50-424; EA 93-304).

GPC and Southern Nuclear understand that the NRC will rely upon these commitments in its approval of the application.

\\

96i2310069 961223 p

DR ADOCK 0500 4

C)

.m t

GeorglaPbwerA

. U. S. Nuclear Regulatory Commission Page Two i

4

+

i-j i

In accordance with 10 CFR 50.91, the designated State official will be sent a copy of this letter.

l 1

Sincerely, i

r 1

i i

C. K. McCoy i

i f

i 4

CKMfrWS 1-i i

t

. t cc:

Georgia Power Comnany i

Mr. H. A. Franklin Mr. W. G. Hairston,111 i

Mr. J. D. Woodard Mr. J. B. Beasley i

Mr. M. Sheibani NORMS f

U S. Nuclear Regulatorv Commission Mr. S. D. Ebneter, Regional Administrator j

Mr. L. L. Wheeler, Licensing Project Manager, NRR i

Mr. C. R. Ogle, Senior Resident inspector, Vogtle State ofGeoreia

)

Mr. L. C. Barrett, Commissioner, Department of Natural Resources l

J 3

2 i.

l 1

l

}

LCV-0606-F

--