Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20133E636 + (13:37:56, 12 December 2024)
- ML20133E634 + (13:37:57, 12 December 2024)
- TXX-4572, Deficiency Rept SDAR-197 Re Indeterminant Compliance W/Reg Guide 1.29 Concerning Installation of Train C Conduit on non-nuclear safety-related Dead Weight Supports.Initially Reported on 850906.Evaluation Will Be Completed by 860122 + (13:37:58, 12 December 2024)
- ML20133E631 + (13:37:59, 12 December 2024)
- 05000289/LER-1985-002-02, :on 850907,reactor Manually Tripped Due to Fire in CRD Transfer Switch.Caused by Failure of Relay K171 Which Shorted Groups 5 & 6 Rod Select Contacts.Failed Components Replaced + (13:38:01, 12 December 2024)
- ML20133E628 + (13:38:03, 12 December 2024)
- ML20133E625 + (13:38:03, 12 December 2024)
- ML20133E624 + (13:38:04, 12 December 2024)
- ML20133E623 + (13:38:04, 12 December 2024)
- ML20133E620 + (13:38:05, 12 December 2024)
- ML20133E618 + (13:38:06, 12 December 2024)
- ML20133E616 + (13:38:07, 12 December 2024)
- ML20133E617 + (13:38:07, 12 December 2024)
- 05000304/LER-1985-018-06, :on 850930,discovered That Four Limitorque Valve Operators Had Jumper Wires Different from Wires Tested by Vendor in Environ Qualification Program.Cause Not Stated.Part 21 Related + (13:38:09, 12 December 2024)
- ML20133E613 + (13:38:10, 12 December 2024)
- TXX-4577, Deficiency Rept SDAR-195 Re Program for Identifying non-seismic-to-seismic Interactions of Large Equipment Masses in 2 Inch & Less Piping.Initially Reported on 850906. Item Not Reportable Per 10CFR50.55(e) + (13:38:11, 12 December 2024)
- ML20133E608 + (13:38:12, 12 December 2024)
- ML20133E605 + (13:38:13, 12 December 2024)
- ML20133E603 + (13:38:13, 12 December 2024)
- ML20133E601 + (13:38:14, 12 December 2024)
- ML20133E600 + (13:38:15, 12 December 2024)
- ML20133E597 + (13:38:16, 12 December 2024)
- ML20133E596 + (13:38:17, 12 December 2024)
- IR 05000369/1985011 + (13:38:18, 12 December 2024)
- ML20133E589 + (13:38:18, 12 December 2024)
- ML20133E587 + (13:38:19, 12 December 2024)
- TXX-4570, Deficiency Rept SDAR-188 Re Concrete Debris Found in Seismic/Separation Gap Between Fuel & Auxiliary Bldgs. Initially Reported on 850726.Adequacy of Gap Between Plant Structures Studied.Evaluation to Be Complete by 851217 + (13:38:20, 12 December 2024)
- ML20133E586 + (13:38:20, 12 December 2024)
- ML20133E582 + (13:38:22, 12 December 2024)
- 05000369/LER-1985-018-01, :on 850525,valve 1RV-429 in Containment Ventilation Cooling Water Sys Outside Containment Found Open,Allowing Flow Path Between Auxiliary Bldg & Upper Containment Through Inside Containment Valve + (13:38:25, 12 December 2024)
- ML20133E576 + (13:38:26, 12 December 2024)
- ML20133E573 + (13:38:27, 12 December 2024)
- ML20133E571 + (13:38:33, 12 December 2024)
- ML20133E567 + (13:38:34, 12 December 2024)
- ML20133E568 + (13:38:34, 12 December 2024)
- ML20133E566 + (13:38:36, 12 December 2024)
- ML20133E564 + (13:38:39, 12 December 2024)
- PY-CEI-NRR-2128, Responds to NRC Re Violations Noted in Insp Rept 50-440/96-06.Corrective Actions:M&Te Computer Tracking Sys Checked,Requirements for Maintaining Control of M&TE Implemented & Detailed in PAP-1201 + (13:38:40, 12 December 2024)
- ML20133E558 + (13:38:41, 12 December 2024)
- ML20133E557 + (13:38:42, 12 December 2024)
- ML20133E556 + (13:38:42, 12 December 2024)
- ML20133E555 + (13:38:43, 12 December 2024)
- TXX-4509, Deficiency Rept SDAR-183 Re Containment Isolation Valves. Initially Reported on 850612.Evaluation Expected by 850830 + (13:38:44, 12 December 2024)
- ML20133E553 + (13:38:44, 12 December 2024)
- ML20133E552 + (13:38:45, 12 December 2024)
- 05000443/LER-1996-007-03, :on 961206,EFW Flow Delivery Delays Occurred. Caused by Error in UFSAR Chapter 15 Accident Analyses. Determination Will Be Completed After Fwlb Analyses Is Updated + (13:38:46, 12 December 2024)
- ML20133E549 + (13:38:51, 12 December 2024)
- 05000306/LER-1996-003-02, :on 961205,auto-start of 21 Component Cooling Water Pump Occurred Due to Personnel error.MV-32122 Was Immediately Reopened & 21 CC Pump Subsequently Shutdown & MV-32160 Closed + (13:38:53, 12 December 2024)
- ML20133E542 + (13:38:54, 12 December 2024)
- ML20133E543 + (13:38:54, 12 December 2024)
- 05000306/LER-1996-004-02, :on 961206,failure to Perform SP-2244,cycling of Unit 2 Containment Air Sample Valves Occurred.Caused by Personnel Error.Surveillance Has Already Been Performed in Both 3rd & 4th Quarters + (13:38:56, 12 December 2024)
- TXX-4578, Deficiency Rept SDAR-186 Re Conflict Between Component Cooling Water Pump & Associated HVAC Sys Specified by Fire Protection Program Review Timeline.Initially Reported on 850716.Item Not Reportable Per 10CFR50.55(e) + (13:38:57, 12 December 2024)