ML20133E564
| ML20133E564 | |
| Person / Time | |
|---|---|
| Site: | Nine Mile Point |
| Issue date: | 06/28/1985 |
| From: | Linville J NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I) |
| To: | NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I) |
| References | |
| NUDOCS 8507220549 | |
| Download: ML20133E564 (1) | |
Text
(
US. NUCLEAR REGULATORY C0ft11SS10N No.-85-71 REGION 1 NOTICE OF LICENSEE MEETING JUN 2 81905 Licensee:
Niagara Mohawk Power Corporation Facility:
Nine Mile Point Unit 2 Docket No.
50-410 Time and Date:
9:00 a.m. and 1:00 p.m., July 23,1985 Location:
Nine Mile Point Unit 2, Scriba, New York
Purpose:
Discuss licensee's Hardware Verification Program and Transition Organization NRC Attendees:
T. Murley, Regional Administrator R.Starostecki, Director,DivisionofReactorProjects(DRP)
S. Ebneter, Director, Division of Reactor Safety (DRS)
- 5. Collins, Chief, Projects Branch 2 DRP J. Durr, Chief. Engineering Programs Branch, DRS J. Linville, Chief, Reactor Projects Section 2C, DRP R. Gram, Senior Resident Inspector, Nine Mile Point Unit 2 Licensee Attendeos:
W. J. Donlon, President D. L. Quamme, Project Manager, Nine title Point Unit 2 C. G. Beckham, Quality Assurance Manager, Projects J. Perry, Director, Quality Assurance C. V. Mangan, Vice President, Nuclear Engineering and Licensing Note: Attendance by other NRC personnel should be made known to J. C. Linville,
[
RegionI(FTS 488-1122), by 4:00 pm, July 19, 1985.
Prepared by #ti
/ M 41 J.C.Linville, Chief [RPS2C, DRP Distribution:
i W. Dircks Executive Director for Operations V. Stello, Deputy Executive Director for Regional Operations and Generic Requirements
(
J. Taylor, Director, Office of Inspection and Enforcement PublicDocumentRoom(PDR)
LocalPublicDocumentRoom(LPDR) bcc: Regional Administrator Receptionist Deputy Regional Administrator Public Affairs Office Division Directors DRMA File Branch Chiefs DRP File W
& ($0 $ 10 0
- DRP 4
pop i
invil c/jm 9
0FFICIAL RPRORD 00?T