Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20133F175 + (13:32:53, 12 December 2024)
- ML20133F172 + (13:32:54, 12 December 2024)
- ML20133F173 + (13:32:54, 12 December 2024)
- ML20133F171 + (13:32:55, 12 December 2024)
- ML20133F169 + (13:32:56, 12 December 2024)
- RBG-21659, Final Deficiency Rept DR-290 Re Leak Rates of Charcoal Filtration Sys Ductwork.Initially Reported on 850724.All Affected Ductwork Retested Using Fan Pressures Taken from vendor-supplied Fan Performance Curves + (13:32:59, 12 December 2024)
- ML20133F162 + (13:33:00, 12 December 2024)
- ML20133F161 + (13:33:01, 12 December 2024)
- ML20133F158 + (13:33:02, 12 December 2024)
- ML20133F155 + (13:33:03, 12 December 2024)
- ML20133F156 + (13:33:03, 12 December 2024)
- ML20133F154 + (13:33:04, 12 December 2024)
- ML20133F150 + (13:33:05, 12 December 2024)
- ML20133F152 + (13:33:05, 12 December 2024)
- ML20133F148 + (13:33:06, 12 December 2024)
- ML20133F146 + (13:33:07, 12 December 2024)
- ML20133F147 + (13:33:07, 12 December 2024)
- 05000483/LER-1985-033, :on 850716,Door U3071 Separating Two Fan Rooms in Essential Svc Water Cooling Tower Not Included in Surveillance Procedures,Per Tech Spec 3/4.7.11.Hourly Fire Watch Established + (13:33:10, 12 December 2024)
- A05178, Comments on Draft Rept on Integrated Safety Assessment Program Review of Operating Experience.Rept Should Be Corrected to State That Plant Operated for 374 Consecutive Days & Set Us BWR Record + (13:33:11, 12 December 2024)
- U-600207, Forwards Response to Generic Ltr 85-07 Re Implementation of Integrated Schedules for Plant Mods.Integrated Milestone Schedule & Supporting Detail Schedules Presently Address NRC-initiated Mods & util-sponsored Changes + (13:33:12, 12 December 2024)
- 05000423/LER-1996-050-01, :on 961211,chill Water Pump Suction Pressure Gauges (3HVK-P126A & 3HVK-P126B) Did Not Meet Instrument Range Requirements.Caused by Inadequate Administrative Structure for IST Program.Procedure Change Implemented + (13:33:14, 12 December 2024)
- ML20133F140 + (13:33:15, 12 December 2024)
- ML20133F139 + (13:33:16, 12 December 2024)
- ST-HL-AE-1246, Forwards Rev 1 to Technical Evaluation of Anchor Bolts & Embedded Rods,South Texas Project. Rept Updated to Include 29 Addl Nonconformance Repts & Responses to NRC Questions in Section 4.0.Related Correspondence + (13:33:16, 12 December 2024)
- ML20133F137 + (13:33:17, 12 December 2024)
- ML20133F136 + (13:33:18, 12 December 2024)
- U-600248, Responds to Questions Re Use of Silicone Sealant in Main Control Room HVAC Ductwork.Ductwork Has in-leakage Acceptance Criteria Less than Allowed by ANSI N509 + (13:33:19, 12 December 2024)
- ML20133F135 + (13:33:19, 12 December 2024)
- ML20133F130 + (13:33:20, 12 December 2024)
- ML20133F127 + (13:33:21, 12 December 2024)
- ML20133F126 + (13:33:22, 12 December 2024)
- IR 05000455/1985021 + (13:33:24, 12 December 2024)
- RBG-21326, Interim Deficiency Rept DR-314 Re Leakage of Fluid Fyrquel from Pump Seals to Pump Drive Motor in Borg-Warner Electrohydraulic Operators of Copes-Vulcan Modulating Valves.Initially Reported on 850617.Next Rept by 850726 + (13:33:25, 12 December 2024)
- ML20133F123 + (13:33:26, 12 December 2024)
- ML20133F120 + (13:33:27, 12 December 2024)
- 05000266/LER-1985-006, :on 850903,turbine Runback Occurred.Caused by Voltage Spike on Red Instrument Bus,Resulting in Momentary Downward Spike on Nuclear Instrumentation Sys.Red Inverter Inspected & Returned to Svc.All Sys Normal + (13:33:29, 12 December 2024)
- IR 05000424/1984036 + (13:33:30, 12 December 2024)
- ML20133F116 + (13:33:31, 12 December 2024)
- ML20133F117 + (13:33:31, 12 December 2024)
- ML20133F114 + (13:33:32, 12 December 2024)
- ML20133F113 + (13:33:33, 12 December 2024)
- ML20133F111 + (13:33:34, 12 December 2024)
- ML20133F110 + (13:33:34, 12 December 2024)
- ML20133F107 + (13:33:35, 12 December 2024)
- ML20133F106 + (13:33:36, 12 December 2024)
- ML20133F104 + (13:33:36, 12 December 2024)
- ML20133F103 + (13:33:37, 12 December 2024)
- RBG-21784, Advises That Util Contracted W/Doe for Transportation & Disposal of Spent Fuel & High Level Radwaste,Effective 851001,in Response to NRC Request + (13:33:37, 12 December 2024)
- ML20133F099 + (13:33:38, 12 December 2024)
- ML20133F098 + (13:33:39, 12 December 2024)
- ML20133F096 + (13:33:40, 12 December 2024)