UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION Before the Atomic Safety And Licensing Board CEETCP J h*.r'C a
In the Matter of GEORGIA POWER COMPANY Docket Numbers
'65 AUS -7 A!0:56 g al.
)
50-424 and 50-425
)
trf,4 ce..u,hr.
00c4E rrm0; Sd (Vogtle Electric Generating
)
SRAN'N Plant, Units 1 and 2)
AFFIDAVIT OF VIRGIL L. BROWNLEE 1, Virgil L. Brownlee, state onder oath that:
1.
My name is Virgil L. Brownlee.
My business address is 101 Marietta St.,
Suite 2900, Atlanta, Georgia 30323.
I am employed by the Nuclear Regulatory Commission, Region II office.
I am a Branch Chief in the Division of Reactor Projects and have responsibility for the Vogtle Electric Generating Plant.
In this capacity, I supervise the management of the Inspection and Enforcement Program applied to the Vogtle Project.
Prior to this assignment, from October 4,1981 through June 1983, I was the Section Chief responsible for inspection and enforcement activities at the project and was the supervisor of the resident inspector at the facility in the area of construction.
I have performed special site inspections relative to Construction Assessment and the Quality Concerns Program.
The statements set forth herein are true and correct to the best of my knowledge.
A statement of my professional qualifications is attached.
0500000152 050005 PDR ADOCK 05000424 0
PDH
4 2
s t
2.
I have reviewed the inspection and enforcement history of the Vogtle Project from 1973'to the present, and I have reviewed the SALP reports for the project.. Based on this review I have concluded that Georgia Power Company (GPC) has an effective QA/QC program to provide reasonable assurance that the Vogtle plant is built in compliance with applicable regulatory require-ments and FSAR commitments.
Continued inspection effort by the NRC staff will provide continued assurance as to the adequacy of the GPC QA/QC program prior to licensing and throughout the life of the plant.
(1 +
w V-Virgil L. Brownlee Sub pr.ibad.,,and sworn before me ph '
f.5h,[s..M_'.'dittofAugust,1985
- : m." g j
3 6
4
\\mLfthtSY$mele,)
\\
T'u l
My Comission Expires:
[s,1E i
t
~ _. - - -
1 1
VIRGIL L. BROWNLEE PROFESSIONAL QUALIFICATIONS
]
REGION II - 0FFICE OF INSPECTION AND ENFORCEMENT i
j U.S. NUCLEAR REGULATORY COMMISSION My name is Virgil L. Brownlee.
My business address is 101 Marietta j
i j
Street, NW, Suite 2900, Atlanta, Georgia 30323.
I am employed by the United States Nuclear Regulatory Commission, Region II, as a Project Branch Chief.
i i
i i
1 My primary assignment as the present Project Branch Chief and the previous Project Section Chief for the Vogtle Project encompasses the J
period from October 4,1981 through present.
Prior to assignment as a Project Section Chief, I functioned as a Project Inspector from May 1969
)
>through October 3, 1981.
During the Project Inspector period, !
participated in over 200 inspections relating predominately to design, i
procurement, construction and operation of nuclear power plants.
As Project Section Chief I was responsible for implementing the Inspection and Enforcement Program for 9 sites (16 reactors) including the Vogtle i
i Plant during construction and operational phases. To accomplish this, !
coordinated the inspection efforts of individual inspectors and consultants, participated in programed inspections and prescribed special inspection i
i efforts in specific areas of concern and supervised site resident inspector l
)
tunctions.
1 i
1 i
i t
r
l 2
s My present assignment as Project Branch Chief includes 11 sites (22 I
reactors),' including the Vogtle Plant; eighteen of these units are operationai and four have construction permits.
As Branch Chief. I am responsible for assuring implementation of the Inspection and Enforcement l
Program for the above nuclear units. To accomplish this I supervise four Section Chiefs and provide oversight management to assure that the Inspec-tion and Enforcement Program is implemented at the respective sites.
PriortomyemploymentwiththeAtomicEnergyCommission(presentlyNRC),
I was a member of the U.S. Air Force and was assigned to the Army Nuclear t
Power Program from December 1958 through June 1969. My major assignments with the Army Nuclear Power Program were as follows:
1.
Qualified operator on three reactors--SM-1, Fort Belvoir, Virginia; PM-1, Sundance AFS, Wyoming; Nuclear Engineering Center, Wright-Patterson AFB, Ohio.
2.
Shift Supervisor / Maintenance Superintendent on two reactors--PM-1, Sundance AFS, Wyoming; Nuclear Engineering Center, Wright-Patterson AFB, Ohio.
1 I
3.
Construction / Test /Startup and Operation of two reactor facilities--PM-1, Sundance AFS, Wyoming; Nuclear Engineering Center, Wright-Patterson AFB, Ohio.
I 1
{
3 I have received my secondary education in a public school system in Illinois.' I have completed accredited college courses from Black Hills College and Wright State University.
During my Air Force and NRC career, I have completed several military and civilian courses related to the nuclear field.
The related courses included:
nuclear physics; nuclear, electrical and mechanical engineering; instrumentation and control systems; operators training; reactor safety (MIT); welding (AWS); radiography (Kodak); Nondestructive examination (Convair); PWR Systems (NRC); PWR Operations and Transients 6
(NRC);PWRSimulatorOperations(NRC);andBWRSystems(NRC).
l l
.