ML20133F148
| ML20133F148 | |
| Person / Time | |
|---|---|
| Site: | River Bend |
| Issue date: | 01/07/1997 |
| From: | Dyer J NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV) |
| To: | Mcgaha J ENTERGY OPERATIONS, INC. |
| Shared Package | |
| ML20133F149 | List: |
| References | |
| NUDOCS 9701140082 | |
| Download: ML20133F148 (6) | |
See also: IR 05000458/1996016
Text
D
[f "%s . \\
NUCLEAR REGULATORY COMMISSION
UNITED STATES
I
_
y
~
)
[.
f-
i
n scion iv
?
.;
611 RY AN PL AZA DRIVE, SUITE 400
'8
A R LINGToN, T E X AS 76011 8064
9....*e
JAN - 71997
John R. McGaha, Vice President - Operations
l
River Bend Station
Entergy Operations, Inc.
P.O. Box 220
St. Francisville, Louisiana 70775
SUBJECT: NRC INSPECTION REPORT 50 d58/96-016 AND NOTICE OF VIOLATION
Dear Mr. McGaha:
1
An NRC inspection was conducted November 3 through December 14,1996, at your River
Bend Station reactor f acility. The enclosed report presents the scope and results of that
inspection.
,
During the 6-week period covered by this inspection period, your conduct of activities at
the River Bend Station facility was generally characterized by safety-conscious operations,
sound engineering and maintenance practices, and good radiation protection support. We
are concerned, however, about three violations of NRC requirements that were identified.
The first violation identified by the inspectors involved a system operating procedure for
the hydrogen control system that f ailed to include breakers that, if mispositioned, would
render all or portions of the hydrogen igniters inoperable. Of particular concern was that
personnel introduced the error during the procedure upgrade process and verification and
i
validation f ailed to identify the error.
l
1
The second violation, identified by the inspectors, was for the inadvertent entry into
Technical Specification 3.0.3 for a short duration for inoperable high and low pressure core
j
sprays due to a failure to properly implement your Safety Function Determination Program
as required by Technical Specifications.
l
1
The third violation was identified by the inspectors during review of a corrective action
document because your staff failed to properly implement the requirements of ASME Boiler
j
and Pressure Vessel Code Section XI,1980 Edition through Winter 1981 Addenda.
!
Specifically, operators placed the Train A spent fuel pool cooling pump in service, with
j
Train B out of service, without obtaining a new set of reference values, af ter performing
j
operability analyses for low system flow six months earlier. This violation is of concern
'
because of other receat issues relating to implementation of your inservice test program.
,
l
These violations are cited in the enclosed Notice of Violation (Notice), and the
circumstances surrounding the violations are described in detailin the enclosed report.
Please note that you are required to respond to this letter and should follow the
instructions specifieu in the enclosed Notice when preparing your response. The NRC will
9701140082 970107
l
ADOCK 05000458
G
i
t
i
.
.
, ._ _. _ _ _ __. _ _ .._ . _ ___ _ _ _ ..__ _ ..
_ . . _ _ . _ _
-
.
i
.
Entergy Operations, Inc.
-2-
!
I
use your response, in part, to determine whether further enforcement action is necessary
to ensure compliance with regulatory requirements.
In accordance with 10 CFR 2.790 of the NRC's " Rules of Practice," a copy of this letter,
its enclosures, and your response will be placed in the NRC Public Document Room (PDR).
j
To the extent possible, your response should not include any personal privacy, proprietary,
l
or safeguards information so that it can be placed in the PDR without redaction.
l
l
Should you have any questions concerning this inspection, we will be pleased to discuss
l
them with you.
!
l
Sincerely,
l
A.
J. E. Dyer, Director
Division of Reactor Projects
Docket No.: 50-458
License No.: NPF-47
I
Enclosures:
2. NRC Inspection Report
50-458/96 16
cc w/ enclosures:
Executive Vice President and
Chief Operating Officer
i
Entergy Operations, Inc.
P.O. Box 31995
Jackson, Mississippi 39286-1995
Vice President
Operat ons Support
i
Entergy Operations, Inc.
P.O. Box 31995
Jackson, Mississippi 39286-1995
General Manager
Plant Operations
River Bend Station
.
l
Entergy Operations, Inc.
1
P.O. Box 220
j
St. Francisville, Louisiana 70775
I
_ _ _
_
._
_
- .
.
_
.
<
-.
. --
. - .
. .
. -
- . - . . -
.. -.
. - .. .. - .
.. - .. . .-... -
. - . - . . . .
- --
-
.
I
e
!
Entergy Operations, Inc.
-3-
l
4
Director - Nuclear Safety
River Bend Station
Entergy Operations, Inc.
P.O. Box 220
St. Francisville, Louisiana 70775
,
l
Wise, Carter, Child & Caraway
l
P.O. Box 651
'
Jackson, Mississippi 39205
Mark J. Wetterhahn, Esq.
Winston & Strawn
1401 L Street, N.W.
Waehington, D.C. 20005-3502
!
Manager - Licensing
i
River Bend Station
l
Entergy Operations, Inc.
l
P.O. Box 220
St. Francisville, Louisiana 70775
The Honorable Richard P. leyoub
l
Attorney General
1
'
P.O. Box 94095
Baton Rouge, Louisiana 70804-9095
H. Anne Plettinger
3456 Villa Rose Drive
i
Baton Rouge, Louisiana 70806
l
President of West Feliciana
Police Jury
P.O. Box 1921
St. Francisville, Louisiana 70775
Larry G. Johnson, Director
Systems Engineering
Cajun Electric Power Coop. Inc.
10719 Airline Highway
P.O. Box 15540
Baton Rouge, Louisiana 70895
,
!
4
J
i
l
-_. -.
-- . - .
-
- -
-
-
- . . .
_
..
_ , _ _
-
-
. .
--
- _ - . . .
..
. . - ._
-.
l
Entergy Operations, Inc.
-4
William H. Spell, Administrator
Louisiana Radiation Protection Division
P.O. Box 82135
Baton Rouge, Louisiana 70884-2135
r
!
i
,
i
_
_
_ _ _ .
._
_
. _ _ . _ _ _ _ .
_
_ . _ _ _ _ _ . ~ .
. - . . . ~ . _ _ _ _ _ _ _ _ _ . _ _ _ _ _ . _
_.
o
JAN - 71997
.
l
Entergy Operations, Inc.
-5-
!
E-Mail report to D. Nelson (DJN)
E-Mail report to NRR Event Tracking System (IPAS)
E-Mail report to R. Frahm (RKF)
E-Mail report to R. Correia (RPC)
bec to DMB (IE01)
l
l
bec distrib. by RIV:
l
L. J. Callan
Senior Resident inspector (Grand Gulf)
DRP Director
Branch Chief (DRP/D)
DRS-PSB
<
!
Project Engineer (DRP/D)
MIS System
Branch Chief (DRP/TSS)
RIV File
l
Resident inspector
Leah Tremper (OC/LFDCB, MS: TWFN 9E10)
l
l
!
1
!
!
140053
/
DOCUMENT NAME: R:\\_RB\\RB616RP.WFS
}
To receive copy of document, indicate in box: "C" = Copy without enclosures
"E" =
/
Copy with enclosures "N" = No copy
,
]
E
C:DRP/D
d
D:DRP
l
l
o
n
_
WFSm'ityj)((@(
PHHarren g pf[')
JEDyer M
I
12/?p /7 @
12/%\\ /9fy( M
LM/7(Seg7
i
\\
OFFICIAL RECORD COPY
,
e-
,-
.
_ ___ _
. _ . _
_
. _ _
_ . . _ . . _ . . . _ _ _ . _ . _ , . _ _ ~ . . . _ _ . .
__- . _ . _ _ _ _
_
.
JAN - 7 1997
'
,
l
l
Entergy Operations, Inc.
-5-
E-Mail report to D. Nelson (DJN)
E-Mail report to NRR Event Tracking System (IPAS)
E-Mail report to R. Frahm (RKF)
E-Mail report to R. Correia (RPC)
bec to DMB (IE01)
!
bec distrib. by RIV:
I
l
L. J. Callan
Senior Resident inspector (Grand Gulf)
DRP Director
Branch Chief (DRP/D)
DRS-PSB
i
Project Engineer (DRP/D)
MIS System
Branch Chief (DRP/TSS)
RIV File
Resident Inspector
Leah Tremper (OC/LFDCB, MS: TWFN 9E10)
,
l
l
,
!
1
l
DOCUMENT NAME: R:\\_RB\\RB616RP.WFS
To receive copy of document, indicate in box: "C" = Copy without enclosures "E" =
Copy with enclosures "N" = No copy
,
l
]
E
C:DRP/D
d
D:DRP
l
o
n
_
l
WFSmityj)({g)VJ(
PHHarren g p)#')
JEDyer @f
(
12/?;t /Sfy* ~ @
12/%\\ /9fy( M
IM/7 LS6tyy
\\
OFFICIAL RECORD COPY
-
'
!
I