ML20133F148

From kanterella
Jump to navigation Jump to search
Forwards Insp Rept 50-458/96-16 on 961103-1214 & Notice of Violation
ML20133F148
Person / Time
Site: River Bend Entergy icon.png
Issue date: 01/07/1997
From: Dyer J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Mcgaha J
ENTERGY OPERATIONS, INC.
Shared Package
ML20133F149 List:
References
NUDOCS 9701140082
Download: ML20133F148 (6)


See also: IR 05000458/1996016

Text

D

[f "%s . \\

NUCLEAR REGULATORY COMMISSION

UNITED STATES

I

_

y

~

)

[.

f-

i

n scion iv

?

.;

611 RY AN PL AZA DRIVE, SUITE 400

'8

A R LINGToN, T E X AS 76011 8064

9....*e

JAN - 71997

John R. McGaha, Vice President - Operations

l

River Bend Station

Entergy Operations, Inc.

P.O. Box 220

St. Francisville, Louisiana 70775

SUBJECT: NRC INSPECTION REPORT 50 d58/96-016 AND NOTICE OF VIOLATION

Dear Mr. McGaha:

1

An NRC inspection was conducted November 3 through December 14,1996, at your River

Bend Station reactor f acility. The enclosed report presents the scope and results of that

inspection.

,

During the 6-week period covered by this inspection period, your conduct of activities at

the River Bend Station facility was generally characterized by safety-conscious operations,

sound engineering and maintenance practices, and good radiation protection support. We

are concerned, however, about three violations of NRC requirements that were identified.

The first violation identified by the inspectors involved a system operating procedure for

the hydrogen control system that f ailed to include breakers that, if mispositioned, would

render all or portions of the hydrogen igniters inoperable. Of particular concern was that

personnel introduced the error during the procedure upgrade process and verification and

i

validation f ailed to identify the error.

l

1

The second violation, identified by the inspectors, was for the inadvertent entry into

Technical Specification 3.0.3 for a short duration for inoperable high and low pressure core

j

sprays due to a failure to properly implement your Safety Function Determination Program

as required by Technical Specifications.

l

1

The third violation was identified by the inspectors during review of a corrective action

document because your staff failed to properly implement the requirements of ASME Boiler

j

and Pressure Vessel Code Section XI,1980 Edition through Winter 1981 Addenda.

!

Specifically, operators placed the Train A spent fuel pool cooling pump in service, with

j

Train B out of service, without obtaining a new set of reference values, af ter performing

j

operability analyses for low system flow six months earlier. This violation is of concern

'

because of other receat issues relating to implementation of your inservice test program.

,

l

These violations are cited in the enclosed Notice of Violation (Notice), and the

circumstances surrounding the violations are described in detailin the enclosed report.

Please note that you are required to respond to this letter and should follow the

instructions specifieu in the enclosed Notice when preparing your response. The NRC will

9701140082 970107

l

PDR

ADOCK 05000458

G

PDR

i

t

i

.

.

, ._ _. _ _ _ __. _ _ .._ . _ ___ _ _ _ ..__ _ ..

_ . . _ _ . _ _

-

.

i

.

Entergy Operations, Inc.

-2-

!

I

use your response, in part, to determine whether further enforcement action is necessary

to ensure compliance with regulatory requirements.

In accordance with 10 CFR 2.790 of the NRC's " Rules of Practice," a copy of this letter,

its enclosures, and your response will be placed in the NRC Public Document Room (PDR).

j

To the extent possible, your response should not include any personal privacy, proprietary,

l

or safeguards information so that it can be placed in the PDR without redaction.

l

l

Should you have any questions concerning this inspection, we will be pleased to discuss

l

them with you.

!

l

Sincerely,

l

A.

J. E. Dyer, Director

Division of Reactor Projects

Docket No.: 50-458

License No.: NPF-47

I

Enclosures:

1. Notice of Violation

2. NRC Inspection Report

50-458/96 16

cc w/ enclosures:

Executive Vice President and

Chief Operating Officer

i

Entergy Operations, Inc.

P.O. Box 31995

Jackson, Mississippi 39286-1995

Vice President

Operat ons Support

i

Entergy Operations, Inc.

P.O. Box 31995

Jackson, Mississippi 39286-1995

General Manager

Plant Operations

River Bend Station

.

l

Entergy Operations, Inc.

1

P.O. Box 220

j

St. Francisville, Louisiana 70775

I

_ _ _

_

._

_

- .

.

_

.

<

-.

. --

. - .

. .

. -

- . - . . -

.. -.

. - .. .. - .

.. - .. . .-... -

. - . - . . . .

- --

-

.

I

e

!

Entergy Operations, Inc.

-3-

l

4

Director - Nuclear Safety

River Bend Station

Entergy Operations, Inc.

P.O. Box 220

St. Francisville, Louisiana 70775

,

l

Wise, Carter, Child & Caraway

l

P.O. Box 651

'

Jackson, Mississippi 39205

Mark J. Wetterhahn, Esq.

Winston & Strawn

1401 L Street, N.W.

Waehington, D.C. 20005-3502

!

Manager - Licensing

i

River Bend Station

l

Entergy Operations, Inc.

l

P.O. Box 220

St. Francisville, Louisiana 70775

The Honorable Richard P. leyoub

l

Attorney General

1

'

P.O. Box 94095

Baton Rouge, Louisiana 70804-9095

H. Anne Plettinger

3456 Villa Rose Drive

i

Baton Rouge, Louisiana 70806

l

President of West Feliciana

Police Jury

P.O. Box 1921

St. Francisville, Louisiana 70775

Larry G. Johnson, Director

Systems Engineering

Cajun Electric Power Coop. Inc.

10719 Airline Highway

P.O. Box 15540

Baton Rouge, Louisiana 70895

,

!

4

J

i

l

-_. -.

-- . - .

-

- -

-

-

- . . .

_

..

_ , _ _

-

-

. .

--

- _ - . . .

..

. . - ._

-.

l

Entergy Operations, Inc.

-4

William H. Spell, Administrator

Louisiana Radiation Protection Division

P.O. Box 82135

Baton Rouge, Louisiana 70884-2135

r

!

i

,

i

_

_

_ _ _ .

._

_

. _ _ . _ _ _ _ .

_

_ . _ _ _ _ _ . ~ .

. - . . . ~ . _ _ _ _ _ _ _ _ _ . _ _ _ _ _ . _

_.

o

JAN - 71997

.

l

Entergy Operations, Inc.

-5-

!

E-Mail report to D. Nelson (DJN)

E-Mail report to NRR Event Tracking System (IPAS)

E-Mail report to R. Frahm (RKF)

E-Mail report to R. Correia (RPC)

bec to DMB (IE01)

l

l

bec distrib. by RIV:

l

L. J. Callan

Senior Resident inspector (Grand Gulf)

DRP Director

Branch Chief (DRP/D)

DRS-PSB

<

!

Project Engineer (DRP/D)

MIS System

Branch Chief (DRP/TSS)

RIV File

l

Resident inspector

Leah Tremper (OC/LFDCB, MS: TWFN 9E10)

l

l

!

1

!

!

140053

/

DOCUMENT NAME: R:\\_RB\\RB616RP.WFS

}

To receive copy of document, indicate in box: "C" = Copy without enclosures

"E" =

/

Copy with enclosures "N" = No copy

,

SRI

]

E

C:DRP/D

d

D:DRP

l

l

o

n

_

WFSm'ityj)((@(

PHHarren g pf[')

JEDyer M

I

12/?p /7 @

12/%\\ /9fy( M

LM/7(Seg7

i

\\

OFFICIAL RECORD COPY

,

e-

,-

.

_ ___ _

. _ . _

_

. _ _

_ . . _ . . _ . . . _ _ _ . _ . _ , . _ _ ~ . . . _ _ . .

__- . _ . _ _ _ _

_

.

JAN - 7 1997

'

,

l

l

Entergy Operations, Inc.

-5-

E-Mail report to D. Nelson (DJN)

E-Mail report to NRR Event Tracking System (IPAS)

E-Mail report to R. Frahm (RKF)

E-Mail report to R. Correia (RPC)

bec to DMB (IE01)

!

bec distrib. by RIV:

I

l

L. J. Callan

Senior Resident inspector (Grand Gulf)

DRP Director

Branch Chief (DRP/D)

DRS-PSB

i

Project Engineer (DRP/D)

MIS System

Branch Chief (DRP/TSS)

RIV File

Resident Inspector

Leah Tremper (OC/LFDCB, MS: TWFN 9E10)

,

l

l

,

!

1

l

DOCUMENT NAME: R:\\_RB\\RB616RP.WFS

To receive copy of document, indicate in box: "C" = Copy without enclosures "E" =

Copy with enclosures "N" = No copy

,

l

SRI

]

E

C:DRP/D

d

D:DRP

l

o

n

_

l

WFSmityj)({g)VJ(

PHHarren g p)#')

JEDyer @f

(

12/?;t /Sfy* ~ @

12/%\\ /9fy( M

IM/7 LS6tyy

\\

OFFICIAL RECORD COPY

-

'

!

I