Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20133H516 + (13:06:33, 12 December 2024)
- ML20133H514 + (13:06:34, 12 December 2024)
- ML20133H515 + (13:06:34, 12 December 2024)
- ML20133H511 + (13:06:35, 12 December 2024)
- ML20133H509 + (13:06:36, 12 December 2024)
- 05000277/LER-1985-018-01, :on 850912,reactor Water Cleanup Sys Inboard & Outboard Suction Valves Closed Due to High Flow Isolation Signal.Caused by Too Rapid Opening of Demineralizer Outlet Valve.Operator Instructed on Proper Procedures + (13:06:38, 12 December 2024)
- ML20133H504 + (13:06:40, 12 December 2024)
- ML20133H506 + (13:06:40, 12 December 2024)
- 0CAN088509, Responds to NRC Re Violations Noted in Insp Repts 50-313/85-15 & 50-368/85-16.Corrective Actions:Procedure 2203.09, Fire Protection Sys Annunciator Corrective Action, Rev 0 Revised + (13:06:41, 12 December 2024)
- ML20133H502 + (13:06:42, 12 December 2024)
- ML20133H501 + (13:06:43, 12 December 2024)
- 05000352/LER-1985-073, :on 850911,reactor Scrammed on Low Level Due to Feedwater Pump Trip on Low Suction Pressure & Isolation Signal Occurred.Caused by Loss of Condensate Pump B.Reactor Stabilized Using Trip Procedures T-99 & 100 + (13:06:44, 12 December 2024)
- ML20133H499 + (13:06:45, 12 December 2024)
- ML20133H496 + (13:06:46, 12 December 2024)
- ML20133H497 + (13:06:46, 12 December 2024)
- IR 05000313/1985015 + (13:06:47, 12 December 2024)
- 05000348/LER-1985-016, :on 851002,plant Experienced Electrical Shorts Between Conductors in GE Series 100 Low Voltage Control Electrical Containment Penetration Modules.Caused Attributed to Separated Adjacent Connectors + (13:06:49, 12 December 2024)
- ML20133H490 + (13:06:50, 12 December 2024)
- ML20133H492 + (13:06:50, 12 December 2024)
- ML20133H488 + (13:06:51, 12 December 2024)
- IR 05000309/1985018 + (13:06:53, 12 December 2024)
- ML20133H485 + (13:06:53, 12 December 2024)
- ML20133H482 + (13:06:54, 12 December 2024)
- ML20133H481 + (13:06:55, 12 December 2024)
- ML20133H480 + (13:06:55, 12 December 2024)
- ML20133H479 + (13:06:56, 12 December 2024)
- ML20133H477 + (13:06:57, 12 December 2024)
- ML20133H474 + (13:06:58, 12 December 2024)
- ML20133H475 + (13:06:58, 12 December 2024)
- ML20133H473 + (13:06:59, 12 December 2024)
- ML20133H471 + (13:07:00, 12 December 2024)
- ML20133H469 + (13:07:01, 12 December 2024)
- ML20133H470 + (13:07:01, 12 December 2024)
- ML20133H468 + (13:07:02, 12 December 2024)
- ML20133H467 + (13:07:03, 12 December 2024)
- ML20133H464 + (13:07:03, 12 December 2024)
- ML20133H462 + (13:07:04, 12 December 2024)
- ML20133H461 + (13:07:05, 12 December 2024)
- ML20133H459 + (13:07:05, 12 December 2024)
- 05000382/LER-1985-031, :on 850704,main Feedwater Pump a Tripped Due to High Vibrations on Feedwater Pump Turbine.No Apparent Cause Noted.Alarming Function Will Remain in Place to Alert Personnel of Vibration Increase + (13:07:07, 12 December 2024)
- ML20133H456 + (13:07:08, 12 December 2024)
- ML20133H457 + (13:07:08, 12 December 2024)
- ML20133H455 + (13:07:09, 12 December 2024)
- 05000259/LER-1985-046, :on 850912,chemical Lab Technician Left Continuous Air Monitor Sample Hose to Turbine Bldg Ventilation Continuous Air Monitor Disconnected.Technician Disciplined.Procedure Will Be Revised + (13:07:10, 12 December 2024)
- 05000322/LER-1985-042, :on 850912,low Level Reactor Trip Occurred During Operational Condition 2.Caused by Operator Opening & Closing Test Valve,Producing Pressure Oscillation in Narrow Range Variable Leg A.Operator Counseled + (13:07:12, 12 December 2024)
- ML20133H452 + (13:07:14, 12 December 2024)
- 05000454/LER-1985-089, :on 850913,both Trains of Control Room Ventilation Inoperable.Caused by Workers Misreading HVAC Ductwork Drawings.Project Const Dept Will Review HVAC Drawing Conventions W/Personnel Responsible + (13:07:16, 12 December 2024)
- 05000361/LER-1985-048, :on 850915,w/unit in Mode 3,containment Purge Initiated,Requiring Collection of Iodine & Particulate Sample.Sample Collected Late Due to Failure of Chemistry Technician to Follow Direction + (13:07:17, 12 December 2024)
- ML20133H448 + (13:07:19, 12 December 2024)
- 05000322/LER-1985-039, :on 850909 & 18,while Performing Surveillance Procedure on Reactor Bldg Standby Ventilation Sys Filter Trains,Control Room Air Conditioning Initiations Occurred Due to Low Differential Pressure Condition + (13:07:21, 12 December 2024)
- ML20133H445 + (13:07:22, 12 December 2024)