ML20133H457
| ML20133H457 | |
| Person / Time | |
|---|---|
| Site: | Arkansas Nuclear |
| Issue date: | 10/03/1985 |
| From: | Johnson E NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV) |
| To: | Jeffery Griffin ARKANSAS POWER & LIGHT CO. |
| Shared Package | |
| ML20133H460 | List: |
| References | |
| NUDOCS 8510170371 | |
| Download: ML20133H457 (2) | |
See also: IR 05000313/1985022
Text
SM,
l
,"'
.
.
OCT 0 31985
_
,
In Reply Refer To:
Dockets:
50-313/85-22
50-368/85
,
'
,
.
-
. Arkansas Power & Light Company
ATTN: John M. Griffin,
Senior Vice President -
,
Energy Supply
P. O. Box 551
,
,
Little Rock, Arkansas 72203
Gentlemen:
This refers to the inspection conducted by Messrs. W. D. Johnsea and P. H.
Harrell.of this office during the period August 1-31, 1985, of activities
authorized by NRC-Operating Licenses DPR-51 and NPF-6 for Arkansas Nuclear One,
Units 1 and 2, and to the discussion of our findings with Mr. J. M. Levine, and
other members of your staff at the conclusion of the inspection.
Areas examined during the inspection included operational safety verification,
maintenance, surveillance, design change control, followup on previously
identified items, followup of Unit 2 onsite event, low temperature
overpressurization protection for Unit 1, and nonlicensed staff training.
Within these areas, the inspection consisted of selective exsmination of
procedures and representative records, interviews with personnel, and
observations by the inspectors.
The findings are documented in the enclosed
inspection report.
During this inspection, it was found that certain of your activities were
in violation of NRC requirements. Consequently, you are required to respond
to these violations, in writing, in accordance with the provisions of
Section 2.201 of the NRC's " Rules of Practice," Part 2, Title 10, Code of
Federal Regulations.
Your response should be based on the specifics contained
in the Notice of Violation enclosed with th-is letter.
The response directed by this letter and the accompanying Notice is not subject
to the clearance procederes of the Office of Management and Budget
as required by the Paperwork Reduction Act of 1980, PL 96-511.
RIV:SR
RI
RPB/,B
RPB (p(/
M DJohnson/1w
jo/p /85
p/j/85~
arrel
LEMartJn
EHJohnson
jp
//// /85
(O/5 /85
yA ' M A N !A
/
'
..
-
,
=
'
' Arkansas Power &~ Light Company
-2-
- Should you have-any questions concerning this inspection, we will be pleased to
discuss them with you.
Sincerely,
ordinst sir.ned By
1
E. H. Johnson
'
Eric H. Johnson, Chief
Reactor Projects Branch
Enclosures:
1.
Appendix A - Notice of Violation
2.
Appendix B - NRC Inspection Report
50-313/85-22
50-368/85-23
i
cc w/ enclosures:
Arkansas Nuclear One
-
J. M. Levine, General Manager
1
P. O. Box-608
Russellville, Arkansas 72801
- Arkansas Radiation Control Program Director
bcc to DMB (IE01)
bec distrib. by RIV:
.
- RPB ~
- Resident Inspector
R. D. Martin, RA
'
- R&SPB
- Section Chief (RPB/B)
- D. Weiss, LFMB (AR-2015)
- RIV-File
R. Denise. DRS&P
- MIS SYSTEM
~*RSTS Operator
_
- w/766
~
.
t
., - -
, , ,
n
.-+,,-- .-,
r
+ . - - + , - ,
e
- ,
,
- ,
w,