Forwards Insp Repts 50-313/85-22 & 50-368/85-23 on 850801-31 & Notice of Violation
ML20133H457
Person / Time
Site: Arkansas Nuclear  Entergy icon.png
Issue date: 10/03/1985
From: Johnson E
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Jeffery Griffin
ARKANSAS POWER & LIGHT CO.
Shared Package
ML20133H460 List:
References
NUDOCS 8510170371
Download: ML20133H457 (2)


See also: IR 05000313/1985022

Text

SM,

l

,"'

.

.

OCT 0 31985

_

,

In Reply Refer To:

Dockets:

50-313/85-22

50-368/85

,

'

,

.

-

. Arkansas Power & Light Company

ATTN: John M. Griffin,

Senior Vice President -

,

Energy Supply

P. O. Box 551

,

,

Little Rock, Arkansas 72203

Gentlemen:

This refers to the inspection conducted by Messrs. W. D. Johnsea and P. H.

Harrell.of this office during the period August 1-31, 1985, of activities

authorized by NRC-Operating Licenses DPR-51 and NPF-6 for Arkansas Nuclear One,

Units 1 and 2, and to the discussion of our findings with Mr. J. M. Levine, and

other members of your staff at the conclusion of the inspection.

Areas examined during the inspection included operational safety verification,

maintenance, surveillance, design change control, followup on previously

identified items, followup of Unit 2 onsite event, low temperature

overpressurization protection for Unit 1, and nonlicensed staff training.

Within these areas, the inspection consisted of selective exsmination of

procedures and representative records, interviews with personnel, and

observations by the inspectors.

The findings are documented in the enclosed

inspection report.

During this inspection, it was found that certain of your activities were

in violation of NRC requirements. Consequently, you are required to respond

to these violations, in writing, in accordance with the provisions of

Section 2.201 of the NRC's " Rules of Practice," Part 2, Title 10, Code of

Federal Regulations.

Your response should be based on the specifics contained

in the Notice of Violation enclosed with th-is letter.

The response directed by this letter and the accompanying Notice is not subject

to the clearance procederes of the Office of Management and Budget

as required by the Paperwork Reduction Act of 1980, PL 96-511.

RIV:SR

RI

RPB/,B

RPB (p(/

M DJohnson/1w

jo/p /85

p/j/85~

arrel

LEMartJn

EHJohnson

jp

//// /85

(O/5 /85

yA ' M A N !A

/

'

..

-

,

=

'

' Arkansas Power &~ Light Company

-2-

Should you have-any questions concerning this inspection, we will be pleased to

discuss them with you.

Sincerely,

ordinst sir.ned By

1

E. H. Johnson

'

Eric H. Johnson, Chief

Reactor Projects Branch

Enclosures:

1.

Appendix A - Notice of Violation

2.

Appendix B - NRC Inspection Report

50-313/85-22

50-368/85-23

i

cc w/ enclosures:

Arkansas Nuclear One

-

J. M. Levine, General Manager

1

P. O. Box-608

Russellville, Arkansas 72801

- Arkansas Radiation Control Program Director

bcc to DMB (IE01)

bec distrib. by RIV:

.

  • RPB ~
  • Resident Inspector

R. D. Martin, RA

'

  • R&SPB
  • Section Chief (RPB/B)
  • D. Weiss, LFMB (AR-2015)
  • RIV-File

R. Denise. DRS&P

  • MIS SYSTEM

~*RSTS Operator

_

  • w/766

~

.

t

., - -

, , ,

n

.-+,,-- .-,

r

+ . - - + , - ,

e

- ,

,

- ,

w,