ML20133H502
| ML20133H502 | |
| Person / Time | |
|---|---|
| Site: | La Crosse File:Dairyland Power Cooperative icon.png |
| Issue date: | 07/31/1985 |
| From: | Taylor J DAIRYLAND POWER COOPERATIVE |
| To: | Zwolinski J Office of Nuclear Reactor Regulation |
| References | |
| RTR-NUREG-0827, RTR-NUREG-827 LAC-11060, NUDOCS 8508090369 | |
| Download: ML20133H502 (2) | |
Text
,
s.
'D DA/RYLAND h
[k COOPERAT/VE e.o. box 817
- 2615 EAST AV SOUTH
- LA CROSSE. WISCONSIN S4601 (608) 788 4 000 July 31, 1985 In reply, please refer to LAC-11060 DOCKET NO. 50-409 Director of Nuclear Reactor Regulation Attn:
Mr. John Zwolinski, Chief
,r Operating Reactor Branch #5 Division of Licensing U. S. Nuclear Regulatory Commission-Washington, DC 20555
SUBJECT:
DAIRYLAND POWER COOPERATIVE LA CROSSE BOILING WATER REACTOR PROVISIONAL OPERATING LICENSE NO. DPR-45 NUREG-0827, INTEGRATED PLANT SAFETY ASSESSMENT CHANGE OF CONNI'INENT DATE FOR THE LA CROSSE BOILING WATER REACTOR
REFERENCES:
(1)
Letter, LAC-10683, F.Linder (DPC) to John Zwolinski (NRC), dated April 8, 1985.
(2)
Letter, LS05-85-04-037, J. Zwolinski (NRC) to F. Linder, dated April 26, 1985.
Dear Mr. Zwolinski:
In your letter (Reference 2), you requested that we submit our proposed design and related radiation exposure / cost analysis for the installation of a second remotely operated isolation valve on our Shutdown condenser vent line (NUREG-0827, Item 4.21.3.2).
In accordance with telephone conversations, David Rybarik (DPC) to Walter Paulson (NRC Project Manager) on 07/26/84.we advised him with respect to our delay in providing the design / analysis information and a revised submittal date of August 30, 1985.
Presently, we are proceeding on a schedule that will support installation of the second isolation valve during our scheduled 1986 refueling outage.
8500090369 850 9
PDR ADOCK O p
0 P
0 Pol-8 1
c,
^4 C
Mr. John W. Zwolinski, Chief July 31, 1985 Operating Reactor Branch #5 LAC-11060 If you have any questions, please feel free to contact John Parkyn at 608-689-2331.
Sincerely, DAIRYLAND POWER COOPERATIVE
$9W$
(
James. W. Taylor General Manager JWT:DLR:sks I
cc:
Mr. J.G. Keppler NRC Resident Inspector Walter Paulson, LACBWR Project Manger John Parkyn, LACBWR Superintendent l
PCI-8 2