Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20133M134 + (12:34:37, 12 December 2024)
- ML20133M136 + (12:34:37, 12 December 2024)
- ML20133M132 + (12:34:38, 12 December 2024)
- RC-97-0015, Forwards Rev 38 to EP-100, Radiation Emergency Plan + (12:34:39, 12 December 2024)
- ML20133M130 + (12:34:39, 12 December 2024)
- ML20133M124 + (12:34:40, 12 December 2024)
- 1CAN019703, Forwards Revised OTSG Iga Sizing Technique App H Qualification + (12:34:41, 12 December 2024)
- B16153, Forwards Proposed Third Party Oversight of Comprehensive Plan Re Concerns Raised by Employees + (12:34:43, 12 December 2024)
- ML20133M112 + (12:34:44, 12 December 2024)
- ML20133M113 + (12:34:44, 12 December 2024)
- ML20133M111 + (12:34:45, 12 December 2024)
- ML20133M102 + (12:34:47, 12 December 2024)
- ML20133M107 + (12:34:47, 12 December 2024)
- ML20133M098 + (12:34:50, 12 December 2024)
- ML20133M094 + (12:34:51, 12 December 2024)
- ML20133M091 + (12:34:52, 12 December 2024)
- ML20133M088 + (12:34:53, 12 December 2024)
- 05000213/LER-1985-009-01, :on 850910,one Auxiliary Feedwater solenoid- Operated Valve Failed to Change State Upon Deenergization. Caused by Stuck Valve NP-8320A-185E.Periodic Cycling Will Be Performed Until Problem Resolved + (12:34:55, 12 December 2024)
- B11801, Forwards Integrated Safety Assessment Program Topics 1.02 & 1.19 Re Tornado Missile Protection & Integrated Structural Analysis,Respectively,Per 850517 Commitment + (12:34:56, 12 December 2024)
- ML20133M083 + (12:34:56, 12 December 2024)
- ML20133M080 + (12:34:57, 12 December 2024)
- ML20133M076 + (12:34:58, 12 December 2024)
- 05000271/LER-1996-001, :on 960202,TS 4.6.E Was Met Due to Components Not Being Included in IST Program Scope.Updated IST Program Plan Has Been Approved as Rev 18 + (12:35:03, 12 December 2024)
- ML20133M074 + (12:35:04, 12 December 2024)
- ML20133M068 + (12:35:05, 12 December 2024)
- ML20133M065 + (12:35:06, 12 December 2024)
- ML20133M059 + (12:35:08, 12 December 2024)
- PY-CEI-NRR-2131, Monthly Operating Rept for Dec 1996 for Perry Nuclear Power Plant,Unit 1 + (12:35:09, 12 December 2024)
- ML20133M055 + (12:35:10, 12 December 2024)
- ML20133M052 + (12:35:11, 12 December 2024)
- ML20133M049 + (12:35:12, 12 December 2024)
- ML20133M045 + (12:35:13, 12 December 2024)
- ML20133M042 + (12:35:14, 12 December 2024)
- ML20133M039 + (12:35:15, 12 December 2024)
- ML20133M038 + (12:35:17, 12 December 2024)
- ML20133M036 + (12:35:17, 12 December 2024)
- RBG-43560, Application for Amend to License NPF-47,requesting Rev to TS 3.4.11 Re RCS Pressure & Temp Limits + (12:35:18, 12 December 2024)
- ML20133M032 + (12:35:19, 12 December 2024)
- ML20133M029 + (12:35:20, 12 December 2024)
- ML20133M027 + (12:35:21, 12 December 2024)
- 05000333/LER-1996-014, :on 961215,manual Scram Occurred Due to Leak in Main Turbine electro-hydraulic Control Sys.Failed Actuator Seal Was Repaired & Equipment Failure Evaluation of 29BPV-4 Actuator Seal Was Completed + (12:35:23, 12 December 2024)
- ML20133M022 + (12:35:24, 12 December 2024)
- ML20133M016 + (12:35:25, 12 December 2024)
- ML20133M013 + (12:35:26, 12 December 2024)
- ML20133M012 + (12:35:27, 12 December 2024)
- ML20133M011 + (12:35:27, 12 December 2024)
- 05000245/LER-1985-016, :on 850916,automatic Actuation of ESF Occurred. Caused by Isolation of Reactor Bldg Ventilation & Initiation of Standby Gas Treatment Due to Steam Tunnel High Radiation Spike.Isolation Signal Reset + (12:35:38, 12 December 2024)
- ML20133M006 + (12:35:39, 12 December 2024)
- ML20133M005 + (12:35:40, 12 December 2024)
- ML20133M004 + (12:35:41, 12 December 2024)
- ML20133M001 + (12:35:41, 12 December 2024)