Responds to NRC Re Violations Noted in Insp Rept 50-298/85-20.Corrective Actions:Revs Will Be Issued to Purchase Orders 231236 & 236067 to Reflect 10CFR21 Applicability & QAI-9 Refresher Training Given
ML20133M036
Person / Time
Site: Cooper Entergy icon.png
Issue date: 09/23/1985
From: Pilant J
NEBRASKA PUBLIC POWER DISTRICT
To: Johnson E
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
Shared Package
ML20133M031 List:
References
CNSS857490, NUDOCS 8510240426
Download: ML20133M036 (2)


Text

P a

e COOPER NUCLEAR STATION P.o. box 98, BRoWNVILLE, NEBR ASKA 68321 Nebraska Pubh.c Power Distn. t Tc'oeso~c m2a2>>m c

CNSS857490 September 23, 1985 M@SDW%

Mr. E. H. Johnson, Chief SEP 2 7 G85 l

Reactor Project Branch I U.S. Nuclear Regulatory Commission

__J J s

Region IV 611 Ryan Plaza Drive Suite 1000 Arlington, TX 76011

Subject:

Nebraska Public Power District Response to IE Inspection Report No.

50-298/85-20

Dear Mr. Johnson:

This letter is written in response to your letter dated August 29, 1985, transmitting Inspection Report No. 50-298/85-20. Therein you indicated that one of our activities was in violation of Nuclear Regulatory Commission requirements. The following is the statement of violation and our response to each in accordance with 10CFR2.201:

1.

Statement of Violation Inadequate Procurement Documents Section 21.31 of 10 CFR Part 21 states, "each individual, corporation, partnership or other entity subject to the regulations in this part shall assure that each procurement document for a facility, or a basic component issued by him, her or it on or after January 6, 1978, specifies, when ap-plicable, that the provisions of 10 CFR Part 21 apply".

Contrary to the above, Purchase Order # 231236 dated September 19, 1984, and Purchase Order F236067 dated January 14, 1985, which were issued for the supply of basic components (i.e., blind flanges and studs), did not specify that the provisions of 10 CFR Part 21 were applicable.

This is a Severity Level V violation (Supplement 1.E.) (298/8520-03)

Corrective Steps Which Have Been Taken and the Results Achieved The District is in agreement with the NRC inspector, that Purchase Orders #231236 (blind flanges) and #236067 (studs) fall within the 10CFR Part 21 definition of a basic component necessary to assure the integrity of the reactor coolant pressure boundary.

Consequently, the respective vendors have been contacted and have Bj 024 26 851011 A

" 9$8 fC-IS3 &f G

. Mr.:1L.H. Johnson

Ssptesbar 23,-1985 Page.2.

verbally indicated that 10CFR Part-21 certification can be provided for the blind flanges and studs furnished to the District under the subject purchase orders.

1 The District, therefore, will issue revisions to Purchase Orders

  1. 231236 and #236067 to reflect 10CFR Part 21 applicability.

Corrective Steps Which Will Be Taken to Avoid Further Violation The root cause of this violation appears to be an incomplete under-standing of. Quality Assurance Instruction #9, (QAI-9), " Guidelines for Establishing Quality Classifications of Components and Mate-rials", by-Engineering personnel involved in procurement of safety-related equipment. Thus, to prevent recurrence, applicable Engi-neering personnel will receive refresher-training focused primarily on QAI-9.

No further corrective actions beyond those discussed above are planned at this time.

' Date When Full Compliance Will be Achieved Full compliance will be achieved by December 1,1985.

If you have any questions regarding this response, please contact me.