Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20133N124 + (12:26:15, 12 December 2024)
- 05000369/LER-1985-026-01, :on 850911,vendor-employed Minor Exposed in Excess of Quarterly Dose Limit of 125 Mrem.Caused by Individual Misrepresenting Age to Work in Radiation Control Area.Birth Dates Will Be Verified + (12:26:24, 12 December 2024)
- 05000331/LER-1985-039, :on 850918,RCIC-to-vessel Inject Valve BN-20-2512 Failed to Open on Demand.Possibly Caused by Unnecessarily High Setting of Valve Torque Switch.Switch Placed at Lower Setting + (12:26:27, 12 December 2024)
- ML20133N121 + (12:26:28, 12 December 2024)
- IR 05000909/2010019 + (12:26:29, 12 December 2024)
- ML20133N118 + (12:26:30, 12 December 2024)
- ML20133N117 + (12:26:31, 12 December 2024)
- IR 05000613/2007015 + (12:26:32, 12 December 2024)
- IR 05000461/1985041 + (12:26:59, 12 December 2024)
- ML20133N113 + (12:27:00, 12 December 2024)
- ML20133N111 + (12:27:02, 12 December 2024)
- ML20133N112 + (12:27:02, 12 December 2024)
- ML20133N109 + (12:27:03, 12 December 2024)
- ML20133N110 + (12:27:03, 12 December 2024)
- IR 05000715/2009030 + (12:27:04, 12 December 2024)
- ML20133N105 + (12:27:05, 12 December 2024)
- ML20133N106 + (12:27:05, 12 December 2024)
- ML20133N104 + (12:27:06, 12 December 2024)
- ML20133N101 + (12:27:07, 12 December 2024)
- ML20133N103 + (12:27:07, 12 December 2024)
- IR 05000306/1985017 + (12:27:08, 12 December 2024)
- ML20133N098 + (12:27:09, 12 December 2024)
- IR 05000271/1985020 + (12:27:21, 12 December 2024)
- ML20133N096 + (12:27:22, 12 December 2024)
- ST-HL-AE-1426, Forwards Response to Draft SER & FSAR Items Re NSSS Scope of Equipment qualification.Marked-up Encl FSAR Pages Will Be Incorporated in Future Amend to FSAR + (12:27:23, 12 December 2024)
- ML20133N095 + (12:27:23, 12 December 2024)
- ML20133N093 + (12:27:24, 12 December 2024)
- ML20133N092 + (12:27:24, 12 December 2024)
- ML20133N091 + (12:27:26, 12 December 2024)
- ML20133N090 + (12:27:27, 12 December 2024)
- ML20133N085 + (12:27:28, 12 December 2024)
- ML20133N086 + (12:27:28, 12 December 2024)
- PY-CEI-NRR-0308, Clarifies Position Re Testing & Insp to Be Performed Following 100 H Preoperational Testing of Tdi Diesel Generators.Turbocharger W/Highest Recorded Exhaust Temp During Longest Continuous Full Load Run Will Be Inspected + (12:27:29, 12 December 2024)
- ML20133N077 + (12:27:30, 12 December 2024)
- ML20133N076 + (12:27:30, 12 December 2024)
- ML20133N075 + (12:27:31, 12 December 2024)
- ML20133N070 + (12:27:32, 12 December 2024)
- ML20133N074 + (12:27:32, 12 December 2024)
- U-600295, Forwards Response to 850913 Request for Addl Info Re NRC Concurrence to Terminate Overinsp Program for Electrical Hangers,Hvac Duct & Duct Supports & Cable Tray,Conduit & Cable Terminations + (12:27:33, 12 December 2024)
- ML20133N068 + (12:27:34, 12 December 2024)
- ML20133N067 + (12:27:34, 12 December 2024)
- ML20133N066 + (12:27:35, 12 December 2024)
- ML20133N064 + (12:27:36, 12 December 2024)
- ML20133N065 + (12:27:36, 12 December 2024)
- ML20133N060 + (12:27:37, 12 December 2024)
- ML20133N057 + (12:27:38, 12 December 2024)
- ML20133N059 + (12:27:38, 12 December 2024)
- JPN-97-002, Provides Correction to 961223 Response to RAI Re Analyses at Power Uprate Conditions + (12:27:39, 12 December 2024)
- ML20133N055 + (12:27:41, 12 December 2024)
- B11732, Forwards Startup Test Rept,Cycle 7. Criticality Achieved on 850630 & 100% Power Reached on 850711 Following end-of-Cycle 6 Refueling Outage + (12:27:42, 12 December 2024)
- ML20133N052 + (12:27:42, 12 December 2024)
- ML20133N051 + (12:27:43, 12 December 2024)