Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- IR 05000321/1985027 + (12:00:38, 12 December 2024)
- ML20134A241 + (12:00:38, 12 December 2024)
- ML20134A239 + (12:00:39, 12 December 2024)
- U-600206, Forwards Results of Analysis of Unresolved Item 85016-07 Re Central File Storage Facility Developed During 850726 Exit Meeting.Detailed Schedule for Completion of Corrective Actions Will Be Forwarded by 850815 + (12:00:40, 12 December 2024)
- ML20134A237 + (12:00:40, 12 December 2024)
- ML20134A235 + (12:00:41, 12 December 2024)
- ML20134A233 + (12:00:42, 12 December 2024)
- ML20134A232 + (12:00:42, 12 December 2024)
- ML20134A229 + (12:00:43, 12 December 2024)
- TXX-4527, Submits Results of Study to Verify Proper Coordination & Selective Tripping of Breakers & Fuses Required for Safe Shutdown Circuits & Power Supplies in Response to NRC Question 010.33.Summary of Findings Provided + (12:00:44, 12 December 2024)
- ML20134A228 + (12:00:44, 12 December 2024)
- BSEP-85-1869, Suppls Response to Violations Noted in Insp Repts 50-324/85-19,50-325/85-19,50-324/85-22 & 50-325/85-22. Corrective Actions:Loose/Missing Bolts Investigated & Trouble Tickets Written + (12:00:45, 12 December 2024)
- ST-HL-AE-1422, Forwards Response to Draft Ser/Fsar Items Re Section 3.11 Concerning Environ Design of Mechanical & Electrical Equipment.Encl marked-up FSAR Pages Will Be Incorporated in Future FSAR Amend + (12:00:46, 12 December 2024)
- ST-HL-AE-1487, Responds to Draft SER or FSAR Item Re Question 430.16N Concerning Breaker Coordination Drawings.Drawings Will Not Be Incorporated in FSAR + (12:00:50, 12 December 2024)
- ML20134A222 + (12:00:50, 12 December 2024)
- ML20134A219 + (12:00:51, 12 December 2024)
- ML20134A217 + (12:00:52, 12 December 2024)
- ML20134A216 + (12:00:52, 12 December 2024)
- ML20134A215 + (12:00:53, 12 December 2024)
- B11814, Forwards Revised Deviation Request from Branch Technical Position Cmeb 9.5-1 Re Auxiliary Bldg - Separation Criteria, Per SER Open Item 14.3 on Safe Shutdown Capability + (12:00:54, 12 December 2024)
- ML20134A212 + (12:00:54, 12 December 2024)
- B11815, Forwards Response to NRC Request for Addl Info on SER Confirmatory Item 58 Re Emergency Diesel Generator Fuel Oil Storage & Transfer Sys + (12:00:55, 12 December 2024)
- ML20134A208 + (12:00:56, 12 December 2024)
- ML20134A205 + (12:00:57, 12 December 2024)
- ML20134A204 + (12:00:57, 12 December 2024)
- ML20134A202 + (12:00:58, 12 December 2024)
- ML20134A200 + (12:00:59, 12 December 2024)
- ML20134A198 + (12:00:59, 12 December 2024)
- ML20134A197 + (12:01:00, 12 December 2024)
- ML20134A196 + (12:01:00, 12 December 2024)
- ML20134A195 + (12:01:02, 12 December 2024)
- ML20134A193 + (12:01:03, 12 December 2024)
- ST-HL-AE-1494, Forwards Response to Draft SER & FSAR Open/Confirmatory Items,Including Item Q430.118N Re ESF Load Sequencer Reliability Analysis.Info Will Be Included in Future FSAR Amend + (12:01:03, 12 December 2024)
- ML20134A189 + (12:01:04, 12 December 2024)
- 05000254/LER-1996-025-01, :on 961220,discovered Original Value for Strainers Head Loss Incorrect.Cause Could Not Be Determined. Training Provided for Operators to Recognize Pump Cavitation During Design Basis Accidents + (12:01:06, 12 December 2024)
- ML20134A186 + (12:01:07, 12 December 2024)
- IR 05000302/1985040 + (12:01:08, 12 December 2024)
- PNO-II-85-097, on 851021,notification Received That Reactor Will Be Shut Down for Approx 8-10 Days to Repair Boot Seal Between Condenser & Low Pressure Turbine.Region II Will Conduct Routine Followup + (12:01:09, 12 December 2024)
- ML20134A182 + (12:01:10, 12 December 2024)
- ML20134A181 + (12:01:10, 12 December 2024)
- ML20134A179 + (12:01:11, 12 December 2024)
- ML20134A178 + (12:01:12, 12 December 2024)
- ML20134A177 + (12:01:12, 12 December 2024)
- ML20134A175 + (12:01:15, 12 December 2024)
- IR 05000346/1985032 + (12:01:16, 12 December 2024)
- ML20134A171 + (12:01:16, 12 December 2024)
- 05000254/LER-1996-025, Forwards LER 96-025-00 Re Operability Calculations Performed on ECCS Suction Strainers W/Incorrect Head Loss Values + (12:01:20, 12 December 2024)
- B11804, Forwards Reviews of Integrated Safety Assessment Program Topic 1.45, Sys Interactions, Including Discussion of Safety Objective & Evaluation of Plant Design,Per 850517 Commitment.Topic Provides Status of USI A-17 + (12:01:21, 12 December 2024)
- PNO-III-85-028D, decontamination Activities at Licensee Lab Facility Successfully Completed.Site Released for Unrestricted Use.Low Level Transuranic Waste Transferred to Mound Lab or Bmi for short-term Storage + (12:01:21, 12 December 2024)
- ML20134A167 + (12:01:22, 12 December 2024)
- IR 05000277/1985039 + (12:01:23, 12 December 2024)
- ML20134A160 + (12:01:24, 12 December 2024)