Requests Response to Listed Interim Review Questions Re Module 5, Operations,Organization & Administration, Submitted for Evaluation on 850819.Response Requested by 851101
ML20134A237
Person / Time
Site: Vogtle  Southern Nuclear icon.png
Issue date: 10/29/1985
From: Walker R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Foster D
GEORGIA POWER CO.
References
NUDOCS 8511040295
Download: ML20134A237 (4)


Text

c- y- ,

0 ../

y r ,k OCT 2 91985 feorgiaPowerCompany-ATTN: Mr. D. O. Foster .

Vice President and General Manager Route 2, Box 299A Waynesboro, GA .30830

=

Dear Mr. Foster:

~

SUBJECT:

V0GTLE READINESS REVIEW - INTERIM REVIEW QUESTIONS -

MODULE NO. 5 "0PERATIONS ORGANIZATION AND ADMINISTRATION" We have completed an initial review' of the subject module which you submitted to us on August 19, 1985, for evaluation. As a result of this initial review,

~t he following questions and coments have been generated which need clarifi-cation.and a written response.

1. On page 6 of-the Commitment Matrix please clarify if the first FSAR reference should be 13.5.1.'1.N rather than 13.5.1.2.G. The commitment

_ subject is ECCS Outage Data Procedures.

'2. On page 35 of the Commitment Matrix, the commitment with regard to Q420.5 should state that the analysis will be provided concurrent with the.

setpoint methodology in lieu of the first quarter of 1985.

3. The comitment " Settlement Monitoring Program," on page -34 does not correctly reflect the agreements reached with the applicant on this subject. The matrix should be revised to correctly identify.the moni-toring commitments that cover specific settlement markers to be monitored, frequency of surveying, need for monitoring following unusual events -(e.g., earthquake or large . fluctuation in groundwater levels), and allowable total and differential settlement limits as described in the

. applicant's letter-of May 21, 1985, and in the June 1985, SER in Sections 2.5.4.4.3 and 2~5.4.5..

lIt appears the commitment matrix should also include a subject for permanent groundwater monitoring. The applicant has committed to numerous features of the monitoring program in FSAR Sections 2.4.12, 2.4.5 and in_ response to question 241.10. In addition to the FSAR, details of the program are also contained in the Groundwater Supplement

- and the Geotechnical Verification -Work Report transmitted by letters, Bailey to Denton, dated May 21, 1985, and August 23, 1985, respectively.

The groundwater monitoring program will be controlled by a License

. Condition, the draft of which is to be provided in SER Supplement No. 1.

4.- Section 3.4, " Commitment Matrix," Table 3.0-1, " Commitments for Plant

- Operations", page 2, ANSI N45.2.9-1972 should be changed to read ANSI l145.2.9-1974.

l 4 j f

001 3 9 1985 Georgia Power Con aany 2

5. Section 3.5, " Implementation Matrix," Table 3.0-2, " Implementing Documents for Operations," pages 4 and 5 reference FSAR Commitment 1.9.38 which endorses ANSI N45.2.2-1975. Page 1.9-36 of the FSAR lists the endorsed tsNSI Standard as N45.2.2-1972. Pages 4 and 5 of the table should be changed to reflect the correct date of 1972.

6.- The commitment in Table 3.0-1 by the applicant, to provide a Reactor Vessel Material Surveillance Program for Vogtle is acceptable as stated on page 34, Q241.1. In addition, the applicant should commit to operating the reactor vessel in accordance with pressure temperature limits.. The pressure temperature limits must consider the effect that neutron irradiation has on the fracture resistance of the Vogtle reactor vessel belt-line materials and must be calculated in accordance with the requirements of Appendix G, 10 CFR 50. The amount of neutron irradiation damage should be calculated using the methodology recommended by the staff in Regulatory Guide 1.99. These commitments appear to be related to plant operation and should be identified in Section 3.4 for Module 5.

Please review these comments and questions and provide a written response.

Your input is requested to be received on or before November 1, 1985. In view of NRC review schedule requirements, we also request a telecon for clarifi-cation and explanation of these questions as soon as you are able to respond.

Please coordinate this telecon with W. H. Rankin (404-221-4197) of my staff.

Your assistance in responding to this request for additional information is appreciated.

Sincerely, ORIGINAL SIGNED BY

- VIRGIL L. BROWNLEE Roger D. Walker, Director Division of Reactor Projects cc:!.J.R Kelly,ExecutiveVice j President

4. E. Conway, Senior Vice President Nuclear Power di. H. Gregory, III, General Manager, Vogtle Nuclear Construction G. Bockhold, Jr., General Manager -

Nuclear Operations vl. T. Gucwa, Chief Nuclear Engineer vifuble t A. Thomas, Vice President-Licensing Vogtle Project cc: (Continued on page 3)

t-OCT E 91985 Georgia Power Company 3 cc: dd Groover, Quality Assurance Site Manager

- vC. W. Hayes, QA Manager _

J. T. Beckham, Vice President

& General Manager - Operations L

d.A. Bailey,ProjectLicensing Manager 4eorge F. Trowbridge, Esq.

Shaw, Pittman, Potts and Trowbridge d ruce W. Churchill, Esq.

Shaw, Pittman, Potts and Trowbridge

/ Ernest L. Blake, Jr. , Esq..

I. Shaw, Pittman, Potts and Trowbridge vdames E. Joiner, Troutman, Sanders, Lockerman and Ashmore v0ames G. Ledbetter, Comissioner Department of Human Resources vCharles H. Badger, Office of Planning and Budget, Management Review Division deppish Kirkland, III, Counsel Office of the Consumer's Utility Council v0ouglas C. Teper, Georgians Against Nuclear Energy 4.aurie Fowler, Legal Environmental Assistance Foundation 41m Johnson, Executive Director Educational Campaign for a Prosperous Georgia vNorton B. Margulies, Esq., Chairman Administrative Judge, Atomic Safety a

dr.ndLicensingBoardPanel Oscar H. Paris, Administrative Judge Atomic Safety and Licensing Board Panel

/Gustave A. Linenberger Jr., Administrative Judge, Atomic Safety and Licensing Board Panel

/ Billie P. Garde, Citizens Clinic Director Government Accountability Project bec: (See page 4)

I:

OCT 2 91995 Georgia Power Company 4 bec: Reis, ELD M. Hill, IE l J}. Miller, NRR iW. Brach, ED0 A. F. Gibson, RII M.'Sinkule, RII W. Rankin, RII iM C Resident Inspector Document Control Desk State of Georgia l

RII RII RII RII D

! WHRankin: MSinkule VLBr wnlee AFGi son /:

-10/Sf/85 10/gv /85 10(b/85 104(/85/

. . . .. ._