Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20134G763 + (09:27:37, 12 December 2024)
- ML20134G764 + (09:27:37, 12 December 2024)
- ML20134G762 + (09:27:38, 12 December 2024)
- 05000296/LER-1985-020-01, :on 850721,walkdown of Core Spray Sys Revealed Missing Pipe Support.Caused by Engineer Error.Line Seismically Qualified Except for LOCA-induced Torus Hydrodynamic Loads.Hanger to Be Installed + (09:27:39, 12 December 2024)
- NSD-NRC-96-4881, Responds to RAI Re AP600 Design Certification Program + (09:27:41, 12 December 2024)
- ML20134G758 + (09:27:42, 12 December 2024)
- ML20134G757 + (09:27:43, 12 December 2024)
- ML20134G756 + (09:27:43, 12 December 2024)
- RBG-21824, Forwards Rev to FSAR Resolving Recently Identified Inconsistency Re Structural Welding Code Requirements.Rev Will Be Included in Future FSAR Amend.No Changes to Tech Specs Required + (09:27:44, 12 December 2024)
- ML20134G753 + (09:27:45, 12 December 2024)
- ML20134G752 + (09:27:46, 12 December 2024)
- ML20134G750 + (09:27:46, 12 December 2024)
- ML20134G749 + (09:27:47, 12 December 2024)
- ML20134G745 + (09:27:48, 12 December 2024)
- 05000409/LER-1985-015, :on 850726,scram Occurred from Approx 0.06% Power.Caused by Indicated Flux Spike When Range Switch on Nuclear Instrumentation Channel 5 Was Upscaled.Range Switch Contacts Cleaned.Switch Elimination Planned + (09:27:49, 12 December 2024)
- ML20134G742 + (09:27:50, 12 December 2024)
- ML20134G740 + (09:27:51, 12 December 2024)
- 05000255/LER-1985-008, :on 850723,plant Shutdown Occurred Due to Inoperable Control Room Emergency Air Cleanup Sys.Caused by Removal of Exhaust Fan Ducting Leading to Unisolable Path to External Environ.Drawings Review Planned + (09:27:53, 12 December 2024)
- L-96-296, LER 96-S02-00:on 961011,failed to Terminate Access of Temporary Licensee Employee.Caused by Cognitive Personnel Error.Security Unassigned Card Key & Plant Administrative Procedure 0010509 Revised + (09:27:54, 12 December 2024)
- ML20134G734 + (09:27:55, 12 December 2024)
- ML20134G731 + (09:27:55, 12 December 2024)
- ML20134G730 + (09:27:56, 12 December 2024)
- ML20134G728 + (09:27:57, 12 December 2024)
- ML20134G725 + (09:27:58, 12 December 2024)
- ML20134G727 + (09:27:58, 12 December 2024)
- ML20134G723 + (09:27:59, 12 December 2024)
- ML20134G722 + (09:28:00, 12 December 2024)
- ML20134G720 + (09:28:00, 12 December 2024)
- ML20134G715 + (09:28:01, 12 December 2024)
- ML20134G718 + (09:28:01, 12 December 2024)
- ML20134G714 + (09:28:02, 12 December 2024)
- IR 05000213/1996201 + (09:28:03, 12 December 2024)
- ML20134G709 + (09:28:04, 12 December 2024)
- RBG-21-716, Forwards Proposed Final Draft Tech Specs for Electrical Power Sys,Incorporating Changes Resulting from Tdi Diesel Generator Final Review + (09:28:05, 12 December 2024)
- ML20134G708 + (09:28:05, 12 December 2024)
- ML20134G704 + (09:28:06, 12 December 2024)
- ML20134G703 + (09:28:07, 12 December 2024)
- 05000296/LER-1985-018-02, :on 850724,containment Isolation Occurred During Cold Shutdown Due to Defective Relay Coil Which Tripped Reactor Protection Sys Motor Generator & Caused Fuse Failure.Relay & Fuse Replaced & Signal Reset + (09:28:08, 12 December 2024)
- ML20134G701 + (09:28:10, 12 December 2024)
- RBG-21787, Updates Info Re Qualification Status of Seismic Category I safety-related Equipment.Seismic Qualification for NSSS Equipment Storage Rack F16-E011 Complete.Confirmation Encl Per Format Requested in NRC + (09:28:11, 12 December 2024)
- ML20134G700 + (09:28:11, 12 December 2024)
- ML20134G697 + (09:28:15, 12 December 2024)
- ML20134G692 + (09:28:16, 12 December 2024)
- 05000250/LER-1985-019, On 850721,reactor Protection Sys Actuated, Turbine Tripped & Auxiliary Feedwater Initiated Due to Spurious Low Pressure Signal.Probably Caused by Lightning. Periodic Operability Test Performed + (09:28:17, 12 December 2024)
- ML20134G690 + (09:28:18, 12 December 2024)
- ML20134G689 + (09:28:19, 12 December 2024)
- IR 05000324/1996017 + (09:28:20, 12 December 2024)
- ML20134G686 + (09:28:20, 12 December 2024)
- B16191, Informs NRC of Mgt Changes at Util,Affecting Distribution of Correspondence Re Plant + (09:28:21, 12 December 2024)
- ML20134G683 + (09:28:22, 12 December 2024)
- RBG-21838, Discusses Review of Final Draft Tech Specs.Certifies That Tech Specs Accurately Reflect Plant Design,Fsar & Other Documented Commitments,Per Tm Novak .Affidavit Encl + (09:28:22, 12 December 2024)