GPU Nuclear. Inc.

(

floute 441 South NUCLEAR Post Office Box 480 Middletown, PA 17057-0480 Tel 717-944-7621 (717)948-8005 6710-96-2368 November 04, 1996 t

I TO:

U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, D.C. 20555 l

Dear Sir:

SUBJECT:

Three Mile Island Nuclear Station, Unit 2 (TMI-2)

Possession Only License No. DPR-73 Docket No. 50-320 PDMS Quarterly Report l

l The purpose of this letter is to provide the NRC a sumnury of the activities at TMI-2 during the 3rd quarter of 1996.

l l

During the 3rd quarter of 1996, GPU Nuclear completed the quarterly surveillance of the TMI-2 i

Reactor Building on September 18,1996. No adverse trends of radiological conditions were identified during the inspection. The next inspection of the TMI-2 Reactor Building has been scheduled for December 1996.

The Reactor Vessel temperature monitoring system reported the Reactor Vessel temperatures ranged from 70.l* F on July 1 to 78.1" F on several days during early September. The Reactor Building temperature ranged from 72.5" F on September 30 to 79.5 F on several days during early September.

The largest temperature difference between the Reactor Building and the Reactor Vessel occurred on July 1,1996, when the Reactor Building temperature was 3.6* F greater than the Reactor Vessel temperature.

I i

b 130032 L

9611130345 961104 PDR ADOCK 05000320 R

pon l

i 9

f i

l i

1 l

l

.Significant work activities conducted during the 3rd quarter of 1996 included routine maintenance of l

plant equipment and minor repairs to the ventilation systent Dismantlement of non-radiological equipment continued with the dismantlement and rennval of the Main Transformers.

Please contact John Schork, TMI Licensing Engineer (717) 948-8832 if you have any questions regarding this report.

j Sincerely 1

J. Knubel JSS Vice President and Director, TMI cc:

USNRC TMI Senior Resident Inspector i

USNRC TMI-2 Project Manager USNRC Administrator, Region 1 Sub File 96025 i