ML20134G703

From kanterella
Jump to navigation Jump to search
Forwards Summary of CRGR Activities for Jul 1985.Summary Will Be Included in EDO Weekly Rept to Commission for Wk Ending 850823
ML20134G703
Person / Time
Issue date: 08/27/1985
From: Sniezek J
Committee To Review Generic Requirements
To:
Committee To Review Generic Requirements
References
NUDOCS 8508280041
Download: ML20134G703 (6)


Text

-

AUG 271985 NOTE T0: CRGR MEMBERS MONTHLY REPORT Enclosed is a copy of the sumary of CRGR activities for the o

period July 1 - July 31, 1985. The sumary will be included in the ED0's Weekly Report to the Comission for the week ending August 23, 1985.

Original signed by Ja:::es H. Snissak Jim Sniezek

Enclosure:

As stated Distribution:

VStello JHSniezek DEDR0GR cf ROGR staff Central File PDR(NRG/CRGR) 8508280041 850827 PDR REVGP NRCCRGR t

CORRESPONDENCE PDR

'N[I 0FC :ROGR/S

ROG /D NAME :BG el
S ek DATE :8/ 6/85
8/ /85

DEPUTY EXECUTIVE DIRECTOR FOR REGIONAL OPERATIONS AND GENERIC REQUIREMENTS (DEDR0GR)

Week Ending August 23, 1985 CRGR Attached is a summary of the CRGR activities for the period July 1 through July 31, 1985. Background material on topics reviewed by the Committee and the minutes of CRGR meetings are sent to the Commission. Copies are provided.to the Public Document Room after the NRC has considered (in a public forum) or decided the matter addressed by the documents. Questions concerning this monthly report should be referred to Walt Schwink (492-8639).

O

n D:te: August 23, 1985.

Pag 2 1 of 4

SUMMARY

OF CRGR ACTIVITIES (July 1 through July 31,1985)

Meating No.

Mesting Date (Announcenent CRGR CRGR Recommendation Date)

Agenda Status to ED0 ED0 Action 79 Review, Proposed Revision 2 Pending Additional work needed by both Priority ED0 action taken 7/24/85 of RG 1.99, " Radiation Damage RES and NRR to address new to ensure coordinated to Reactor Vessel" information. CRGR recommended effort by NRR and RES.

to the ED0 that this be given Matter brought to priority effort.

Subsequent to Commission attention by

-Sponsoring Office - RES the meeting, RES requested that SECY-85_262 (July 26,

-Category 2 Item this guide be dropped from 1985 and subsequent memo

_ Issue #121 further CRGR consideration of August 22, 1985, pending coordinated review by NRR and RES.

Briefing, Request to 0MB Complete CRGR strongly encourages staff No action necessary.

for Approval to Continue to to assure that only necessary Impose the Reporting & and reporting and recordkeeping Recordkeeping Requirements requirements are imposed by of 10 CFR 50 NRC.

-Sponsoring Office - NRR

-Category 2 Item

-Item #122 Briefing, Pressure Isolation Complete CRGR suggested staff consider-No action necessary.

Valve Test Requirements ation be given to the develop-ment of better focused PIV

-Sponsoring Office - NRR guidance for the IST reviewers

-Category 2 Item and to assure plant-specific PIV

-Item #123 requirements for operating reactors were carried out con-sistent with NRC backfit procedures (MC-0514).

R

Paga 2 of 4

'Dato: August 23g'1985.

SUMMARY

OF CRGR ACTIVITIES (July 1 through July 31,1985)

Mecting No.

F Meeting Date (Announcement CRGR CRGR Recommendation' l

Date)

Agenda Status to EDO EDO Action J.

j

'79 (Continued)

Review, Proposal for Complete CRGR recommended that-this No action required at Improving Fire Protection issue be forwarded for con-this time because NRR sideration by the Commission has not yet taken a

-Sponsoring Office - NRR after resolution of the con-position on the CRGR

-Category 2 Item cerns raised by the CRGR.

recommendation.

-Issue #117 78 Review, Proposed Requirements Pending CRGR recommended issuance subject ELD review complete; I

7/8/85 Resulting from Resolution to review by ELD.

package approved by EDO of USI A-46, " Seismic for issuance for comment Qualification of Equipment and sent to Commission i

in Operating Plants" for information. No further action necessary l

-Sponsoring Office - NRR at this time.

-Category 2 Item

-Issue #103 Briefing, Recommendations

.Pending Discussion at this briefing No action required at j

on Fire Protection Policy

. was inconclusive.

CRGR this time.

and Program Actions will review this issue at Meeting #79 (7/24/85).

i

-Sponsoring Office - NRR

^

-Category 2 Item

-Issue #117 l

i t

i

.Page 3 of 4 Date: August 23, 1985

SUMMARY

OF CRGR ACTIVITIES-

.(July 1 through July 31,1985)

Mesting No.

Meeting Date (Announcement CRGR CRGR Recommendation Date)

Agenda Status to ED0 ED0 Action-78-(Continued)

Briefing, Proposed New SRP Complete CRGR offered several recom-No action required at' Sections to Address Expansion mendations. relative to the SRP this-time, of Spent Fuel Storage section, but concluded that its issuance (for public comment),

-Sponsoring Office - NRR

-Category 2 Item

-Issue #118 Briefing, NRC Activities Complete The CRGR noted that there No action required at in the Development of NDE anpears to be an extensive this time.

Qualification and Performance menu.of meaningful technical Demonstration Criteria development work ongoing.

Resources should be combined and focused on one path for early and-adequate improvement

-Sponsoring Office - RES in regulatory requirements.

-Category 2 Item

-Issue #120 Review, Proposed Revision Complete Subject to satisfactory staff No action necessary at to 10 CFR Part 50 of resolution of CRGR concerns, the this time because RES Appendix J (Primary Reactor CRGR recommends that the ED0 has not yet taken a Containment Leakage Testing forward the proposed Appendix J position on the CRGR for Water-Cooled Power rule and accompanying RG MS 021-5~

recommendation.

Reactors) to the Commission for approval.

-Sponsoring Office - RES

-Category 2 Item

_ Issue #111

Dato: August 23,.19852 Page 4 cf 4

SUMMARY

OF~CRGR ACTIVITIES (July 1 through July 31,1985)

Meeting No.

Meeting Date CRGR CRGR Recommendation (Announcement

' Status to EDO ED0 Action Date)

Agenda 78 (Continued)

Review, Proposed Amendments Complete-CRGR recommends that the proposed No action required at to 10 CFR 21, Reporting of amendments be issued for public this time because IE-Defects and Noncompliance and comment after modifications are has not yet taken a 10 CFR.50.55(e), Reporting of made. These modifications should position on the CRGR Defects in Design and be coordinated with the R0GR staff.

recommendations.

Construction

-Sponsoring Office - IE

-Category 2 Item

-Issue #119