Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- NSD-NRC-96-4868, Forwards non-proprietary Rev 1 to WCAP-13573 & Proprietary Rev 2 to WCAP-12980, AP600 Passive RHR Heat Exchanger Test Final Rept. Proprietary Rept Withheld (Ref 10CFR2.790) + (09:07:00, 12 December 2024)
- ML20134J905 + (09:07:01, 12 December 2024)
- ML20134J904 + (09:07:02, 12 December 2024)
- IR 05000414/1985028 + (09:07:03, 12 December 2024)
- ML20134J902 + (09:07:04, 12 December 2024)
- NSD-NRC-96-4846, Transmits Proprietary & non-proprietary Versions of Preliminary Rept, Incomplete Rcca Insertion. W Authorization ltr,AW-96-1021 & Affidavit Requesting Info Be Withheld from Public Disclosure Encl + (09:07:05, 12 December 2024)
- BSEP-97-0036, Responds to NRC Re Violations Noted in Insp Repts 50-325/96-16 & 50-324/96-16 on 961027-1207.Corrective Actions:Instrument Rack Related Work Suspended,Esr 96-406 & Site Procedure for Managing Outage Risk Being Revised + (09:07:06, 12 December 2024)
- ML20134J899 + (09:07:06, 12 December 2024)
- ML20134J898 + (09:07:14, 12 December 2024)
- ML20134J895 + (09:07:15, 12 December 2024)
- ML20134J894 + (09:07:16, 12 December 2024)
- ML20134J893 + (09:07:17, 12 December 2024)
- BECO-LTR-96-097, Monthly Operating Rept for Oct 1996 for Pilgrim Nuclear Power Station + (09:07:18, 12 December 2024)
- 05000352/LER-1996-023, :on 950403,FPS Surveillance Tests Not Performed.Caused by Personnel Error.Individuals Involved Disciplined & New Supervisor Assigned to Onsite Fire Protection Group + (09:07:20, 12 December 2024)
- ML20134J890 + (09:07:21, 12 December 2024)
- ML20134J889 + (09:07:22, 12 December 2024)
- 05000245/LER-1997-001-02, :on 970110,liquid Radwaste Effluent Radiation Monitor Declared Inoperable Due to Leaking Automatic Isolation Valves.Valves Repaired + (09:07:24, 12 December 2024)
- ML20134J885 + (09:07:25, 12 December 2024)
- ML20134J884 + (09:07:26, 12 December 2024)
- ML20134J883 + (09:07:27, 12 December 2024)
- ML20134J882 + (09:07:27, 12 December 2024)
- 05000245/LER-1997-001, Forwards LER 97-001-00,documenting Event That Occurred at Millstone Nuclear Power Station,Unit 1 on 970110.Util Commitments Made within Ltr,Listed + (09:07:28, 12 December 2024)
- ML20134J877 + (09:07:29, 12 December 2024)
- ML20134J878 + (09:07:29, 12 December 2024)
- ML20134J875 + (09:07:31, 12 December 2024)
- ML20134J873 + (09:07:32, 12 December 2024)
- ML20134J871 + (09:07:33, 12 December 2024)
- ML20134J870 + (09:07:34, 12 December 2024)
- ML20134J868 + (09:07:34, 12 December 2024)
- ML20134J867 + (09:07:35, 12 December 2024)
- 05000245/LER-1996-053, Forwards LER 96-053-00,documenting Event Occurred at Unit 1 on 961002.Util Will Develop Necessary Procedures to Perform Monthly Source Checks for Monitors & Instrument Calibrs Will Be Performed Monthly to Satisfy TS Requirement + (09:07:36, 12 December 2024)
- ML20134J862 + (09:07:37, 12 December 2024)
- ML20134J863 + (09:07:37, 12 December 2024)
- ML20134J861 + (09:07:38, 12 December 2024)
- ML20134J857 + (09:07:39, 12 December 2024)
- ML20134J856 + (09:07:40, 12 December 2024)
- ML20134J855 + (09:07:41, 12 December 2024)
- ML20134J852 + (09:07:42, 12 December 2024)
- ML20134J850 + (09:07:42, 12 December 2024)
- ML20134J848 + (09:07:43, 12 December 2024)
- 05000368/LER-1996-005, :on 961120,did Not Perform Surveillance Testing of Plant Protective Sys & post-accident Monitoring Instrumentation Due to Inadequate Procedures.Caused by Misinterpretation of TS + (09:07:45, 12 December 2024)
- ML20134J846 + (09:07:46, 12 December 2024)
- ML20134J845 + (09:07:47, 12 December 2024)
- 05000368/LER-1996-004-01, :on 961030,deficient Failure Modes & Effects Analysis for DC Electrical Sys Resulted in Unavailability of Automatic Functions of Plant Protective Sys.Established Administrative Controls + (09:07:48, 12 December 2024)
- HL-5262, Forwards Comments to 960917 NRC Ltr Re Resolution of Spent Fuel Pool Safety Issues + (09:07:49, 12 December 2024)
- ML20134J841 + (09:07:50, 12 December 2024)
- BSEP-85-1445, Forwards Semiannual Radioactive Effluent Release Rept, Jan-June 1985 & Rev 4 to Offsite Dose Calculation Manual + (09:07:51, 12 December 2024)
- ML20134J837 + (09:07:55, 12 December 2024)
- TXX-4253, Responds to NRC Re Violations Noted in Insp Rept 50-445/84-21.Corrective Actions:Deficiency Rept Completed, Operator Retrained & Sys Test Engineer Counseled on Startup Administrative Procedure Requirements + (09:07:55, 12 December 2024)
- ML20134J835 + (09:07:56, 12 December 2024)
- ML20134J834 + (09:07:57, 12 December 2024)