ML20134J835
| ML20134J835 | |
| Person / Time | |
|---|---|
| Site: | Crane |
| Issue date: | 01/28/1997 |
| From: | James Knubel GENERAL PUBLIC UTILITIES CORP. |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| References | |
| 6710-97-2041, GL-91-18, GL-96-06, GL-96-6, NUDOCS 9702120352 | |
| Download: ML20134J835 (1) | |
Text
1
_?
o
/
\\
c.
GPU Nuclear,Inc.
{
~
Route 441 South
(
M dd e wn 1 057 0480 Tel 717-944 7621 j
January 28,1997 6710-97-2041
'{
U. S. Nuclear Regulatory Commission Attn.: Document Control Desk Washington, DC 20555 i
Dear Sir:
Subject:
Three Mile Island Nuclear Station, Unit 1 (TMI-1)
Operating License No. DPR-50 Docket No. 50-289 Generic Letter (GL) 96-06, " Assurance of Equipment Operability and Containment Integrity During Design-Basis Accident Conditions" - Schedule for Responding i
Since our letter dated October 30,1996 which committed to a response by January 28,1997 as requested by the GL, the work efTort for GL 96-06 has experienced a delay. The delay is partly because of the amount of work involved and also because of problems we experienced in applying the GOTHIC computer code (version 5.0e) to model the fan cooler system inside containment. The results of our analyses, which are nearly complete, still need to be documented in a report and design verified. Operability issues are being evaluated promptly in accordance with the guidance in GL 91-18.
As discussed with the TMI Senior Project Manager Bart Buckley, our response will be provided on February 28,1997.
)
Sincerely j
/
4
/ J. Knubel
/
Vice President and Director, TMI j
MRK cc:
NRC Project Manager Administrator, Region I
- NRC Sr. Resident Inspector
'}^'~970212035297012e" PDR ADOCK 05000289 P
PDR;