Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20135B921 + (07:38:15, 12 December 2024)
- 05000315/LER-1985-038, :on 850806 & 23,during Surveillance Testing, ESF Ventilation Sys Charcoal Absorber Banks Inoperable. Caused by Carbon Settling in Banks.Investigation of Event & Generic Implications Underway + (07:38:16, 12 December 2024)
- ML20135B919 + (07:38:17, 12 December 2024)
- ML20135B916 + (07:38:18, 12 December 2024)
- ML20135B908 + (07:38:19, 12 December 2024)
- ML20135B906 + (07:38:20, 12 December 2024)
- ML20135B902 + (07:38:21, 12 December 2024)
- ML20135B900 + (07:38:21, 12 December 2024)
- ML20135B897 + (07:38:22, 12 December 2024)
- 05000304/LER-1985-005-09, :on 850806,discovered That Svc Bus Undervoltage Start of steam-driven Auxiliary Feedwater Pump Not Tested Per Tech Spec Table 4.4-1.Procedure PT-5C Prepared & Will Be Placed on Surveillance Schedule by 851115 + (07:38:24, 12 December 2024)
- ML20135B892 + (07:38:29, 12 December 2024)
- ML20135B888 + (07:38:30, 12 December 2024)
- ML20135B884 + (07:38:31, 12 December 2024)
- ML20135B878 + (07:38:32, 12 December 2024)
- B16257, Forwards Unit 2 readiness-for-restart Worklist,Identifying Currently Known Items to Achieve Readiness for Restart.Plan Encl + (07:38:33, 12 December 2024)
- ML20135B870 + (07:38:36, 12 December 2024)
- ML20135B867 + (07:38:37, 12 December 2024)
- ML20135B865 + (07:38:38, 12 December 2024)
- ML20135B866 + (07:38:38, 12 December 2024)
- 05000333/LER-1996-011-01, :on 961028,both Standby Liquid Control Subsystems Determined Inoperable.Due to Inoperable Pump Discharge Pressure Relief Valves.Slc Sys Pump Discharge Pressure Relief Valve 11SV-39A Was Replaced + (07:38:40, 12 December 2024)
- ML20135B861 + (07:38:41, 12 December 2024)
- ML20135B860 + (07:38:42, 12 December 2024)
- ML20135B858 + (07:38:43, 12 December 2024)
- ML20135B855 + (07:38:44, 12 December 2024)
- ML20135B857 + (07:38:44, 12 December 2024)
- ML20135B853 + (07:38:45, 12 December 2024)
- ML20135B850 + (07:38:46, 12 December 2024)
- ML20135B852 + (07:38:46, 12 December 2024)
- ML20135B849 + (07:38:47, 12 December 2024)
- ML20135B846 + (07:38:48, 12 December 2024)
- ML20135B845 + (07:38:49, 12 December 2024)
- ML20135B840 + (07:38:50, 12 December 2024)
- ML20135B844 + (07:38:50, 12 December 2024)
- ML20135B839 + (07:38:51, 12 December 2024)
- ML20135B838 + (07:38:52, 12 December 2024)
- ML20135B835 + (07:38:53, 12 December 2024)
- B16302, Informs That Senior Operator License SOP-11265 Is No Longer Needed for Ps Fitzgerald,Per 10CFR50.74(a) + (07:38:54, 12 December 2024)
- 05000414/LER-1996-006-02, :on 961101,TS Surveillance for AC Offsite Power Sources Was Missed.Caused by Insufficient Detail in Test Procedure.Quality Improvement Team Has Been Created to Track Short Duration Inoperabilities + (07:38:56, 12 December 2024)
- ML20135B831 + (07:38:58, 12 December 2024)
- ML20135B826 + (07:38:59, 12 December 2024)
- ML20135B825 + (07:39:00, 12 December 2024)
- ML20135B824 + (07:39:01, 12 December 2024)
- ML20135B822 + (07:39:02, 12 December 2024)
- 05000285/LER-1996-011, :on 961030,containment Closure Breached While Moving Fuel.Caused by Failure to Maintain Valves & Follow & Enforce SO-G-20A Requirements.Rev of Policies & Procedures Re Control & Maint of Containment Closure + (07:39:04, 12 December 2024)
- ML20135B817 + (07:39:06, 12 December 2024)
- ML20135B815 + (07:39:07, 12 December 2024)
- ML20135B813 + (07:39:08, 12 December 2024)
- ML20135B814 + (07:39:08, 12 December 2024)
- ML20135B810 + (07:39:21, 12 December 2024)
- ML20135B808 + (07:39:22, 12 December 2024)
- 3F1196-26, Forwards Crystal River Unit 3,Corrective Action Plan Phase II (Mcap) + (07:39:23, 12 December 2024)