Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20135H784 + (06:43:07, 12 December 2024)
- ML20135H783 + (06:43:08, 12 December 2024)
- ML20135H782 + (06:43:09, 12 December 2024)
- ML20135H781 + (06:43:09, 12 December 2024)
- ML20135H780 + (06:43:10, 12 December 2024)
- PY-CEI-NRR-0352, Informs That Feedwater Check Valves N27F559A&B & B21-F032A&B Will Be Tested W/Water & Only Included in Tech Spec Limits for Water Leakage,Per 850917 Discussions.Testing Changes Will Be Reflected in Next Amend to FSAR + (06:43:11, 12 December 2024)
- ML20135H778 + (06:43:11, 12 December 2024)
- ML20135H777 + (06:43:12, 12 December 2024)
- ML20135H775 + (06:43:13, 12 December 2024)
- ML20135H776 + (06:43:13, 12 December 2024)
- IR 05000456/1985042 + (06:43:14, 12 December 2024)
- ML20135H772 + (06:43:15, 12 December 2024)
- IR 05000409/1985013 + (06:43:27, 12 December 2024)
- IR 05000482/1985032 + (06:43:28, 12 December 2024)
- ML20135H767 + (06:43:29, 12 December 2024)
- ML20135H769 + (06:43:29, 12 December 2024)
- ML20135H762 + (06:43:30, 12 December 2024)
- ML20135H764 + (06:43:30, 12 December 2024)
- ML20135H761 + (06:43:31, 12 December 2024)
- IR 05000254/1985025 + (06:43:32, 12 December 2024)
- ML20135H758 + (06:43:33, 12 December 2024)
- U-600255, Forwards Util Responses to State of Il Atty General Comments Re Overinsp Program Termination Requests.Quality of Facility Const & Basis for Decision on Overinsp Program Termination Sufficiently Confirmed by 1984 Data + (06:43:33, 12 December 2024)
- ML20135H755 + (06:43:34, 12 December 2024)
- ML20135H754 + (06:43:35, 12 December 2024)
- ML20135H752 + (06:43:35, 12 December 2024)
- PY-CEI-NRR-0348, Informs of Proposed Deletion of Startup Test 135, MSIV Leakage Control Sys, from FSAR Section 14.2.12.2.59. Preoperational Test Per Section 4 of Reg Guide 1.68 Demonstrates Sys Operability of Design Conditions + (06:43:36, 12 December 2024)
- IR 05000445/1985008 + (06:43:38, 12 December 2024)
- ML20135H747 + (06:43:38, 12 December 2024)
- ML20135H744 + (06:43:39, 12 December 2024)
- ML20135H743 + (06:43:40, 12 December 2024)
- B11640, Forwards Input to SALP Evaluation Process.All Major Const & Test Milestones Met to Support Nov 1985 Fuel Load Date During SALP Assessment Period + (06:43:41, 12 December 2024)
- ML20135H742 + (06:43:41, 12 December 2024)
- PY-CEI-NRR-0314, Forwards FSAR Changes Re Plant Underdrain Sys & Circulating Water Break Analysis.Info Provided to Close Confirmatory Issue 54 Re Flooding Due to Circulating Water Sys Expansion Joint Failure in Turbine Bldg + (06:43:42, 12 December 2024)
- IR 05000312/1985018 + (06:43:45, 12 December 2024)
- ML20135H734 + (06:43:46, 12 December 2024)
- ML20135H736 + (06:43:46, 12 December 2024)
- U-600259, Part 21 & Interim Potentially Reportable Deficiency Rept 55-85-07 Re Seismic Design & Const of Automatic Sprinkler Corp of America,Inc Fire Protection Sys.Initially Reported on 850813.Investigation Continuing + (06:43:47, 12 December 2024)
- ML20135H731 + (06:43:48, 12 December 2024)
- IR 05000401/2008009 + (06:43:49, 12 December 2024)
- PNO-III-85-083, on 850917,leak Observed in East Steam Bypass Line.Transient Power Spike Observed While Attempting to Isolate Line & Open Valve.Cause of Transient Not Determined. Cracked Piping Around Valve Under Investigation + (06:43:50, 12 December 2024)
- ML20135H726 + (06:43:50, 12 December 2024)
- IR 05000401/2007009 + (06:43:51, 12 December 2024)
- ML20135H719 + (06:43:52, 12 December 2024)
- U-600243, Forwards Revs 6 & 3 to Physical Security & Safeguards Contingency Plans,Respectively,Updating & Clarifying Info Re Detailed Security Measures for Physical Protection of Nuclear Power Station.Revs Withheld (Ref 10CFR73.21) + (06:43:53, 12 December 2024)
- IR 05000261/1985027 + (06:43:54, 12 December 2024)
- ML20135H716 + (06:43:54, 12 December 2024)
- U-600261, Forwards Dcrdr Summary Rept. Major Tasks Included in Dcrdr Enumerated.Human Engineering Design Discrepancies Identified by Dcrdr Categorized + (06:43:55, 12 December 2024)
- ML20135H708 + (06:43:56, 12 December 2024)
- ML20135H706 + (06:43:57, 12 December 2024)
- IR 05000341/1985034 + (06:44:00, 12 December 2024)
- ML20135H702 + (06:44:01, 12 December 2024)
- PLA-2537, Forwards Plan & Schedule for Security tie-in of Fifth Diesel Generator Under Const.Plan & Schedule Withheld (Ref 10CFR2.790) + (06:44:01, 12 December 2024)