Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20136F109 + (06:01:18, 12 December 2024)
- ML20136F105 + (06:01:19, 12 December 2024)
- ML20136F103 + (06:01:20, 12 December 2024)
- ML20136F099 + (06:01:21, 12 December 2024)
- ML20136F097 + (06:01:21, 12 December 2024)
- ML20136F096 + (06:01:22, 12 December 2024)
- ML20136F090 + (06:01:22, 12 December 2024)
- ML20136F088 + (06:01:24, 12 December 2024)
- ML20136F087 + (06:01:25, 12 December 2024)
- ML20136F084 + (06:01:25, 12 December 2024)
- ML20136F083 + (06:01:26, 12 December 2024)
- 05000327/LER-1985-049-02, :on 851206,waste Gas Hydrogen & Oxygen Analyzer Monthly Functional Test Not Performed in Oct.Caused by Scheduling Methods Utilized.Scheduling Method Improved to Prevent Recurrence + (06:01:28, 12 December 2024)
- ML20136F073 + (06:01:29, 12 December 2024)
- ML20136F072 + (06:01:30, 12 December 2024)
- ML20136F064 + (06:01:31, 12 December 2024)
- ML20136F063 + (06:01:32, 12 December 2024)
- ML20136F061 + (06:01:33, 12 December 2024)
- ML20136F062 + (06:01:33, 12 December 2024)
- ML20136F057 + (06:01:34, 12 December 2024)
- ML20136F056 + (06:01:35, 12 December 2024)
- ML20136F052 + (06:01:35, 12 December 2024)
- ML20136F051 + (06:01:36, 12 December 2024)
- ML20136F050 + (06:01:37, 12 December 2024)
- 05000348/LER-1997-001-01, :on 970206,TS Ventilation Sys Deficiencies Discovered.Caused by Cognitive Personnel Error.Applicable Procedures Addressing Inadequate Flow Test Revised & Responsible Person Coached on Event + (06:01:38, 12 December 2024)
- ML20136F047 + (06:01:41, 12 December 2024)
- ML20136F046 + (06:01:41, 12 December 2024)
- HBL-85-058, Cancels 851203 & 10 Advance Notifications of Nuclear Waste Shipment.Advance Notification Not Needed Since Quantity of Radioactive Matl Contained in Shipment Does Not Exceed Quantities Listed in 10CFR71.97(b)(3) + (06:01:42, 12 December 2024)
- ML20136F044 + (06:01:42, 12 December 2024)
- ML20136F040 + (06:01:44, 12 December 2024)
- 05000361/LER-1985-050, :on 851018,reactor Trip on Loss of Load Occurred.Caused by Turbine Trip Generated by Spurious High Drain Tank Level on Moisture Separator Reheater T096.Failed Pipe Nipple Replaced + (06:01:46, 12 December 2024)
- ML20136F038 + (06:01:47, 12 December 2024)
- ML20136F036 + (06:01:48, 12 December 2024)
- HBL-85-061, Submits Rept Re Investigation of Radwaste Shipments for Which Notification of Receipt Not Received within 20 Days After Transfer.Formal Notification of Receipt of 851118 & 19 Shipments Received on 851211 & 10,respectively + (06:01:49, 12 December 2024)
- ML20136F032 + (06:01:50, 12 December 2024)
- ML20136F034 + (06:01:50, 12 December 2024)
- ML20136F030 + (06:01:51, 12 December 2024)
- ML20136F026 + (06:01:51, 12 December 2024)
- ML20136F025 + (06:01:52, 12 December 2024)
- ML20136F022 + (06:01:53, 12 December 2024)
- ML20136F021 + (06:01:54, 12 December 2024)
- ML20136F019 + (06:01:55, 12 December 2024)
- 05000304/LER-1985-023-06, :on 851016,during Performance of Technical Staff Special Procedure Involving Dropping ESF Electrical Buses,Containment Isolation Valves Closed.Caused by Procedure Deficiency + (06:01:56, 12 December 2024)
- ML20136F015 + (06:01:57, 12 December 2024)
- ML20136F014 + (06:01:58, 12 December 2024)
- ML20136F012 + (06:01:59, 12 December 2024)
- ML20136F011 + (06:01:59, 12 December 2024)
- ML20136F009 + (06:02:00, 12 December 2024)
- IR 05000354/1985056 + (06:02:03, 12 December 2024)
- ML20136F004 + (06:02:04, 12 December 2024)
- 05000293/LER-1985-029, :on 851018,HPCI Inverter Circuit Failure Alarm & ATWS Trouble Alarm Received in Control Room Due to Breaker Trip.Caused by Fluctuation of Input Voltage.Hpci Inverter Previously Modified + (06:02:06, 12 December 2024)
- ML20136F001 + (06:02:07, 12 December 2024)
- ML20136E999 + (06:02:08, 12 December 2024)