Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- BSEP-85-1461, Responds to Violations Noted in Insp Repts 50-325/85-19 & 50-324/85-19.Corrective Actions:Field Rev 42 Issued to Plant Mod 82-219P to Correct Installation on Support 1SW-142PG409 & Spec 248-107 Revised + (04:30:53, 12 December 2024)
- ML20137G168 + (04:30:54, 12 December 2024)
- IR 05000348/1985030 + (04:30:56, 12 December 2024)
- 3F0397-28, Forwards Request for Addl Info Re Resolution of Unresolved Safety Issue A-46, Verification of Seismic Adequacy of Equipment in Operating Reactors USI A-46 + (04:30:57, 12 December 2024)
- DCL-85-275, Provides Supplemental Response to IE Bulletin 79-23, Potential Failure of Emergency Diesel Generator Field Exciter Transformer. Full Load Test of 24 H Duration Performed on Generators 2-1 & 2-2 + (04:30:58, 12 December 2024)
- ML20137G154 + (04:30:59, 12 December 2024)
- VPN-026-97, Submits Trojan ISFSI Radiation Protection Program to Be Implemented IAW Proposed TS (Pge 1071),Section 5.7.2.1.Info Provided to Facilitate NRC Review of 960326 License Application + (04:31:00, 12 December 2024)
- ML20137G149 + (04:31:02, 12 December 2024)
- ML20137G148 + (04:31:03, 12 December 2024)
- IR 05000440/1985051 + (04:31:04, 12 December 2024)
- ML20137G137 + (04:31:06, 12 December 2024)
- IR 05000483/1997001 + (04:31:07, 12 December 2024)
- ML20137G133 + (04:31:08, 12 December 2024)
- ML20137G131 + (04:31:08, 12 December 2024)
- ML20137G128 + (04:31:09, 12 December 2024)
- ML20137G126 + (04:31:10, 12 December 2024)
- ML20137G116 + (04:31:11, 12 December 2024)
- ML20137G124 + (04:31:11, 12 December 2024)
- ML20137G114 + (04:31:12, 12 December 2024)
- ML20137G112 + (04:31:13, 12 December 2024)
- ML20137G108 + (04:31:14, 12 December 2024)
- ML20137G107 + (04:31:15, 12 December 2024)
- PNO-IV-85-042, on 850819,manual Reactor Trip Occurred When Main Feedwater Pump B Turbine Speed Governor Failed, Causing Transient.Repairs Underway on Leaking Secondary Handhole of Steam generator.One-wk Outage to End 850726 + (04:31:16, 12 December 2024)
- ML20137G103 + (04:31:16, 12 December 2024)
- ML20137G102 + (04:31:17, 12 December 2024)
- ML20137G100 + (04:31:18, 12 December 2024)
- AECM-85-0242, Responds to Violations Noted in Insp Rept 50-416/85-20. Corrective Actions:Plant Administrative Procedure 01-S-06-24, Safety & Environ Evaluations, Revised + (04:31:19, 12 December 2024)
- ML20137G099 + (04:31:19, 12 December 2024)
- PNO-II-85-078, crack Identified on Weld of 3/4-inch Sample Line Running Off RCS Letdown Line.Weld Crack in Identical Location to One Found on 850729.Weld Repaired.Pipe Supports Being Installed + (04:31:21, 12 December 2024)
- ML20137G089 + (04:31:22, 12 December 2024)
- ML20137G085 + (04:31:23, 12 December 2024)
- IR 05000498/1996022 + (04:31:28, 12 December 2024)
- ML20137G081 + (04:31:28, 12 December 2024)
- IR 05000483/1996004 + (04:31:29, 12 December 2024)
- ML20137G077 + (04:31:32, 12 December 2024)
- ML20137G075 + (04:31:34, 12 December 2024)
- ML20137G067 + (04:31:38, 12 December 2024)
- ML20137G066 + (04:31:39, 12 December 2024)
- ML20137G064 + (04:31:40, 12 December 2024)
- ML20137G055 + (04:31:41, 12 December 2024)
- ML20137G056 + (04:31:41, 12 December 2024)
- ML20137G052 + (04:31:44, 12 December 2024)
- ML20137G048 + (04:31:45, 12 December 2024)
- ML20137G049 + (04:31:45, 12 December 2024)
- ML20137G043 + (04:31:46, 12 December 2024)
- ML20137G042 + (04:31:47, 12 December 2024)
- ML20137G038 + (04:31:48, 12 December 2024)
- ML20137G041 + (04:31:48, 12 December 2024)
- IR 05000213/1985016 + (04:31:50, 12 December 2024)
- ML20137G034 + (04:31:51, 12 December 2024)
- ML20137G032 + (04:31:54, 12 December 2024)