Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20137N147 + (03:41:10, 12 December 2024)
- ML20137N145 + (03:41:11, 12 December 2024)
- ML20137N143 + (03:41:11, 12 December 2024)
- ML20137N142 + (03:41:12, 12 December 2024)
- ML20137N139 + (03:41:13, 12 December 2024)
- ML20137N141 + (03:41:13, 12 December 2024)
- CY-97-018, Informs of Organizational Changes at Haddam Neck Plant. Listed Changes Effective 970324 + (03:41:14, 12 December 2024)
- ML20137N134 + (03:41:14, 12 December 2024)
- 05000245/LER-1985-009, :on 850813,reactor Scram Occurred,Initiated by Main Steam Line hi-hi Radiation.Caused by Entrained in Feedwater Sys When Demineralizer Placed in Svc After Cleaning.Plant Procedures Revised + (03:41:16, 12 December 2024)
- ML20137N131 + (03:41:17, 12 December 2024)
- ML20137N128 + (03:41:18, 12 December 2024)
- ML20137N130 + (03:41:18, 12 December 2024)
- ML20137N126 + (03:41:19, 12 December 2024)
- 05000333/LER-1985-008, :on 850301,during 1985 Refueling Outage,Five Penetrations Showed Leakage Possibly Exceeding 0.6La Limit in Tech Spec 4.7.A.2.b.2.Caused by Normal Wear.Valve Repairs &/Or Replacements Successfully Completed + (03:41:21, 12 December 2024)
- ML20137N118 + (03:41:22, 12 December 2024)
- NRC-97-0043, Provides Info Re Recently Identified Issued Involving Effects of Postulated HELBs Inside Containment on EECWs & Utils Basis for Conclusion + (03:41:23, 12 December 2024)
- ML20137N114 + (03:41:23, 12 December 2024)
- ML20137N110 + (03:41:28, 12 December 2024)
- 05000220/LER-1985-010, :on 850815,accidental Initiation of Reactor Bldg Emergency Ventilation Sys Occurred.Caused by Electrical Spike Experienced by Channel 12 Reactor Bldg Ventilation Duct Monitor.Ventilation Sys Reset + (03:41:29, 12 December 2024)
- ML20137N106 + (03:41:31, 12 December 2024)
- ML20137N105 + (03:41:31, 12 December 2024)
- ML20137N101 + (03:41:32, 12 December 2024)
- ML20137N098 + (03:41:33, 12 December 2024)
- ML20137N097 + (03:41:34, 12 December 2024)
- ML20137N093 + (03:41:35, 12 December 2024)
- U-600398, Forwards Justification for Not Installing Heat Tracing to high-range Effluent Monitor Sample Lines Per NUREG-0737,Item II.F.1, Addl Accident Monitoring Instrumentation, & B Siegel 851106 Request + (03:41:35, 12 December 2024)
- ML20137N089 + (03:41:36, 12 December 2024)
- ML20137N091 + (03:41:36, 12 December 2024)
- ML20137N088 + (03:41:37, 12 December 2024)
- IR 05000482/1996021 + (03:41:38, 12 December 2024)
- ML20137N084 + (03:41:38, 12 December 2024)
- ML20137N082 + (03:41:40, 12 December 2024)
- 05000219/LER-1997-002-01, :on 970228,reactor Building Vent Radiation Monitor Setpoints Exceeded TS Limits Due to Personnel Error. Verification Was Performed to Ensure That No Other Incorrect Calibrs Occurred + (03:41:42, 12 December 2024)
- ML20137N080 + (03:41:43, 12 December 2024)
- 05000483/LER-1997-002, :on 970307,missed TS 4.6.3.1 Surveillance of Containment Isolation Valves Following Maintenance Occurred Due to Cognitive Personnel Error.Applicable Requirements Have Been Discussed with Individual Involved + (03:41:44, 12 December 2024)
- ML20137N076 + (03:41:45, 12 December 2024)
- ML20137N075 + (03:41:46, 12 December 2024)
- ML20137N072 + (03:41:47, 12 December 2024)
- ML20137N073 + (03:41:47, 12 December 2024)
- ML20137N071 + (03:41:48, 12 December 2024)
- ML20137N069 + (03:41:49, 12 December 2024)
- NRC-97-0042, Responds to NRC Re Violations Noted in Insp Rept 50-341/96-16.Corrective Actions:Event Was Immediately Corrected When G4100-F015 Was Closed + (03:41:49, 12 December 2024)
- ML20137N067 + (03:41:51, 12 December 2024)
- ML20137N065 + (03:41:52, 12 December 2024)
- ML20137N066 + (03:41:52, 12 December 2024)
- ML20137N061 + (03:41:53, 12 December 2024)
- ML20137N063 + (03:41:53, 12 December 2024)
- ML20137N059 + (03:41:55, 12 December 2024)
- ML20137N058 + (03:41:55, 12 December 2024)
- BSEP-97-0100, Submits Suppl Request for License Amend Applicability & SRs Re Rev of TSs 3.0 & 4.0, & Respective Bases for These Sections to Incorporate Guidance Contained in GL 87-09 + (03:41:56, 12 December 2024)
- ML20137N051 + (03:41:57, 12 December 2024)
- ML20137N054 + (03:41:57, 12 December 2024)