Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- 05000338/LER-1997-001-03, :on 970312,auxiliary Svc Water Pump Bolts Exceeded Design Basis Allowable Due to Personnel Error. Asw Pumps Were Declared Inoperable + (02:26:10, 12 December 2024)
- ML20137S855 + (02:26:11, 12 December 2024)
- ML20137S852 + (02:26:12, 12 December 2024)
- ML20137S850 + (02:26:12, 12 December 2024)
- ML20137S848 + (02:26:13, 12 December 2024)
- ML20137S847 + (02:26:14, 12 December 2024)
- ML20137S845 + (02:26:14, 12 December 2024)
- TAC:57295 + (02:26:15, 12 December 2024)
- ML20137S842 + (02:26:18, 12 December 2024)
- 05000245/LER-1996-063-01, Forwards LER 96-063-01,documenting Event Occurred at Unit 1 on 961126.Commitments Made within Ltr Listed as Submitted + (02:26:21, 12 December 2024)
- ML20137S836 + (02:26:22, 12 December 2024)
- 05000278/LER-1997-002-02, :on 970309,manual Scram Occurred Due to Loss of Forced Reactor Core Circulation at Power as Result of 13kv Feeder Breaker Auxiliary Switch Failure.Auxiliary Switch Assembly Was Cleaned & Lubricated + (02:26:24, 12 December 2024)
- ML20137S832 + (02:26:25, 12 December 2024)
- NG-97-0574, Forwards Revs to Performance Test Schedule for 1996-1999 + (02:26:26, 12 December 2024)
- ML20137S828 + (02:26:26, 12 December 2024)
- ML20137S824 + (02:26:28, 12 December 2024)
- ML20137S823 + (02:26:29, 12 December 2024)
- ML20137S820 + (02:26:30, 12 December 2024)
- 05000245/LER-1997-003-02, :on 970306,svc Water Effluent Was Not Monitored Per Requirements of Ts.Caused by Inadequate Design Change Package.Procedures to Ensure That SW Effluent from Reactor Bldg Operated within Design Basis Revised + (02:26:32, 12 December 2024)
- ML20137S816 + (02:26:33, 12 December 2024)
- ML20137S811 + (02:26:34, 12 December 2024)
- ML20137S812 + (02:26:34, 12 December 2024)
- 05000245/LER-1997-003, Forwards LER 97-003-00 Which Documents an Event That Occurred at Mnps,Unit 1 on 970306,per 10CFR50.73(a)(2)(i). Commitments Made within Ltr,Listed + (02:26:35, 12 December 2024)
- ML20137S806 + (02:26:36, 12 December 2024)
- ML20137S807 + (02:26:36, 12 December 2024)
- ML20137S805 + (02:26:37, 12 December 2024)
- PNO-III-86-012, on 860211,unidentified Primary Sys Leakage Slightly Above Tech Spec Limit.Leakage Associated W/Leakage Past Valve Seats in Portions of Reactor Depressurization Sys.Maint Outage Planned for 860215 to Correct Leakage + (02:26:38, 12 December 2024)
- ML20137S798 + (02:26:40, 12 December 2024)
- ML20137S799 + (02:26:40, 12 December 2024)
- ML20137S793 + (02:26:41, 12 December 2024)
- ML20137S795 + (02:26:41, 12 December 2024)
- ML20137S792 + (02:26:44, 12 December 2024)
- 05000298/LER-1985-007, :on 850823,HPCI Steam Supply Stop Valve Did Not Open During Daily Operation of HPCI Auxiliary Oil Pump. Caused by Pump Low Suction Pressure Turbine Trip.Pump Pressure Switch Tested & Calibr + (02:26:45, 12 December 2024)
- ML20137S790 + (02:26:46, 12 December 2024)
- ML20137S788 + (02:26:47, 12 December 2024)
- ML20137S784 + (02:26:48, 12 December 2024)
- ML20137S782 + (02:26:49, 12 December 2024)
- IR 05000327/1986002 + (03:00:50, 12 December 2024)
- ML20137S776 + (03:00:51, 12 December 2024)
- ML20137S775 + (03:00:52, 12 December 2024)
- ML20137S773 + (03:01:00, 12 December 2024)
- 05000213/LER-1997-007, :on 970311,potential for Svc Water Sys Water Hammer Following Loss of Normal Power Was Noted.Caused Because Original Design of Plant Did Not Identify Potential for Water Hammer.Check Valve Was Installed + (03:01:02, 12 December 2024)
- ML20137S768 + (03:01:03, 12 December 2024)
- ML20137S767 + (03:01:04, 12 December 2024)
- ML20137S764 + (03:01:05, 12 December 2024)
- W3P85-3174, Application for Amend to License NPF-38,consisting of Tech Spec Change Requests NPF-38-08,NPF-38-09,NPF-38-10,NPF-38-11 & NPF-38-12,deleting Core Protection Calculator Addressable Constants & Correcting Typo in ANSI Std 3.1-1978.Fee Paid + (03:01:06, 12 December 2024)
- ML20137S758 + (03:01:07, 12 December 2024)
- PY-CEI-NRR-2155, Application for Amend to License NPF-58,revising TS Surveillance Requirements 3.9.1.1 & 3.9.2.2,extending SR Frequency on Refueling Equipment & one-rod-out Interlocks + (03:01:08, 12 December 2024)
- ML20137S756 + (03:01:09, 12 December 2024)
- ML20137S754 + (03:01:10, 12 December 2024)
- ML20137S753 + (03:01:11, 12 December 2024)