._ _ _ _ - . ..

? SEP 23 19g5

)

Docket No.: 50-443 APPLICANT: Public Service Company of New Hampshire, et al.'

FACILITY: Seabrook Station, Unit 1

SUBJECT:

SUMMARY

OF NRC CASELOAD FORECAST PANEL MEETING AND SITE VISIT TO ASSESS CONSTRUCTION COMPLETION SCHEDULE On September 4,1985, the NRC staff met with the applicant to receive a briefing on construction plans and activities. On Sepember 5, 1985, the staff toured the site and made first-hand observations of the. status of the on-going construction programs. After the tour, the staff met with the applicant to receive further briefing on construction plans and activities and to receive additional clarification of information provided by the applicant on the previous day.

Enclosure 1 is a list of attendees at the meeting. Enclosure 2 is the meeting '

notice and agenda. A handout prepared by the applicant and used as an outline for the September 4,1985 briefing is attached in Enclosure 3.

The purpose of the meeting and tour was to provide the NRC staff an opportunity to make independent observations and conclusions to support the establishment of priorities for the Ifmited personnel resources now available to perform required licensing tasks.

TheapplicantprojectionforSeab'rookUnit-1fuelloadisJune 30, 1986.

Victor Nerses, Project Manager Licensing Branch No. 3 Division of Licensing

Enclosures:

As stated ,

! cc: See next page t

t l

@ Ld&3 l V 5es/es ghton 9/$/85

/85 i

3 k

A D

- _ . _ . . .2, _ _. a . _ . . . _ . . . _ _ . _ _ . _ . _ - . . _ . _ , _. _ . _. _._._.

+, s Mr. Robert J. Harrison Public Service Company of New Hampshire Seabrook Nuclear Power Station cc:

Thomas Dignan, Esq. E. Tupper Kinder, Esq.

John A. Ritscher, Esq. G. Dana Bisbee, Esq.

Ropes and Gray Assistant Attorney General 225 Franklin Street Office of Attorney General Boston, Massachusetts 02110 208 State Hosue Annex Concord, New Hampshire 03301 Mr. Bruce B. Beckley, Project Manager Public Service Company of New Hampshire Resident Inspector Post Office Box 330 Seabrook Nuclear Power Station Manchester, New Hampshire 03105 c/o US Nuclear Regulatory Comission Post Office Box 700 Dr. Mauray Tye, President Seabrook, New Hampshire 03874 Sun Valley Association 209 Sumer Street Mr. John DeVincentis, Director Haverhill, Massachusetts 01839 Engineering and Licensing Yankee Atomic Electric Company Robert A. Backus, Esq. '1671 Worchester Road O'Neil, Backus and Spielman Framingham, Massachusetts 01701 116 Lowell Street Manchester, New Hampshire 03105 Mr. A. M. Ebner, Project Manager United Engineers & Constructors Ms. Beverly A. Hollingworth 30 South 17th Street 7 A Street Post Office Box 8223 Hampton Beach, New Hampshire 03842 Philadelphia, Pennsylvania 19101 William S. Jordan, III Mr. Philip Ahrens, Esq.

Diane Curran Assistant Attorney General Hamon, Weiss & Jordan State House, Station #6 20001 S Street, NW Augusta, Maine 04333 Suite 430 Washington, DC 20009 Mr. Warren Hall Jo Ann Shotwell, Esq. Public Service Company of Office of the Assistant Attorney General New Hampshire Environmental Protection Division Post Office Box 330 One Ashburton Place Seabrook, New Hampshire 03874 Boston, Massachusetts 02108 Seacoast Anti-Pollution' League D. Pierre G. Cameron, Jr., Esq. Ms. Jane Doughty General Coun'el s 5 Market Street Ptblic Service Company of New Hampshire Portsmouth, New Hampshire 03801 Post Office Box 330 Manchester, New Hampshire 03105 Mr. Diana P. Randall 70 Collins Street Regional Administrator, Region I Seabrook, New Hampshire 03874 U.S. Nuclear Regulatory Comission 631 Park Avenue King of Prussia, Pennsylvania 19406

Public Service Company of Seabrook Nuclear Power Station New Hampshire cc:

Mr. Calvin A. Canney, City Manager Mr. Alfred V. Sargent,

~

City Hall Chairman 126 Daniel Street Board of Selectmen Portsmouth, New Hampshire 03801 Town of Salisbury, MA 01950

. Ms. Letty Hett Senator Gordon J. Humphrey Town of Brentwood U. S. Senate RFD Dalton Road Washington, DC 20510 Brentwood, New Hampshire 03833 (Attn: TomBurack)

Ms. Roberta C. Pevear Senator Gordan J. Humphrey Town of Hampton Falls, New Hampshire 1 Pillsbury Street Drinkwater Road Concord, New Hampshire 03301 Hampton Falls, New Hampshire 03844 (Attn: Herb Boynton) )

Ms. Sandra Gavutis Mr. Owen B. Durgin, Chairman Town of Kensington, New Hampshire Durham Board of Selectmen RDF 1 Town of Durham East Kingston, New Hampshire 03827 Durham, New Hampshire 03824 Charles Cross, Esq.

Chaiman, Board of Selectmen Shaines, Mardrigan and Town Hall McEaschern South Hampton, New Hampshire 03827 25 Maplewood Avenue Post Office Box 366 Mr. Angie Machiros, Chairman Portsmouth, NH 03801 Board of Selectmen for the Town of Newbury Newbury, Massachusetts 01950 Mr. Guy Chichester, Chaiman Rye Nuclear Intervention Ms. Cashman, Chairman Committee Board of Selectmen c/o Rye Town Hall Town of Amesbury 10 Central Road Town Hall Rye, New Hampshire 03870 Amesbury, Massachusetts 01913 Jane Spector Honorable Richard E. Sullivan Federal Energy Regulatory l Mayor, City of Newburyport Consnission Office of the Mayor 825 North Capital Street, NE City Hall Room 8105 Newburyport, Massachusetts 01950 Washington, D. C. 20426 Mr. Donald E. Chick, Town Manager Mr. R. Sweeney Town of Exeter New Hampshire Yankee Division 10 Front Street Public Service of New Hampshire Exeter, New Hampshire 03823 Company 7910 Woodmont Avenue Mr. William B. Derrickson Bethesda, Maryland 20814 Senior Vice President Public Service Company of New Hampshire Post Office Box 700, Route 1 Seabrook, New Hampshire 03874

____r.44 A __

k

[(O?-N/c Enclosure 1 h,.;in.eA GzcA&wA Gw ,,:&

9 ; ; ;b;; .,L ~ ;? y'

//, Ajens ec /uzep/ztz oc /uss K:.h.

h C L= R N r N Ps. : REGicN Z S. er D ef IJEQ A'2K N .- BB"'3 CA f65 fnC6.hth=,s_c x ,= z 4

z. ,

wan...,.- . . .-

. +  ;,

QI4 U t-

'~

<.fC64.,70 /I,/ U l rd. $so'&c Y b 6 Da ve) A. V/a cc0> ane f YN3O Asd boy /% ,/'

L>/-,) 7vn.,c- u g-i --

frnnb G. f'fC')csin /V.llY SYor 5,.' /U. (/ './ ,

D o tM1_t E Moob 4 NNY STA T\ cd M Af) A 45R.

D ?oa s $. 6et N-1 Nll k*r .if lo~th JiJ l GxE/Ik /2 AW l} 'Ni-l? O !!s : :n ,' n we y.- U- o .< a s y,'q,? ,' y #, . y .,:,,

.g,J.

Jolw 6. 5 fft NN v' srerep in.un es wm OMaa d' Ac.e J'e UEy'd- Supev. fi ?

b S~rew L. S.aur UEi c.,  % cv % .a 11:s vs.: .

! e v\mau % en %s saa- em basa-i. .s <uacy wf aerus.1x a+ca be, $Ams't AlH ^ EN6 Maut, Lact M S M ce

,r ,/- ,ei,,

n'

=

, . - . _ ._ y - . - _ , . - - , . _ _ _ . . _ , _--

', 4 Enclosure 2

[ b, UNITED STATES 8"3# 'i NUCLEAR REGULATORY COMMISSION 7; j WASHINGTON, D. C. 20555

'*E .I , , , M 2 51985 Docket No. 50-443/444 MEMORANDUM FOR: George W. Knighton, Chief

- Licensing Branch No. 3 Division of Licensing FROM: Victor Nerses, Project Manager Licensing Bran:h No. 3, Division of Licensing

SUBJECT:

FORTHCOMING NRC CASELOAD FORECAST PANEL VISIT TO SEABROOK 1 AND 2 SITE DATE & TIME: September 4 and 5, 1985 September 6, 1985 9:00 am - 4:00 pm 9:00 am - 11:45 am (if required)

LOCATION: Education Center Seabrook Station Seabrook, New Hampshire PURPOSE: Assess status of construction and completion schedule for Seabrook Station (meeting agenda enclosed).

PARTICIPANTS: NRC PSHN C Knighton Derrickson R. Hartfield J. De Vincentis -

T. Cerne R. Sweeney, et al.

V. Nerses, et al.

\

&w Victor Nerses, Project Manager Licensing Branch No. 3 Division of Licensing cc: See next page gp?ipii;;Q pp.

Note: NRC meetings are open to interested members of the public to attend as observers. Members of the public who wish to attend this meeting must contact V. Nerses (301/492-7238) no later than 3:45 pm August 30, 1985. (The NRC generally does not have access authority to allow members of the public to attend the station tour portion of the meeting. This authority resides with PSNH who has responsi-bility to maintain physical security and proprietary infonnation.

Therefore~,. admission of the public to the Seabrook construction site is at the discretion of PSNH. For further infonnation about access to the site-tour, contact the site representative, Mr. Sanchez at 603-474-9521 ext.2487.)

\ '

Seabrook Mr. Robert J. Harrison President and Chief Executive Officer Public Service Company of New Hampshire Post Office Box 330 Manchester, New Hampshire 03105 Thomas Dignan, Esq. E. Tupper Kinder, Esq.

John A. Ritscher, Esq. G. Dana Bisbee, Esq.

Ropes and Gray Assistant Attorney General 225 Franklin Street Office of Attorney General Boston, Massachusetts 02110 208 State Hosue Annex Concord, New Hampshire 03301 Mr. Bruce B. Beckley, Project Manager Public Service Company of New Hampshire Resident Inspector Post Office Box 330 Seabrook Nuclear Power Station Manchester, New Hampshire 03105 c/o US Nuclear Regulatory Commission Post Office Box 700 Dr. Mauray Tye, President Seabrook, New Hampshire 03874 Sun Valley Association 209 Sunner Street Mr. John DeVincentis, Director Haverhill, Massachusetts 01839 Engineering and Licensing Yankee Atomic Electric Company Robert A. Backus, Esq. 1671 Worchester Road O'Neil, Backus.and Spielman Framingham, Massachusetts 01701 116 Lowell Street Manchester, New Hampshire 03105 Mr. A. M. Ebner, Project Manager United Engineers & Constructors Ms. Beverly A. Hollinoworth 30 South 17th Street 7 A Street Post Office Box 8223 Hampton Beach, New Hampshire 03842 Philadelphia, Pennsylvania 19101 William S. Jordan, III -

Mr. Philip Ahrens, Esq.

Diane Curran Assistant Attorney General Harmon, Weiss & Jordan State House, Station #6 1 20001 S Street, NW Augusta, Maine 04333 Suite 430 Washington, DC 20009 .

Mr. Warren Hall Jo Ann Shotwell, Esq. Public Service Company of Office of the Assistant Attorney General New Hampshire Environmental Protection Division Post Office Box 330 One Ashburton Place Manchester, New Hampshire 03105 Boston, Massachusetts 02108-Seacoast Anti-Pollution League D. Pierre G. Cameron, Jr., Esq. Ms. Jane Doughty General Counsel 5 Market Street Public Service Company of New Hampshire Portsmouth, New Hampshire 03801 Post Office Box 330 Manchester, New Hampshire 03105 Mr. Diana P. Randall 70 Collins Street Regional Administrator - Region I Seabrook, New Hampshire 03874 i

U.S. Nuclear Regulatory Commission 631 Park Avenue King of Prussia, Pennsylvania 19406

_ _ _ _ _ _ . _. 2 . _ . _ _ - - _ .

Mr. Calvin A. Canney, City Manager Mr. Alfred V. Sargent.

City Hall Chairman 126 Daniel Street Board of Selectnen Portsnouth, New Hampshire 03801 Town of Salisbury, MA 01950 Ms. Letty Hett Senator Gordon J. Humphrey Town of Brentwood U. S. Senate RFD Dalton Road Washington, DC 20510 Brentwood, New Hampshire 03833 (Attn: Tom Buracki Ms. Roberta C. Pevear P

Senator Gordan J. Humphrey Town of Hampton Falls, New Hampshire 1 Pillsbury Street Drinkwater Road Concord, New Hampshire 03301 Hampton Falls, New Hampshire 03844 (Attn: Herb Boynton) -

Ms. Sandra Gavutis Mr. Owen B. Durgin, Chairman Town of Kensington, New Hampshire Durham Board of Selectmen RDF 1 Town of Durham Easi: Kingston, New Hampshire 03827 Durham, New Hampshire 03824 '

Chairman, Board of Selectmen Charles Cross, Esq.  ;

Town Hall Shaines, Mardrigan and McEaschern South Hampton, New Hampshire 03827 25 Maplewood Avenue i Mr. Angie Machiros, Chairman Post Office Box 366  !

Portsmouth, NH 03801 Board of Selectmen for the Town of Newbury Newbury, Massachusetts 01950 Mr. Guy Chichester, Chainan 4

Rye Nuclear Intervention Ms. Rosemary Cashman, Chairman Committee Board of Selectmen c/o Rye Town Hall '

Town of Amesbury 10 Central Road Town Hall Rye, New Hampshire 03870 Amesbury, Massachusetts 01913 [

Jane Spector Honorable Richard E. Sullivan Federal Energy Regulatory Mayor, City of Newburyport Commission Office of the Mayor 825 North Capital Street, NE i

City Hall Room 8105 Newburyport, Massachusetts 01950 Washington, D. C. 20426 i Mr. Donald E. Chick, Town Manager Mr. R. Sweeney Town of Exeter- New Hampshire Yankee Division 10 Front Street Public Service of New Hampshire 7 Exeter, New Hampshire 03823 Company i

}

7910 Woodmont Avenue Mr. William B. Derrickson Bethesda, Maryland 20814 l Senior Vice President i Public Service Company of New Hampshire  !

Post Office Box 700, Route 1  !

Seabrook, New Hampshire 03874 l

8

3 ,

SEABROOK Caseload Forecast Agenda

1. Overview of project construc'. ion and preoperational testing schedule, including progress and majo" milestones completed, current problems and any anticipated problem areas that may impact the current pro,1ected fuel load date. (Include inpact because of the inability tn achieve full funding by January 1985 and thereafter.)
2. Detailed review and current status of design and engineering effort (by major discipline), incit. ding any potential problems that may arise from necessary rework. (Inci'ide impact of SARS changes and status of cable tray bracing and support changes.)
3. Detailed review and current status of procurement activities, including valves, pipe, instruments, cable, major components, spare p.trts, etc.
4. Actual and proposed craft work force (by major craft), craf t availability, productivity, potential labor negotiations and problems.

5 >. Detailed review and current status of all .large and small bore pipe hangers, restraints, snubbers, etc., including design, rework, procurement,

- fabrication, delivery and installation. (Discuss impact of approval /non-approval of proposal to waive ASME code stamping of Class 2 and 3 NF supports.)

6. Detailed review of project schedule identifying critical path items, near critical items, amount of float for various activities, the current critical path to fuel loading, methods of implementation of corrective action for any activities of negative float, and provisions for contingencies. The estimated project percent complete as well as the method used as of.

June 15, 1985.

7. Detailed review and current status of bulk quantities, including current

' estimated quantities, quantities installed to date, quantities scheduled to date, current percent complete for each, actual versus forecast installation rates, in cubic yards /mo., linear feet /mo., or number /mo., and l

basis for figures.

(a) concrete (CY)

(b) Process Pipe (LF) .

- Large Bore Pipe (2 1/2" and larger)

- Small Bore Pipe (2" and smaller)

(c) Yard Pipe (LF)

(d) Large Bore Pipe Hangers, Restraints, Snubbers (ea)

(e) Small Bore Pipe Hangers Restraints (ea)

(f) Cable Tray (LF)

i e 2-(g) Total Conduit (LF)

(h) Total Exposed Metal Conduit (LF)

(i) Cable (LF) -

- Power

- Control

- Security

~

- Instrumentation

- Plant Lighting r (j) Terminations (ea) I'

- Power ~

- Control

- Security

- Instrumentation

- Plant Lighting .

(k) Electrical Circuits (ea)

- Power

. - Control

- Security

.., (1) Instrumentation (ea)

8. Detailed review and current status of preparation of preop and acceptance  ;

test procedures, integration of preop and acceptance test activities with 4 construction schedule, system turnover schedule identifying each sys' a and status, preop and acceptance tests schedule identifying each test i and status, current and proposed preop and acceptance tests program l manpower. i (a) Total number of procedures required for fuel load.  !

(b) Number of draft precedures not started.

(c) Number of draft procedures being written.

(d) Number of procedures approved.

(e) Number of prrcedures in review.

(f) Total number of preop and acceptance test required for fuel  ;

load identifying each.

(g) Number of preop and acceptance test completed identifying each. *

~(h) Number of preop and acceptance tests currently in progress identifying each and status.

(i) Number of systems and/or subsystems turned over to start-up identifying each. '

(k) Number of systems turned over to Operations Group, identifying

  • each system and the outstanding open items for each system.

(k) Number of retest expected, if any, identifying each retest and the cause for retest.

9. Detailed discussion of potential schedular influence due 'to changes attributed to NUREG-0737 and other recent licensing requirements. ,

L e

I b

, < r- . - , - - - - - -- - , -

10. Discussions -of _ schedular impact, if any, regarding potential deficiencies reported in accordance with 10 CFR 50.55(e).
11. Overview of current construction and startup management organization showing interfaces between the two. (Discuss status of BIP turnover schedule with particular emphasis on potential adverse impact on schedule of I+C and HVAC system turnover delays). 9
12. Detailed review and current status of design, engineering and construction effort including quantities, work-off rates and completion schedule for:

(a) ~ATWS design changes (b)

(c) High Pipe energy (line break stress as-built) (HELB).

analysis (d) N-stamp certification program (e) Updating drawings and specifications to as-built conditions

{f) Environmental qualification of safey-related equipment (g) Seismic qualification of safety-related equipment

.,, (h) Radiation Monitoring System (i) Solid waste handling system (j) HVAC Systems

13. Detailed review of room / area turnover schedule and status. (Discuss impact of lump-sum work in specific buildings -- eg: diesel generator, cooling tower, et. al.)

14 Review of open punch list items by category (hardware / paper. work) identifying each and the work-off rates vs add on-rate. (Provide discussion of Project Completion System for major open items and the overall trend for open items on the Imcomplete Items List).

15. Discuss status of USNRC Reg. Guide 1.97 qualification and-QA Program
16. Detailed review and discussion of. work remaining in containment  ;

including quantities, installation rates and schedules for completion.

17. Detailed: review and current status of power accession testing procedures

- and operational procedures.

a. Power accession test procedures including safety-related and nonsa fety-rela ted.

~

1. Numbers required.
2. Numbers not started
3. Numbers in preparation and approval process
4. Numbers approved ,

i .

Operating procedures required for fuel loading; including station b.

administrative, station operational, surveillance (e.g. technical specification), maintenance and emergency procedures. -

/ -i -

1. Numbers required
2. Numbers not started
3. Numbers in preparation and approval process 4 Numbers approved
18. Detailed review and current status of permanent station and support staffing, training and licensing.
a. Staffing for Unit 1 operation, including presently employed, projected and authorized for each group reporting to the Vice President, Nuclear Production (Reference FSAR Fig.13.1-1).
b. Staffing of Unit 1 station organization including presently employed contracted, projected, and authorized for each organization subgroup

, (Reference FSAR Fig. 13.1-5).

c. Training program, outstanding training courses required prior to-fuel load, identify job titles, numbers of personnel, and projected completion.

4

d. Operator and senior operator licenses presently onsite, contracted, projected, and required for fuel loading.
19. Site tour and observation of construction activities.
20. Discussion of the status of the as-engineered /as-constructed verifi-cation programs being conducted as part of the ASME Completion Program (eg Bulletin 79-14 stress analyses) and other construction completion programs (eg: beam verification, TP-8, TP-10) l l

1

_. .. ,. . . . _ . . - . . . . - , - . , . _ . , _ _ , , - _ _ _ _ . _ . . ~ - _ _ . _ _ ~ _ _ _ - _ ~ - . . -

Erclosure 3

)

~^

Project Status .,

Seabrook Station Unit 1 1 For The l NRC Caseload Forecast l September 4,1985 .

====  ;

i i

o P

i l

I l l l

3 4

Highlights e Project On Schedule And Under Budget e Secondary Hydro Complete e Ccid Hydro Completed 3 Weeks Ahead Of Schedule e ASME Piping installation Complete e 35 Operators Licensed .

O Circulating Water System Test in Progress e Approximately 270 BIPs Turned Over in Last Year e Essentially On Schedule For June 30,1986 Core Load e Buildings Essentially Complete include:

Chlorination Building Fire Pump House intake / Discharge Structures Circulating Water Pump House Cooling Tower Diesel Generator Building

+

h 1

7 e e t.1 f

) aC l E5 )

8E% ww SE m

s

@3*4.i s"'M.<.

v g=U q==M

  • <U L E b "

b CW . .

w H

W m

O 79 at E I;p. 7.

O a a c.

O d. v: g C5 Eo Og "

J'"E$i-"

95 "N050 3" voO O 'r -

s-cgG 3OO . . , ,f 5 l O

a5x -  : a d ofw c xe 2g,g ggz "

G if w

W E _S C W

) S- 5"x c "55 d Eh'5 Es O gs v

a ' s 3

7

(= C-h,wep w .w [ $

a 4

$C

=c-

.f 4

(

< 'x w '3 E'v%V ;

- < e Su mg ec 4, ,

,e c-c a

. w S.c w.

- a."

r< s.e s

=

g g / / ,;;w.

~

G v //.7 " f e, M  !:- a::

w a v SE  ! sin!

S' MNuag?8 5  ! M SME3f EE  !

,pg I

i l

h_

m y

gs8'

.E we Mgs o"5cs wc w= c r b

!!!% i:

e 34' .;

.aR O" s y W N-

$ I:$i:!;i:

ac 82 8  ?:!$:h:!

  • y, . . <

M~ g .

, u

q U U w . . . . .

m C ,

O

> hVNOl10Nnd 10H I >

o -

o 2 . Z y e ee e .G 4 4 9 9 9 @ # *# -

O O o o o o P P w O,o.

y. o y

a 1 5 5

~

N 1 M g $ 1M O C 0+O

--O E $'

e c. o . a z} -

__a m; gU s

______ g __p__p______

- t>1p p

o -

8

=w0 8

< e o G, a a ep 1

s!; : -

'o 8<

- p i V EM -

pg y E y _

CO $

i i

v E

I I I MI 1

i Eli J  !. d, a , - -

2g II (I{ (I S2 -

~U U o

$Z -

s E

" g oQ -

E! J e=

1.u < <

@ E 2 C. C.

l

_ J6 s6 a6 s6 s6 a6 ,6 _

l O LLJ W Cw Q C L1J C .JC C L1J

  • g l c CC WW c WM ws wg WW2 e e C= >-- D a &D > en - r- =

" <* <c c <o C wC <C O

=0 o o 3=c ,

B=c 5em 3:c "

l l

e5 C co e

-m

s. 9 - E

-as.

E s

C e

O s.a S l

L1J L- C <

2 4

C.

O J c 5 =. c C C =E p

x 5

E o $

o o

o e d c=

e C W

g c m a

=

l07.S v -

T L O3 7, ..'v01 ~.0d.,...es h,ea,CrJGE Mallda JDl! l d' C031DICB pa.

. .,.,m..

.t .,i .

1I iI iiI l 1I 8/25/85

' i I i if- t..

I i.I i I i Civil Wd , . .. - ,- 93  !

Large Bare Pice ---==

-m - -

98 Land he fells 'e-- A-

'l' m" 97 Lage b Han ers h =

$ l;j 84 Small Bare t.pe ,- m - ii jt 93 Smill B:re Haneers 3A 73 Csle f ra'. ,L .--- ---- - ----- ------ 99 Rigil Condui! l

'A-- -- " ---- - l SF "

88  ;

1 Cable i a 90

. , . + -s f, h[ (f, i

d . 1 .n " m: s '- ...a' *'

.-.V -

Instruaen! Trav I I s. E 88 lastrumea! Tubini nM 88 HVAC Du.:!/HanSers =

~ - = * ~ ~~" ~ - -

6 s e E 83 lasulaica gg 5 R. . . .

0 10 20 30 40 50 60 70 80 90 !00

. Percent Complete BASli 7/35 Tage! Budge! [Jph!e Nc! lacluding lamp Sum Scope e

o I

Seabrook Unit 1 & Common BlP TURNOVERS Data Through 8/30/85 100_ . .. ........ ... .. ........... ... ...m .. .. ...... .. ..

/

esses. Scheduled ._. ue.'j #'g o " ,,,,.,.,.,.,.,.,.,,,,,,,,,j.

j

/

j ....

o 90_ - Actual o"n=== / /

s*,,,o f

f .

__--= ,/ l fe

~

a --

n = _=---

= -

i p

/

p g

l80_ f _

= Core Load l

/

.p

~~

/p# 1 -

(8/30/84 Estimate) j

@ 70_ / 75.7 % _. / Core Complete -~

j Load S

c)

- /,,/ Hot. /

0-60-. / . Functional $ (7/24/85

/ Estimate)

Testin

._ _ _ D. /,

/

  • , o i

~


^_; l> l 50 ---

I I I I I I I I I I I I I I 'I I A M J'J A S .O N D J F M A M J J 1985 198G 2

Seabrook Station Unit 1 and Common Phase 1 Tests Schedule vs Actual DATA DATE 8/30/85

'~~'

90_

/

---hLoad Ore g 80_ /A Tar 0et i Hot

.e 70-58.1% / Functional O.

E 60- Y,/

.O /

+ Q S0- '

,i 3

\

c 40_ , 52.3%

0) Actual U- 30 O- 20- -' Sch eduled ------

10_ Actual O_ ~

l l l l l l l l l l l l l l l l l l l l l l 1 I I I I A M J J A S O N l DlJ F M A M J J A S O N DlJ F M A M J J A S 1984 1985 1986 MONTHS

! Scal) rook Station Unit 1 and Common INCOMPLETE ITEMS - TOTAL (Status / Trend) ------- CONSTRUCTION

. 5000 -

- STARTUP/ TEST

- ENG./ 0.A.

..,.._a1-

=a W

<1000 - '

= - ' " " , - _

3000-1 2000 - , , , ,,g, i - ,===-.

.,, , ,~ ~ ~ ~ ~ - - - - ~ ~ . , ,,a 1000 -  % ~~'

n - ,_a ss " "" ~ ~~ ~ ,, - - x ,--

3 JAN l FEB l MAR l APR l MAY l JUN l JUL [ AUG l SEP 1985

Status as of 8/30/85

. ~

.v SEABROOK STATION UNIT 1 and COMMON HOT FUNCTIONAL STARTUP STATUS

~

1985 MAY JUN JUL l AUG l SEP OCT NOV COMMISSION CW FLOW and CW TESTING & N0ZZLE INSTALLATION TUNNELS TRANSIENT TESTING l CT SPRAY BYPASS I SW SYSTEM TESTING TIE - IN FILL CT (

G & lO  !

SG EDDY CURRENT TESTING J TUDE REPLACEMENT

\

N W '

i l

i STEAM GENERATOR DR\Y LAY UP FILL SG WET LAY UP l \ jHFT FEEDWATER SYSTEM PilASE I TESTING l ,, PREPS FOR HFT I

CONTAINMENT AIR llANDLING j

, PilASE I TESTING l /

CVCS FLUSillNG lif0R0'S & ClllLLER OPERATIONS l I

[ DATA DATE 8/29/85 SSPS PliASE I TESTING ,

SSPS - PT & ASSOC TESTSI i

[

a P

9

\

SEABROOK STATION UNIT 1 and COMMON PROGRESS ON MAJOR ITEMS FOR HOT FUNCTIONAL ll0T l FUNCTIONAL SIM CENEIMI0nS  :: .

C i O i- *

  • PRESSunilER 8 HC P's INSULATION C O--Ol O!
  • nnNG ' '

G  !

i Oi .

I  : -

I  :

I SUPPORTS i O .

1 l . .

1 -' . . '

O i.

SYS. TURNOVERS .

l .

l .-

I .

HVAC d!! -

inuci a nuca insuiannui , . ..

1985 APR MAY JUN l JUL AUG SEP OCT NOV DEC STATUS DATE

Seabrook Unit 1 & Common Project Population (8/30/85)

Craft Workers 2998 Non-Manual

- Engineering 799

- OA/QC 518

- Startup 187

- Construction 603

- Security 118

- Other (Management a 221 Administration Services)

- -Non-Manual Total 2446 SUB-TOTAL PROJECT 5444 NHY Operations 575 TOTAL PROJECT E019 1

l -

O n .b

22 Oj@@i> WCH1x FOIros Essbrook Station Unit 1 & Comromen Work Force 6000

'Non- Manual 5000 -'-

/. -

p . . . . . . .

Manual 4000 ,-

jg- '

e 3000 - ' ~ ~ "

d

._.;-7 a.

=:an

=

.e

xs 2000 -

~

lll y"7pp m  ; .

.....= = .

1000 - + ., " % u n ~~wuuw =m -

nAu aif", .*

i:s gg Er si -

a:; ..

. . . . . u. . . ..=s.

1/1 2/1 3/1 4/1 5/1 6/1 7/1 8/1 9/1 1985 COG 9 CEG0GXCCECj C000V @gixsrfefidema @ese: @fE@/@@

0 0

Seabrook Station Unit 1 and Common Significant Licensing Activities DATA DATE 8/30/85 1985 1986 J A S O N D J F M A M J J A S O N D

$ l . O FinalTech Specs From NRC d FSAR Ammendment 55 l E SER Supplement 3 i

! A FSAR Consistency Review ,

! A Fire Protection Audit

'! d Equipment Qualification Audit i d As Duill Audit

@  ! O Special Nuclear Material License

! A A Readiness Assessment Team Audit

, d 8 Region One Letters To NRC A close ^ ' SER Open items O soumittai Issuance Draft License d Target Receive Operating License f

Areas Under Management Review e HVAC Completion e Cable Tray Bracing e HangerCompletion Activities e Project Management Transition (Construction To Operation) e Emergency Planning m

9 0

l l

i l

o. ,

c Schecu_c-e Com o armon O

@sabaeek/20& meas /CaEmway/MeM Cassh Number of Months 20

..u: :a::

. - -. s . .. . . . . . . . . . . . . II-

".4ii' sis!I e

n::nse: - - -

?!!g i5: slf; :mi sn.:.ini;is.. j!'iGi!!!!!!i! tii;i

...n::: ::n.. -~ :: m. --e: ;n:.n:t:r:

un:::::.:ru:: :.s:t
- . . 5k . ..k - *T. ...! ik ne~.tue:m:~:- 1. n : nut.n~.::
u. " ' ' ' e I.I!.!..iii! INN.I..!~~'.;3I .I E"

]f s .iii.h. i...

u .::i.::.

.. :..:;ii.:

.,.ii . ..

9;isci;;;igie:tr . . . .ma :,. u,,,mni-12 ~!!! !r!!c;~"F!

.ac:n.::: ~nn::nv!!!:

10 8 '

~

.~.-.'-

6 .SiEEs* .,WN++

~m . m,~a ..

aw, .

4 m~m

  • Mgz m r==w

.g? M

  1. s ;29

=-

+n W- . g 2 *##

mzw. T l;:?;:

    1. D Cz"w.h'J;} _f*-

-cw-mm-r< '(

r g+e &-BW-t M- E; m:A...a*

.+wis :uan Thm;m=+

0 Seabrook 1 St.Lucie 2 Callaway 1 Wolf Creek A Hydro-HFT I- 1HFT-Loa tmti Coreload-C.O.

@GEIIPNf2 @@2Gd @e F/84/@@ UgD@GOG @00tGEO ((AGCEED))

SEP 2 31985 l

MEETING

SUMMARY

DISTRIBUTION Docket: No(s): : 50-443 -

. NRC PDR Local PDR i NSIC PRC System 1 LB3 Reading  ;

Attorney, OELD GWKnighton Project Manager VNerses JLee NRC PARTICIPANTS V. Nerses A. Cerne G. W. Knighton R. Hartfield l

bec: Applicant & Service List 1

._. _. . . _ . _ _ - _ . . . _ -___ _ . - .-