Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20138B078 + (01:11:43, 12 December 2024)
- B11785, Forwards Addl Info Re Proof & Review Tech Specs,In Response to Listed Requests.Tech Specs Include Items 3/4.6.1.7 Re Containment Ventilation Sys & 3/4.3.2 Re ESFAS Instrumentation + (01:11:44, 12 December 2024)
- ML20138B075 + (01:11:45, 12 December 2024)
- ML20138B074 + (01:11:45, 12 December 2024)
- AECM-86-0065, Corrected Special Rept 84-028/0 Re Div I Generator Trip Caused by Overheating of Linear Reactor.Statement in Paragraph 4 Should Read Reactors Are Rated for an Inlet Air Temp of Approx 120 F + (01:11:48, 12 December 2024)
- ML20138B066 + (01:11:49, 12 December 2024)
- ML20138B070 + (01:11:49, 12 December 2024)
- ML20138B065 + (01:11:50, 12 December 2024)
- ML20138B064 + (01:11:51, 12 December 2024)
- ML20138B062 + (01:11:51, 12 December 2024)
- U-600347, Requests Exemption for Two Postulated Pipe Breaks in RHR HX Cubicles from SRP Section 3.6.1 to Resolve Flooding Issue. FSAR Will Be Revised to Reflect Change + (01:11:52, 12 December 2024)
- ML20138B061 + (01:11:52, 12 December 2024)
- ML20138B059 + (01:11:53, 12 December 2024)
- ML20138B058 + (01:11:53, 12 December 2024)
- ML20138B057 + (01:11:54, 12 December 2024)
- AECM-85-0326, Application for Amend to License NPF-29,supplementing 850823 Request.Amend Supports Design Change Scheduled During Planned Outage in Oct 1985 + (01:11:55, 12 December 2024)
- PNO-IV-86-009A, on 860313,10-ton UF6 Cylinder Overfilled. Caused by Improperly Positioned Lever on Scale at Filling Station.Scale Repaired & Recertified by Mcelheny Scale Co. Personnel Interviews Expected to Be Completed on 860317 + (01:11:55, 12 December 2024)
- ML20138B051 + (01:11:57, 12 December 2024)
- ML20138B050 + (01:11:57, 12 December 2024)
- ML20138B049 + (01:11:58, 12 December 2024)
- ML20138B046 + (01:11:58, 12 December 2024)
- ML20138B044 + (01:12:00, 12 December 2024)
- ML20138B042 + (01:12:01, 12 December 2024)
- ML20138B043 + (01:12:01, 12 December 2024)
- ML20138B041 + (01:12:02, 12 December 2024)
- 05000321/LER-1997-003-01, :on 970325,RBM Operability Requirements Did Not Match Rod Withdrawal Error Analysis Assumptions Resulting in Disparity Between Core Analysis Design Procedure Assumptions & TS Requirements.Changes to TS Prepared + (01:12:04, 12 December 2024)
- ML20138B036 + (01:12:05, 12 December 2024)
- ML20138B034 + (01:12:05, 12 December 2024)
- ML20138B033 + (01:12:06, 12 December 2024)
- U-602730, Informs NRC That Wd Romberg Has Become Assistant Vice President of Illinois Power + (01:12:07, 12 December 2024)
- ML20138B032 + (01:12:07, 12 December 2024)
- ST-HL-AE-5627, Responds to NRC Re Violations Noted in Insp Rept 50-499/97-01.Corrective Actions:Rv Vacuum Fill Procedure Was Revised Prior to 1RE07 or Next Entry Into Reduced Inventory Operations & Vent Valves on Temporary Manifold Evaluated + (01:12:08, 12 December 2024)
- ML20138B028 + (01:12:08, 12 December 2024)
- ML20138B025 + (01:12:09, 12 December 2024)
- ML20138B019 + (01:12:10, 12 December 2024)
- ML20138B014 + (01:12:11, 12 December 2024)
- ML20138B016 + (01:12:11, 12 December 2024)
- ML20138B013 + (01:12:12, 12 December 2024)
- ML20138B011 + (01:12:16, 12 December 2024)
- ML20138B010 + (01:12:17, 12 December 2024)
- ML20138B008 + (01:12:18, 12 December 2024)
- ML20138B003 + (01:12:19, 12 December 2024)
- ML20138B006 + (01:12:19, 12 December 2024)
- ML20138B002 + (01:12:20, 12 December 2024)
- ML20138B001 + (01:12:21, 12 December 2024)
- TAC:56002 + (01:12:22, 12 December 2024)
- ML20138A999 + (01:12:24, 12 December 2024)
- AECM-86-0036, Responds to NRC Re Violations Noted in Insp Rept 50-416/85-46.Corrective Actions:Sys Operating Instruction 04-1-01-E12-L, RHS Sys Changed to Address Use of Shutdown Cooling in Operational Condition 2 + (01:12:25, 12 December 2024)
- PY-CEI-NRR-0418, Provides Addl Info on Overall Mgt Commitment & Involvement in Control of Plant Activities Through Initial Licensing & Power Ascension Program to Full Power Operation.Issuance of OL for Unit 1 Requested for 851219 + (01:12:27, 12 December 2024)
- ML20138A995 + (01:12:29, 12 December 2024)
- ML20138A994 + (01:12:30, 12 December 2024)