Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- PNO-V-85-068, on 851003,while Operating at 50% Power,Reactor Trip Occurred After Loss of Electric Power.Three Reactor Coolant Pumps Restarted by Resetting Pump Circuit Breaker Lockout Relays.Cause Under Investigation + (01:10:05, 12 December 2024)
- 05000369/LER-1997-001-03, :on 970318,failure to Comply W/Ts 3.6.3 Requirements Following Valve 1CF-26AB Inoperability Was Identified,Due to Misinterpretation of Reference Documents. Application of TS to Valve Was Clarified + (01:10:06, 12 December 2024)
- ML20138B205 + (01:10:07, 12 December 2024)
- ML20138B203 + (01:10:08, 12 December 2024)
- ST-HL-AE-1372, Forwards Responses to Questions 210.02 Through 210.07,per 850806 Request for Addl Info.Info Concerns Piping,Supports & Valves in Cooling Loops of Spent Fuel Pool Cooling & safety-related Instrument tubing.Marked-up FSAR Pages Encl + (01:10:08, 12 December 2024)
- ML20138B200 + (01:10:09, 12 December 2024)
- ML20138B199 + (01:10:10, 12 December 2024)
- PY-CEI-NRR-0415, Provides Addl Info & Summarizes Previously Supplied Info Re Limited Application of Silicone Sealants on ESF HVAC Ductwork (Reg Guide 1.52).Justification for Sealant Use & Qualification Program Description Encl + (01:10:10, 12 December 2024)
- 05000293/LER-1997-006, :on 970321,inadvertent Group Three Isolation Occurred While Troubleshooting 125 Volt Dc Ground on Battery a as Result of Relay Race When Circuit Breaker D4-8 Was Cycled.Electrical Print Reviewed & Verified + (01:10:12, 12 December 2024)
- ML20138B193 + (01:10:13, 12 December 2024)
- IR 05000293/1986001 + (01:10:46, 12 December 2024)
- ML20138B186 + (01:10:56, 12 December 2024)
- ML20138B187 + (01:10:56, 12 December 2024)
- ML20138B185 + (01:10:57, 12 December 2024)
- ML20138B182 + (01:10:58, 12 December 2024)
- ML20138B183 + (01:10:58, 12 December 2024)
- ML20138B180 + (01:10:59, 12 December 2024)
- ML20138B178 + (01:10:59, 12 December 2024)
- U-600355, Confirms That Calculations Using NUREG/CR-2913 for Subcooled Water Jets & Extrapolation of NUREG/CR-2913 Data for Pressures Outside Applicable Range Not Performed. Calculations Will Be Clarified in Future FSAR Amend + (01:11:00, 12 December 2024)
- ML20138B176 + (01:11:00, 12 December 2024)
- AECM-85-0306, Responds to Request for Addl Info Re 850812 Application for Amend to License NPF-29.Prompt Resolution of Questions & Approval of Previously Submitted Tech Specs Needed for Outage Scheduled to Start on 851012 + (01:11:01, 12 December 2024)
- ML20138B172 + (01:11:02, 12 December 2024)
- ML20138B171 + (01:11:02, 12 December 2024)
- BECO-85-178, Provides Schedule to Implement Requirements of Final ATWS Rule (10CFR50.62) + (01:11:03, 12 December 2024)
- ML20138B169 + (01:11:04, 12 December 2024)
- ML20138B167 + (01:11:05, 12 December 2024)
- ML20138B165 + (01:11:06, 12 December 2024)
- 05000254/LER-1997-007-03, :on 970331,unit One Emergency DG Inadvertently Started Due to Error by RSO While Operating Control Switch. Nso Removed from All Licensed Duties Until Completion of Remediation Plan + (01:11:07, 12 December 2024)
- ML20138B163 + (01:11:08, 12 December 2024)
- 3F1085-04, Responds to 850830 Request for Confirmatory Info Re NUREG-0737,Item II.K.3.30, Small Break LOCA Methods & Use of CRAFT-2 Code.Util Concurs W/B&W Position on NUREG-0565 Concerning Noncondensible Gases + (01:11:09, 12 December 2024)
- ML20138B162 + (01:11:09, 12 December 2024)
- ML20138B159 + (01:11:10, 12 December 2024)
- W3P85-2696, Submits Proposed Schedule for Meeting Reporting Requirements of 10CFR50.62(c)(1) & (c)(2) Re ATWS Final Rule (Generic Ltr 85-06).Implementation of Rule Requires Installation of Diverse Scram Sys & Turbine Trip Prior to Outage Completion + (01:11:10, 12 December 2024)
- ML20138B156 + (01:11:11, 12 December 2024)
- ML20138B154 + (01:11:12, 12 December 2024)
- ML20138B150 + (01:11:13, 12 December 2024)
- ML20138B152 + (01:11:13, 12 December 2024)
- ML20138B148 + (01:11:14, 12 December 2024)
- ML20138B149 + (01:11:14, 12 December 2024)
- ML20138B146 + (01:11:15, 12 December 2024)
- ML20138B143 + (01:11:16, 12 December 2024)
- ML20138B145 + (01:11:16, 12 December 2024)
- U-602732, Forwards Correction to Attachment 8 to Ltr of Response to NOV Contained in Insp Rept 50-461/96-09 + (01:11:18, 12 December 2024)
- ML20138B139 + (01:11:18, 12 December 2024)
- ML20138B135 + (01:11:19, 12 December 2024)
- ML20138B137 + (01:11:19, 12 December 2024)
- ML20138B134 + (01:11:20, 12 December 2024)
- AECM-85-0233, Forwards Weir Wall Overflow Probability Analysis. Because of Very Low Probability of Occurrence & Leak of Safety Significance for Worst Case Postulated Overflow (Ref AECM-85/0046),corrective Actions Not Warranted + (01:11:21, 12 December 2024)
- ML20138B128 + (01:11:21, 12 December 2024)
- B11994, Requests Exemption from Requirements of App J to 10CFR50. Util Has Initiated Detailed Evaluation of Scope & Schedule for Mods Required to Achieve Compliance W/App J as Part of Facility Isap + (01:11:22, 12 December 2024)
- BECO-85-179, Informs of Organizational Changes Affecting Tech Spec Figures 6.2.1 & 6.2.2.Application for Amend Will Be Submitted After Final Organizational Change Complete + (01:11:22, 12 December 2024)