ML20138B148
| ML20138B148 | |
| Person / Time | |
|---|---|
| Site: | Pilgrim |
| Issue date: | 03/13/1986 |
| From: | Wenzinger E NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I) |
| To: | Harrington W BOSTON EDISON CO. |
| Shared Package | |
| ML20138B153 | List: |
| References | |
| NUDOCS 8603200289 | |
| Download: ML20138B148 (2) | |
See also: IR 05000293/1986001
Text
.
._
~_
_
_
-_.
. .
__
. ._
. _
e.
.
s,A
MAR 131986
Docket No. 50-293
Boston Edison Company M/C Nuclear
ATTN: Mr. William D. Harrington
Senior Vice President, Nuclear
800 Boylston Street
,
Boston, Massachusetts 02199
Gentlemen:
Subject:
Inspection Report No. 50-293/86-01
This refers to the routine safety inspection (50-293/86-01) conducted by Dr.
M. McBride of this office on January 1, 1986 to February 17, 1986 at the Pilgrim
Nuclear Power Station, Plymouth, Massachusetts, of activities authorized by NRC
License No. DPR-35 and to the discussions of our findings held by Dr. M. McBride
with Mr. C. Math'is'and other members of your staff periodically during the inspec-
tion and at the conclusion of the inspection.
Areas examined during this inspection are described in the NRC Region I Inspection
Report which is enclosed with this letter.
Within these areas, the inspection
consisted of selective examinations of procedures and representative records, in-
'
terviews with personnel, and observations by the inspector.
This inspection report indicates that certain nonsafety control room equipment is
not being well maintained and that some potentially distracting control room an-
nunciators are not being properly cleared or deactivated. We believe management
attention should be given to this problem to ensure that a clear policy axists and
is implemented.
Based on the results of this inspection, it appears that one of your activities
was not conducted in full compliance with NRC requirements, as set forth in the
Notice of Violation, enclosed herewith as Appendix A.
This violation has been
i
categorized by severity level in accordance with the revised NRC Enforcement Policy
(10 CFR 2, Appendix C) published in the Federal Register Notice (49 FR 8583) dated
March 8, 1984.
You are required to respond to this letter and in preparing your
,
response, you should follow the instructions in Appendix A.
~ ~ '
j
The responses directed by this letter and the accompanying Notice are not subject
to the clearance procedures of the Office of Management and Budget as required by
the Paperwork Reduction Act of 1980, PL 96-511.
Your cooperation with us in this matter is appreciated.
Sincerely,
9603200289 860313-
M8%
ADOCK 05000293
D
G
Edward C. Wenzinger, Chief
Projects Branch No. 3
4
Division of Reactor Projects
j
ZW
g\\
..
-w
-.--- . -
--
--g
+--
g
p9,
,,--,._--.---g-,---
_ , . > ,
,,,,.p,.
-,.v--.-9
.-,,,,c.
%
._w,,.y3-rP-.=-iw'e
- -*a
w---m-9g-Twy,
---w-4'
-
_
-
.
-
-
- .
-
..
<
.
s
1
Boston Edison Company M/C Nuclear-
2
MAR 131986
Enclosures:
1.
Appendix A, Notice of. Violation
2.
NRC Region I Inspection Report No. 50-293/86-01
cc w/ encl:
A. V. Morisi, Manager, Nuclear ~ Management Services Department
C. J. Mathis, Station Manager
Joanne Shotwell, Assistant Attorney General
Paul Levy, Chairman, Department of Public Utilities
Plymouth Board of Selectmen
Plymouth Civil Defense Director
Senator Edward P. Kirby
Public Document Room (PDR)
local Public Document Room (LPDR)
Nuclear Safety Information Center (NSIC)
,
NRC Resident Inspector
Commonwealth of Massachusetts (2)
4
bcc w/ encl:
Region I Docket Room (with concurrences)
DRP Section Chief
-
Senior Operations Officer (w/o encls)
W. Raymond, SRI, Vermont Yankee
T. Shedlosky, SRI, Millstone 1&2
J
H. Eichenholz, SRI, Yankee
P. Leech, LPM, NRR
.
i
4
I RP
R
P
McBride/meo
Tripp
Wq zin r
J / /86
3[gy(,
3
0FFICIAL RECORD COPY
!
.
-
. - . . . . . . . - . . . - - .
. . .
..-.. . _-,-, ..-.-..-.-.- - ...-...- - .- - .- .
-,-